Appeal 3360347
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
single-storey rear extension, first floor extension with new roof over to include side gables and balcony to rear.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue is whether the development would be at risk from damage by wave action.
Section 04
Reasons
The appeal property is a detached bungalow located within a row of similar bungalows and chalet bungalows with rear elevations facing onto the beach which is immediately beyond [address].
The main parties agree that the site is located within an [name] (OHZ). This area along [address] is classified as hazardous, as buildings and property can be damaged by wave action. Policy CC7 of the Canterbury Local Plan (2017) (Local Plan) states that within the OHZ no development will be permitted. Within the Local Plan paragraph 7.46 confirms that the properties are in front of the main sea defence bund and are at risk from direct flooding by the sea.
The provision of an upper storey could provide safe refuge at first floor level in the event of wave overtopping. I acknowledge that this could also prevent or minimise damage to furniture, electrical systems and appliances. The appellant indicates numerous other benefits that the first floor accommodation would have in the event of flooding, including easier access for rescue operations, protection for critical infrastructure, compliance with flood management regulations, psychological and social benefits and long-term resilience and future proofing of the property. A range of flood resilience measures are also proposed and include the location of high-level plug sockets, ground floor finishes and non-return valves provided to all foul water drains.
However, Local Plan policy CC7 does not indicate that exceptional circumstances could provide justification for development. Indeed, the policy is unequivocal that no development is to be permitted within the OTZ. This restriction of development within the OTZ includes extensions to existing properties, regardless of whether they involve the inclusion of upper floor accommodation. The description of the overtopping zone as ‘hazardous’ indicates that there is significant concern about the prospect of wave damage to buildings. As a result, I attach considerable weight to the policy approach.
My attention has been drawn to examples of other extensions and replacement dwellings at Numbers 297, 287, 282 and [address]. I have not been provided with further details in relation to these, however, I note that the appeal at 297 Faversham Road1 was determined prior to the adoption of the Local Plan which includes Policy CC7 which precludes all development within the OHZ. For this reason, I do not consider that it creates a precedent for additional residential extensions within the OHZ.
For the above reasons the proposal would be at risk from damage by wave action. It would therefore conflict with Policy CC7 of the Local Plan which states that no development will be permitted within the OHZ.
Section 05
Other Matters
The appellant indicates that the proposal will enhance the appearance of the property and improve its marketability. I note that the Council has not raised the effect of the proposal on the character and appearance of the area as a concern. Be that as it may, these matters do not outweigh the harm I have identified.
Section 06
Conclusion
For the above reasons, having had regard to the development plan as a whole along with all other relevant material considerations, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3395No official casework-database value to compare
- Extracted decision date · page 1
- 19 June 2025Matches the official casework database
- Extracted site visit dates
- 12 June 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3360347
- Application reference
- CA/24/02188
- Lead case reference
- Not recorded
- Planning authority
- Canterbury City Council
- Planning authority code
- E07000106
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 65 m²
- Number of residences
- 1
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 9 February 2025
- Valid date
- 8 February 2025
- Start date
- 21 February 2025
- Planning authority decision date
- 3 February 2025
- Appeal decision date
- 19 June 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 71541
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21