Skip to main content
Official casework recordSplit DecisionCurrent release

Appeal 3359567

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

for a single storey side extension with dormer extension to side.

  1. Section 02

    Decision

    The appeal is dismissed insofar as it relates to the dormer extension.

    The appeal is allowed and planning permission is granted insofar as it relates to the single storey side extension at [site address] , Roby, Knowsley [postcode] in accordance with the terms of the application, Ref 24/00547/FUL, dated 11 October 2024, and the plans submitted with it, so far as relevant to that part of the development hereby permitted and subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The single storey side extension hereby permitted shall be carried out in accordance with drawing nos. A100 Site and [name], A103 [name] and A104 [name].

    The external materials of the single storey side extension hereby permitted shall match those used in the existing dwelling.

  2. Section 03

    Preliminary Matters

    The Council has only raised substantive concerns with regards to the proposed dormer extension and not in reference to the proposed single storey side extension. From the evidence before me, I see no reason to disagree with the Council’s position with respect to the single storey side extension. I am satisfied that the dormer extension is clearly severable from the single storey side extension, as it is physically and functionally independent. Therefore, under section 79(1)(b) of the Town and Country Planning Act 1990, I have the power to issue a split decision in this case.

    The Government published a minor revision to the National Planning Policy Framework (the Framework) on 7 February 2025. Those parts of the Framework most relevant to this appeal have not been amended. As a result, I have not sought comments on the minor revision to the Framework, and I am satisfied that no party’s interests have been prejudiced by taking this approach.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposed dormer extension on the character and appearance of the host building and the surrounding area.

  4. Section 05

    Reasons

    The appeal property is a detached 2-storey house located within a large modern housing development. The estate contains different house types, of which the majority are 2-storey in height, with either gable end or hip end roof designs. The variety of the house types are complementary and there is consistency in terms of layout, scale, mass and form that contributes towards the consistent and pleasant character and appearance of this modern suburban area.

    The appeal property has a gable end roof design, and the ridgeline runs perpendicular to [address]. The proposed alterations to the roof would take the form of a large flat roof dormer, occupying a significant proportion of the south facing roof slope. Consequently, the dormer would dominate and give a bulky, top-heavy feel to the southern roof slope, that would result in the house appearing unbalanced. This would harm the character and appearance of the existing house. Moreover, as the proposed dormer would be highly visible from [address] and neighbouring properties, it would also be detrimental to the character and appearance of the surrounding area.

    I have considered the argument that there are other dormers in the locality of the appeal property. I observed that the front dormers to a limited number of properties that face a circular shaped landscaped feature on [address] were significantly smaller than the proposal before me. A similar dormer to that proposed is located on a house at the end of a nearby cul-de-sac, that is not readily visible from the street. Moreover, that dormer faces a wooded area along the boundary with a neighbouring site. As such, these other dormers are not directly comparable to the circumstances of the appeal site and the proposal, and they do not reduce the harm the proposal would cause or make it otherwise acceptable. I have considered the appeal before me on its individual merits.

    For the above reasons, I conclude the dormer extension would have a harmful effect on the character and appearance of the host building and the surrounding area. As such, it would be contrary to Policies CS2 and CS19 of the Knowsley Local Plan Core Strategy and saved Policies H5 and H8 of the Knowsley Replacement Unitary Development Plan. These policies seek good quality design that responds to its surroundings, and extensions which are not disproportionate to the original dwelling. The proposal would also be contrary to the Council’s Householder Development Supplementary Planning Document, which states that dormers should not be so large as to dominate the roof slope resulting in a dwelling which appears unbalanced.

  5. Section 06

    Conditions

    With regards to the proposed single storey side extension, and in addition to the standard time condition, I have imposed a condition requiring that the development is carried out in accordance with the approved plans, as this provides certainty. A condition is also necessary for materials to match those used on the existing house to protect the character and appearance of the area.

  6. Section 07

    Conclusion

    The appeal proposal includes two different elements. Having had regard to the development plan as a whole, the Framework and all other matters raised, I dismiss the appeal in respect of the dormer extension. However, I allow the appeal in respect of the single storey side extension.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4578No official casework-database value to compare
    Extracted decision date · page 1
    28 April 2025Matches the official casework database
    Extracted site visit dates
    25 March 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3359567
Application reference
24/00547/FUL
Lead case reference
Not recorded
Planning authority
Knowsley Metropolitan Borough Council
Planning authority code
E08000011

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
No
Historic building grant made
No
Relates to a conservation area
No
Flooding is an issue
No
Site within an AONB
No
Site within an SSSI
No

Decision and dates

The published outcome and every imported case date.

Official decision
Split Decision
Decision category
Split decision
Received date
26 January 2025
Valid date
28 January 2025
Start date
20 February 2025
Planning authority decision date
6 December 2024
Appeal decision date
28 April 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
68602
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21