Skip to main content
Official casework recordDismissedCurrent release

Appeal 3359168

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as the construction of a single storey utility room on the side and extend front porch up to the existing house boundary.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Appeal Procedure

    The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.

  3. Section 04

    [name]

    The main issues are a) whether the proposal would result in an increased risk of flooding; and b) its effect on the character and appearance of the area.

  4. Section 05

    [name]

    A Flood Risk Assessment (FRA) was submitted as part of the planning application to which the Council has had regard. No additional information has been provided with the appeal. Core Policy 8 of the Slough Local Development Framework Core Strategy 2008 (CS) seeks to ensure that there is minimal risk of flooding to the property, development will not impede the flow of floodwaters, increase the risk of flooding elsewhere or reduce the capacity of a floodplain. It explains that development must manage surface water arising from the site in a sustainable manner which will also reduce the risk of flooding and improve water quality.

    The FRA sets out the mitigation measures of the development. It does not acknowledge how it would reduce the impact on the adjoining land nor an evacuation plan. Whilst the development is minor, it would still increase the built form and run off and resultantly would take up storage capacity in the ground without understanding how or where the excess water would be drained. I appreciate that the development is small in scale, however it is no less important to establish any potential impact it would have in flood risk terms with the aims of the development plan in mind.

    In regard to the previous scheme which was allowed at appeal without a FRA or any further assessment on the impact of flooding, it appears it was not raised as a reason for refusal and this, along with the information that was submitted at the time, did not result in a disputed issue at appeal. With this and the above in mind, the proposal would conflict with the aims of Core Policy 8 of the CS and the National Planning Policy Framework (the Framework) which I have set out.

  5. Section 06

    Character and Appearance

    The Council appear to have an issue with the accuracy of the plans which has translated into a reason for refusal. However, for the purpose of establishing a sufficient indication of the visual impression of the scheme and to understand its impact on the character and appearance of the area, they go far enough.

    The appeal site is located within a small enclave of dwellings to which the side elevation faces the entrance to the street. The aforementioned permission is extant due to being partially implemented. This scheme is similar to the extant one by virtue of the front extension, however it is to wrap around the side elevation and enlarge the front. The semi-detached pair are already unbalanced as a result of the previously approved loft conversion. The wider enclave is detached from this set of semi-detached dwellings and are different in their appearance. These features result in a varied yet pleasant street scene which contributes positively to the character and appearance of the area.

    The appeal proposal would clearly be subservient to the existing dwelling in both height and scale even in combination with previous extensions. Whilst the front extension would be larger than previously permitted, it would not be so significant in scale terms, even in combination with the side extension, to result in unacceptable harm to the character or appearance of the area. It would result in an increase in an imbalance to the semi-detached dwelling however, due to the varied character it would sit congruously. Moreover, and whilst the proposal would be visible when entering the close, it would clearly be a subordinate addition which would not detract from or unacceptably shield the side elevation of the building.

    The proposal would not therefore detrimentally change the building to result in unacceptable harm to the character and appearance of the area. Therefore, it would comply with [name] EN1, EN2 and H15 of the Slough Local Plan 2004, Core Policy 8 of the CS and DP1 and EX1 of the Residential Extensions Guidelines Supplementary Planning Document which, together, seek to ensure that development proposals are of a high-quality design and standard amongst other things.

  6. Section 07

    Other Matters

    The submitted drawings also include measurements, but those provided for the side elevation and floor plan for the side extension do not match. The appellant advises that thickness of the walls has been added to the floor plan but not the elevations. This is not clear, and the elevations should also take this into account and resultantly not have a difference. This therefore casts doubt as to the exact dimensions to which the proposal would be built if it was approved. Notwithstanding that the appeal scheme is recommended for dismissal on other grounds, the plans would not be sufficiently exact to be enforceable and would thus not be able to be secured by condition.

    The appellants are also seeking to add solar panels to the side extension to improve the energy efficiency of the property. However, no details have been provided and therefore only little weight can be given to their potential installation.

  7. Section 08

    Conclusion and Recommendation

    The proposed development would not comply with the development plan, specifically in regard to the first main issue. I have found in the appellant’s favour on the second, but this would be a lack of harm and thus neutral in any balance. I have been given no compelling reason, taking into account other material considerations advanced, to deviate from the development plan. I therefore recommend that the appeal should be dismissed.

  8. Section 09

    Inspector’s Decision

    I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 1895No official casework-database value to compare
    Extracted decision date · page 1
    6 May 2025Matches the official casework database
    Extracted site visit dates
    25 March 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3359168
Application reference
P/16694/003
Lead case reference
Not recorded
Planning authority
Slough Borough Council
Planning authority code
E06000039

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
No
Historic building grant made
No
Relates to a conservation area
No
Flooding is an issue
Yes
Site within an AONB
No
Site within an SSSI
No

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
18 January 2025
Valid date
20 January 2025
Start date
20 January 2025
Planning authority decision date
16 January 2025
Appeal decision date
6 May 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
69001
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21