Appeal 3359461
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
Demolition of existing chalet bungalow and construction of a pair of semi detached 3 storey, 3 bedroom houses (including lower ground floor below existing ground level) without complying with a condition attached to planning permission [name]/2007/21, dated 14 March 2022.
Section 02
Decision
The appeal is dismissed.
Section 03
Application for costs
An application for costs was made by [name] and [name] against Adur District Council. This application is the subject of a separate decision.
Section 04
Preliminary Matters and Main Issue
The application as submitted to the Council sought to regularise the as built floor levels; and use the lower ground floors for habitable accommodation that could also be used for sleeping. The Officer Report refers to the application having been amended and that the request to use the accommodation for sleeping was omitted. I have not been provided with any corroborating evidence to this effect.
Given that the Council approved the ‘as built’ floor levels and allowed the lower ground floors to be used as habitable accommodation, the appellants’ appeal is in effect only seeking the use of the accommodation for sleeping. The Council’s appeal statement does not reference the change in description. It identified the key issue as being the use of the lower ground floors for sleeping accommodation and sought to defend the restriction. I have therefore dealt with the appeal on that basis.
During the course of the appeal, I sought additional views from both main parties. This established, amongst other things, that the key concern was one of surface water flooding as opposed to coastal/tidal flood risk. The respective comments have been taken into account in my decision.
The main issue is therefore whether the lower ground floors could be used as sleeping accommodation, having regard to the flood risk from surface water.
Section 05
Reasons
Based on the ground levels and potential depth of flooding, the lowest floor level required to avoid the houses being flooded is said to be 6.13m AOD. However, as built, water could enter the lower ground floor areas of the houses. As this could potentially occur quickly it would thus pose a risk to life if someone were asleep in the lower ground floor accommodation.
This calculation is based on Environmental Agency Surface Water Maps and the originally submitted Flood Risk Assessment. I have not been provided with site-specific modelling which provides alternative or more accurate figures.
The appellant suggests that the range of flooding depth upon the maps is not accurate, and the risk at the site is very low. However, no further explanation is provided as to why this might be the case. Reference is made to an online service for flood mapping, which was not available in 2022, when the original scheme was approved. This suggests the site has a maximum of 5.50m AOD for flooding but no further details or substantive evidence is provided.
Similarly, it is pointed out that in the past when there has been extreme weather in the area there is no recorded flooding around the site. In addition, it is said that long term flood reports on the government’s website forecast a low flood risk. However, given that according to the Planning Practice Guidance, surface water flooding is likely to occur with a 1% annual probability (a 1 in 100 chance each year) and there should be an allowance for climate change, it is reasonable to conclude that past experiences cannot be relied upon as an accurate prediction of future events and that a precautionary approach is advisable.
Condition 14 of the original planning permission required details of the surface drainage scheme for the development. Details have previously been provided and were agreed by the Council. I do not doubt that the information and evidence submitted to discharge the condition was extensive. However, there is nothing before me to indicate that it addressed the issue of surface water flooding. Indeed, had the condition been seeking to address that matter, there would logically have been no need for the restriction on the use of the lower ground floors.
I have been referred to the existence of a lifting station within the external courtyard and which has an audible alarm should power be disconnected. I am not aware that this is specifically designed to address surface water flooding. I also have no information as to when power would likely be lost should the device be affected by surface water flooding, nor any details of the alarm or sound proofing qualities of the glazing on the building. As such, this does not provide me with sufficient certainty that it would address the concerns identified above.
Overall, the information and evidence before me does not provide the level of certainty that at this stage any residual flooding risk can be safely managed. It is open to the appellant to discuss the matter further with the Council but the approach for allowing development in areas at risk of flooding, as set out in the National Planning Policy Framework (the Framework), cannot currently be demonstrated. I do not therefore have a sufficiently robust basis on which to agree to the variation of the condition.
Section 06
Other Matters
The appellant suggests that the condition, by restricting the accommodation to being non-sleeping, would be contrary to the ‘six tests’ for a condition, as set out in Paragraph 57 of the Framework. However, conditions restricting sleeping accommodation to certain parts of a building are commonplace where there is a risk of flooding and to do otherwise would necessitate the scheme being rejected. I do not find the condition contrary to the tests and there is nothing in the appellant’s submissions which lead me to a different conclusion.
Article 8 of the [name] on Human Rights provides that everyone has the right to respect for their private and family life and their home. Article 1 of the [name] states that every person is entitled to the peaceful enjoyment of their home. These rights are enshrined in the Human Rights Act 1998.
These are however qualified rights, and interference may be justified where it is in accordance with the law and is necessary in a democratic society, applying the principle of proportionality. I acknowledge that the consequence of dismissing the appeal would be that the appellant’s free use of all rooms in the houses would be restricted. However, in this case interference with these rights is justified as it is in the public interest to protect those who might be living in the properties during periods of flooding. As such, it is a proportionate and necessary response that would not violate the appellant’s rights under Article 1 of the [name] or Article 8.
It is said the Council has acted inconsistently in comparison to a case at [address]. However, no substantive details of that case or the inconsistency have been provided. It is therefore not possible for me to attribute more than very limited weight to this matter in my decision.
Similarly, that other properties in the vicinity have lower floor levels than the appeal site is not a reason in itself to allow something which has not been demonstrated to be safe.
I have not had further regard in this decision to concerns over how the Council handled the application as this is an administrative matter to be taken up directly with them. I have focused on the planning merits of the scheme in regard to the main issue of the case.
Section 07
Conclusion
Section 38(6) of the Planning and Compulsory Purchase Act 2004 provides that decisions should be determined in accordance with the development plan unless material considerations indicate otherwise. In this case, the Council does not suggest that there would be conflict with any particular policies of the development plan. Nevertheless, the Framework represents a material consideration which in this case, for the reasons given above, causes me to conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Costs Decision
- Extracted inspector · page 1
- Inspector attribution ID 272No official casework-database value to compare
- Extracted decision date · page 1
- 23 July 2025Matches the official casework database
- Extracted site visit dates
- 30 April 2025 (page 1)
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 272No official casework-database value to compare
- Extracted decision date · page 1
- 23 July 2025Matches the official casework database
- Extracted site visit dates
- 30 April 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3359461
- Application reference
- AWDM/1058/24
- Lead case reference
- Not recorded
- Planning authority
- Adur District Council
- Planning authority code
- E07000223
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Minor Dwellings
- Appeal type reason
- 4. Grant planning permission for the development subject to conditions to which you object
- Appeal reason
- Appeal Against Conditions
- Type detail
- Planning Appeals - Other
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 130 m²
- Number of residences
- 2
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- No
- Historic building grant made
- No
- Relates to a conservation area
- No
- Flooding is an issue
- No
- Site within an AONB
- No
- Site within an SSSI
- No
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 23 January 2025
- Valid date
- 31 January 2025
- Start date
- 13 February 2025
- Planning authority decision date
- 7 November 2024
- Appeal decision date
- 23 July 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Yes
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 73461
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21