Appeal 3359909
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the removal of an existing porch and the erection of a two storey front porch extension.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The main issues are: • Whether the proposal would be inappropriate development in the Green Belt; • The effect of the proposal on the openness of the Green Belt; • If the proposed development would be inappropriate development, whether any harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations, so as to amount to very special circumstances necessary to justify the proposal.
Section 04
Whether Inappropriate Development
The appeal relates to a large 3 storey detached dwelling that is located in a backland location within a settlement of dwellings that have been washed over by the Green Belt.
Policy SP4 of the Central Bedfordshire Local Plan 2015-2035 (2021) (Local Plan) includes a general presumption against inappropriate development in the Green Belt and states that proposals will be assessed against the National Planning Policy Framework (the Framework) and Planning Practice Guidance. The Framework establishes that new buildings within the Green Belt are inappropriate unless, amongst other things, it involves the extension of a building. This is providing it does not result in disproportionate additions over and above the size of the original building.
Neither the Framework nor the [name] define ‘disproportionate’. However, the [name], 2023 (SPD) states that, as a guiding principle, in order to be considered as proportionate the original building should not be added to by more than 60% of the footprint, floorspace and volume.
It is common ground between the main parties that [site address] has previously been extended at 2 storey level to the side and rear with a raised roof. The Council’s planning officer report also identifies that a detached triple garage has been granted planning permission, which I saw had been constructed on my site visit. The Council sets out that the total footprint of the proposal together with the other existing extensions would be approximately 168% more than the footprint of the original building. It also calculates that the floorspace of the original building would be expanded by 243% as a result of the proposal and existing extensions. I have no substantive reason to question these figures.
Based purely on these statistical measurements the proposed extension would lead to a substantial cumulative increase in the size of the original building. However, assessing proportionality is primarily an objective test based on size. Although the proposal would only have around a 5.3 metre2 larger floor area than the existing porch that is to be demolished, it would add to the bulk of the existing building, and consequently result in a significant cumulative increase in the volume, scale and massing of the original building.
As such, adding the proposed two storey porch extension to the other extensions would result in disproportionate additions over and above the size of the original building. Consequently, the proposal would constitute inappropriate development that is, by definition, harmful to the Green Belt and in conflict with Local Plan Policy SP4 and advice within the SPD.
Section 05
Openness
Paragraph 142 of the Framework advises that the fundamental aim of Green Belt policy is to prevent urban sprawl by keeping land permanently open. This openness is an essential characteristic of the Green Belt and has a spatial and visual aspect.
The proposal has been designed so that it would not harm the character and appearance of the property or the surrounding area. Nonetheless, the scale and bulk of the [site address] would be increased. Whilst it is surrounded by dwellings the proposal would still be apparent from certain vantage points along [address]. This would inevitably result in a reduction in the visual and spatial openness of the Green Belt, albeit to a modest extent.
Section 06
[name]
It has been put forward that the proposal would improve the functionality and appearance of the dwelling and that it would not have a detrimental effect on the character and appearance of the surrounding area or the amenity, including the privacy of neighbouring occupiers. It has also been put to me that it would not create additional living space but would allow for larger pieces of furniture to be taken upstairs. However, these matters did not appear to be contentious in the appeal and the absence of harm in these respects would be neutral, and therefore not attract any positive weight in the overall Green Belt balance.
The lack of objections from local residents has also had no bearing on the outcome of this appeal as I have only had regard to the planning merits of the proposal that is before me.
Section 07
Green Belt Balance and Conclusion
I have identified that the proposal would be inappropriate development in the Green Belt as defined by the Framework. The Framework establishes that substantial weight should be given to any harm to the Green Belt. In addition, it would also modestly reduce the openness of the Green Belt. Therefore, even when taken together, the other considerations reviewed above do not clearly outweigh the harm that the proposal would cause. Consequently, the very special circumstances that are necessary to justify inappropriate development in the Green Belt do not exist. As a result, the proposed development conflicts with Local Plan Policy SP4 as set out above, and with Section 13 of the Framework which both seek to protect Green Belt land.
The appeal scheme consequently conflicts with the development plan and there are no material considerations including the Framework that warrant taking a decision otherwise than in accordance with it. The appeal should therefore be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 592No official casework-database value to compare
- Extracted decision date · page 1
- 9 July 2025Matches the official casework database
- Extracted site visit dates
- 1 July 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3359909
- Application reference
- CB/24/02972/FULL
- Lead case reference
- Not recorded
- Planning authority
- Central Bedfordshire
- Planning authority code
- E06000056
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- Yes
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- No
- Flooding is an issue
- Not recorded
- Site within an AONB
- No
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 31 January 2025
- Valid date
- 31 January 2025
- Start date
- 18 February 2025
- Planning authority decision date
- 16 December 2024
- Appeal decision date
- 9 July 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 72644
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21