Appeal 3361585
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the erection of a roof extension with dormer windows and a single storey rear extension, following demolition of existing single storey extension.
Section 02
Decision
The appeal is allowed and planning permission is granted for the erection of a roof extension with dormer windows and a single storey rear extension, following demolition of existing single storey extension, at [site address] in accordance with the terms of the application Ref. 24/P/01646 and the plans submitted with it, subject to the conditions set out in the attached Schedule.
Section 03
[name]
The main issues are whether the proposed extensions constitute ‘inappropriate development’ in the Green Belt; the effect on its openness; and, if inappropriate development, whether this is clearly outweighed by very special circumstances.
Section 04
Background
The appeal site comprises a detached bungalow set in a large garden in a ribbon of development where there is a mixture of houses ranging from large two storey houses to relatively small single storey properties. Although a bungalow, the property has accommodation in the roof space lit by three small dormer windows on the rear elevation. The site lies in the Green Belt; the Surrey Hills National Landscape; and an Area of [name] (AGLV).
Section 05
Whether inappropriate development in the Green Belt
The National Planning Policy Framework (NPPF) sets out in paragraph 153 that new development in the Green Belt is inappropriate and should not be approved except in very special circumstances. Paragraph 154 sets out the categories of development which are regarded as exceptions and are not inappropriate. The relevant one to this case is (c) regarding the ‘extension or alteration of a building provided that it does not result in disproportionate additions over and above the size of the original dwelling”. The term ‘original dwelling’ is defined in the Glossary as the building as it existed on 1st July 1948, or if constructed after that date, as it was built originally.
Policy P2 of the Guildford Borough Local Plan: Strategy and Sites (LPSS) mainly restates the NPPF policy, however the related Supplementary Planning Document 2023 (SPD) gives guidance on the interpretation of national and local policy on Green Belts. In terms of the extension or alterations of a building the guidance indicates that the LPSS does not define a particular floorspace or volume percentage increase which may be considered ‘disproportionate’, but suggests a series of factors which will need to be considered along with an increase in floorspace.
In this case the main parties agree that the dwelling was constructed following the grant of permission in 1955. That original dwelling had a floor area in the region of 117sqm. However, there have been a number of permissions for additions since that time as set out in the officer report, but not all of these have been implemented in full. I understand that the existing dwelling has a floor area of about 180sqm and the proposal would add a net increase to about 274sqm which the Council indicate would be a 135% increase from the original property.
However, the appellant has obtained a Certificate of Lawfulness for the addition of a rear single storey extension of about 62sqm as ‘permitted development’ under ref. 24/P/00915. This proposal also includes provision for the erection of a detached outbuilding. Nevertheless, from the information available it appears to me that the outbuilding would be sited too far from the property for it to be part of the assessment taking account of the judgement in Warwick1.
The appellant claims the permitted extension is a fallback position which would have a similar effect on the appearance of the property and on the openness of the Green Belt as the rear element of the proposed scheme. On the evidence submitted it appears to me that this fallback is a material consideration and that there is a reasonable prospect of the addition being constructed rather than it being just a theoretical point. It is therefore reasonable to take that addition into consideration in the floorspace assessment.
Taking account of the scale of lawful extension that may be added, the appellant’s calculations show that the total with the original is in the region of 235sqm (not including the permitted outbuilding) compared to the floorspace proposed in the appeal scheme at 266sqm.
The SPD recognises that relying on floorspace alone is an oversimplification of the issue. It is appropriate to take into account the changes in building volume as that is more likely to have an effect on openness. With the demolition of the existing side extension, the appellant calculates that the external volume of the original plus the permitted development scheme would be about the same as the appeal scheme although this assessment also takes account of the outbuilding.
In terms of the mass of building at the property itself there would be a reduction in the width of the building with the demolition of the side extension, Moreover, although the roof ridge would be raised by about 1.1m I do not see that as being material to the overall bulk of the building as both the permitted and proposed extent of roof accommodates dormer windows front and back. 1 Warwick District Council v Secretary of State for [name] , Housing and Communities [2022] EWHC 2145 (Admin)
The appeal proposal is also of a modest and reasonable scale relative to the size of the plot and the demolition of the side extension would improve the perception of openness around the property and especially in the wider gap to the southern side boundary.
Finally, based on the appellant’s comparative drawings of existing and proposed elevations, I find that the visual perception between the original dwelling, as extended and with some demolition, and the appeal scheme would not appear significantly larger in the overall context of the site.
Taking all of these comparisons into account I conclude that the appeal scheme is within the flexibility envisaged in the SPD and the additions would not result in disproportionate additions over and above the size of the original property as set out in paragraph 154(c) of the NPPF. As such the proposal is not ‘inappropriate development’. Given this conclusion I do not need to consider separately the effect on openness or whether very special circumstances apply.
Section 06
Planning balance
Overall, I find that the proposal accords with the provisions of Policy P2 of the LPSS, and the NPPF when this is read as a whole, and this outcome is not outweighed by any other consideration. The appeal should therefore be allowed.
The Council recommends that three standard conditions be imposed concerning the commencement of the development; accord with the submitted plans; and external materials to match the existing building. These conditions are necessary to define the permission; for clarity; and to ensure that the overall appearance of the enlarged property is appropriate to maintain the character of the area, and I will impose them
Section 07
Conclusion
For the reasons given above I conclude that the appeal should be allowed.
Section 08
Schedule of conditions
The development hereby permitted shall begin not later than three years from the date of this decision.
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building. 3 The development hereby permitted shall be carried out in accordance with the approved plans – [name] 1, 2, 3, 4, 5, 6, 7, 11, 13, 14 and PO3, dated 25 October 2024.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 447No official casework-database value to compare
- Extracted decision date · page 1
- 9 May 2025Matches the official casework database
- Extracted site visit dates
- 30 April 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3361585
- Application reference
- 24/P/01646
- Lead case reference
- Not recorded
- Planning authority
- Guildford Borough Council
- Planning authority code
- E07000209
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 1
- Site in Green Belt
- Yes
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 3 March 2025
- Valid date
- 3 March 2025
- Start date
- 18 March 2025
- Planning authority decision date
- 10 January 2025
- Appeal decision date
- 9 May 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 69315
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21