Appeal 3360666

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as ‘single storey rear extension, internal and external alterations and new front porch’.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The main issue is the effect of the proposed rear extension on the character and appearance of the host dwelling and its significance as a non-designated heritage asset.

  3. Section 04

    Reasons

    Policy DC19 of the Wealden Local Plan 1998 (the WLP) states that extensions to dwellings should normally be of an appropriate size and character relative to the original dwelling, and not visually dominate or otherwise adversely change the character of the existing building. The supporting text states that traditional buildings of rural character, including oasts, also warrant careful regard to their character. The Wealden Design Guide Supplementary Planning Document 2008 (the SPD) advises that proposed extensions should maintain or enhance the original character of the dwelling, including that they should be subordinate to the dwelling and be of a width no greater than half that of the existing dwelling.

    The proposed extension would be a distinctly modern addition to the back of the house. Its design and appearance, including contemporary building materials and glazing, would not attempt to merge with or replicate the characteristics of the host building, but would instead allow the main building to remain visually distinct. Further details of the materials and finishes would be necessary if the appeal were otherwise allowed, however, I find the proposed design approach to be appropriate.

    Nonetheless, the scale of the proposed extension would dominate the rear elevation of the building through occupying nearly the entire width of the main rear elevation and overlapping the flank wall of the existing rear utility addition. Furthermore, its depth would be comparable to that of the main house, nearly doubling its overall depth. It is not apparent how the retention of the original rear walls, once internalised as a result of the extension, could reasonably be secured. For these reasons in combination the extension cannot be described as subordinate, or of an appropriate size to the original dwelling as described in the development plan and the proposal would conflict with Policy DC19 of the WLP and the SPD. In turn the proposal would also conflict with WLP Policy GD2 which requires development in this location to accord with specific policies in the Plan.

  4. Section 05

    Heritage

    The Council consider the building to be a non-designated heritage asset (NDHA). Given the building’s substantially intact architectural style, which reflects the landscape’s agricultural heritage, it has some historic significance. This is apparent in views from the road and to a lesser extent in longer views from the valley to the rear, from where the building’s significance is experienced within its rural setting. The building has clearly been subject to alterations in the past in association with its residential use, including some untraditional window replacements, a curved front bay and a small rear extension which is substantially glazed with plastic framing. Nonetheless given their scale, these alterations do not detract from nor substantially reduce the historic significance of the building when read as a whole. Based on the evidence and findings of my site visit, the building’s significance is derived not only from the roundel and cowl, but also the building it is attached to.

    In the absence of evidence to conflict these findings, I have therefore treated the existing building as a NDHA. While the Planning Practice Guidance (PPG) advises that only a minority of buildings have enough heritage significance to merit identification as a NDHA, this alone does not convince me that [name] should not be treated as one.

    For the reasons set out above, the proposal would cause harm to the significance of the NDHA through its width and depth and consequent dominance of the rear elevation. I find the level of harm to be moderate, given the position of the proposed extension. The proposal would therefore also conflict with Spatial Planning Objectives SPO1 and SPO2 of the Council’s Core Strategy 2013 insofar as they relate to the District’s distinct landscapes and historic environment, of which the site forms a part.

  5. Section 06

    Balance

    Paragraph 216 of the National Planning Policy Framework (the Framework) requires that, in weighing applications that directly or indirectly affect NDHAs, a balanced judgement will be required, having regard to the scale of any harm or loss and the significance of the heritage asset.

    In terms of benefits, the proposal would provide open living space which the appellant considers the existing house is unable to provide. It has not been substantiated, however, that this is the only option to achieve this benefit and I give this limited weight.

    The appellant has put forward a fall-back position which comprises a single storey rear extension which could be constructed without planning permission. A lawful development certificate confirms this and I have no reason to doubt that the appellant would otherwise implement that development if this appeal were to be dismissed. The fall-back scheme would entail an extension in a similar position but slightly narrower, providing separation to the rear utility extension and having a lesser projection from the back of the building. Its overall depth would therefore be similar to that of the existing utility addition, and less than the depth of the main house. Although the maximum height of the fall-back scheme would be slightly higher than the appeal scheme, it would have a lower eaves level, broadly consistent with the existing utility. In combination these factors would result in the fall-back scheme being a less overbearing extension to the rear elevation. The design and materials of the fall-back scheme would have a more typically domestic appearance, being more solid and akin to a suburban setting which would be regrettable here and would conflict with the character of the existing house. Nonetheless, as a result of its dimensions and relationship to the utility projection, I find the fall-back position overall would have a less harmful effect on the character and appearance of the main building and its significance as an NDHA than the appeal scheme. Accordingly, it attracts limited weight as a consideration in favour of the appeal scheme.

    For these reasons there are not material considerations of sufficient weight to outweigh the conflict with the development plan, or to justify the harm to the NDHA having regard to the test of paragraph 216 of the Framework.

  6. Section 07

    Other Matters

    The appellant has referenced extensions to other historic buildings, including oast houses, where the extensions are of varying scale and incorporate distinctly contemporary designs. However, I do not have full details of the circumstances under which they were granted or the reasons they were considered acceptable. As such I cannot be satisfied that their circumstances are the same as this appeal scheme.

  7. Section 08

    Conclusion

    For the reasons given, the proposal would conflict with the development plan and there are not material considerations of sufficient weight which indicate that a decision should be made other than in accordance with it.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 494No official casework-database value to compare
    Extracted decision date · page 1
    9 July 2025Matches the official casework database
    Extracted site visit dates
    3 July 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3360666
Application reference
WD/2024/2339/F
Lead case reference
Not recorded
Planning authority
Wealden District Council
Planning authority code
E07000065

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
44 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Yes
Historic building grant made
No
Relates to a conservation area
No
Flooding is an issue
No
Site within an AONB
Yes
Site within an SSSI
No

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
14 February 2025
Valid date
17 February 2025
Start date
21 February 2025
Planning authority decision date
25 November 2024
Appeal decision date
9 July 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
72650
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21