Appeal 3361406
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
construct 5no centre kerbs and 2no taper kerbs to allow vehicle access to driveway.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue is whether condition 5 is reasonable and necessary in the interests of highway safety.
Section 04
Reasons
The development has been implemented. The driveway currently has a block pave edging, and a Type 3 open core graded aggregate surface. In addition, a channel drain runs along the highway boundary which drains into a soakaway. There is approximately 40cm between the loose aggregate and the highway boundary.
With all loose aggregates there is a possibility of the material spreading to the highway with the movement of pedestrians and vehicles over the surface. This is more likely on sloping surfaces, such as the appeal site. The introduction of such deleterious material has the potential to cause highway safety issues for all users of the highway, by potentially causing a loss of traction or by the material being spun off, leading to accidents.
Whilst the appellant states that loose material has not escaped onto the highway since the installation of the current arrangement four years ago, if condition 5 were to be omitted there would be no future controls as to the driveway surfacing material. As such, I cannot be certain that a loose material with a higher likelihood of spilling onto the highway would not be installed.
The appellant contends that the prescribed distance of 5m behind the highway boundary is arbitrary and lacks credibility. However, this distance is the approximate length of a car and as such provides a sufficient buffer to limit the loss and spread of loose material from the driveway which a lesser distance would not be as effective at doing.
Consequently, I find that condition 5 is reasonable and necessary in the interests of highway safety. As such, the condition passes the six tests set out in paragraph 57, and is in accordance with paragraph 116 of the National Planning Policy Framework (Framework) insofar as it seeks to ensure highway safety
Section 05
Other Matters
The appellant references Schedule 2, Part 1, Class F of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) and Government Guidance on the permeable surfacing of front gardens. Nevertheless, the appeal relates to an application for full planning permission and must be assessed as such.
It is asserted that Tarmacadam or a similar hard bound material would contradict the above permitted development rights and guidance as well as increase the risk of flooding. However, there are a number of hard bound surfacing options available which would maintain the permeability of the driveway. Further, a channel drain and soakaway are installed which would deal with any surface run-off from an impermeable surface. Both of these options would meet the referenced guidance.
Section 06
Conclusion
For the reasons outlined above, the development without the condition in place would conflict with the de elopement plan as a whole and therefore, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted decision date · page 1
- 30 June 2025Matches the official casework database
- Extracted site visit dates
- 23 June 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3361406
- Application reference
- 24/00302/FLH
- Lead case reference
- Not recorded
- Planning authority
- North East Derbyshire District Council
- Planning authority code
- E07000038
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 4. Grant planning permission for the development subject to conditions to which you object
- Appeal reason
- Appeal Against Conditions
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 26 February 2025
- Valid date
- 26 February 2025
- Start date
- 11 March 2025
- Planning authority decision date
- 2 September 2024
- Appeal decision date
- 30 June 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 72045
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21