Skip to main content
Official casework recordAllowedCurrent release

Appeal 3362008

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

10 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

two storey side extension to be used as annex.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for two storey extension to be used as annex at [site address] in accordance with the terms of the application, [name]/24/2330, and the plans submitted with it, subject to the conditions shown at the end of this decision.

  2. Section 03

    Preliminary Matters

    For completeness, I have taken the address from the appeal form.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposal on trees and the setting of the village.

  4. Section 05

    Reasons

    The appeal site at [site address] comprises a modern, semi-detached dwelling located within a modest cul-de-sac development at the edge of the settlement. Set back from the main road, the appeal dwelling and its neighbour are accessed off a driveway behind established and mature trees. The southern boundary of the appeal site is formed by a low timber post and rail fence, behind which are a line of Oak trees with countryside beyond, which contains open fields and sporadic tree planting and vegetation.

    The trees along the boundary do not enjoy protection from being within a conservation area, nor are they protected by a tree preservation order. Nevertheless, whilst individually they are not high value trees, collectively they make a positive contribution to the amenity value of the area and together with the trees alongside the main road, help to form a soft edge to [site address] and manage the transition from built form to countryside.

    The appeal scheme does not propose the loss of any trees, a matter not in dispute. Rather, the concerns relate to firstly, whether the trees would be adequately protected during construction and secondly, whether there would be sufficient space for the trees thereafter.

    The Arboricultural Implications Assessment1 (AIA) advanced, shows that the proposed extension would sit outside of the root protection area (RPA) of the Oak trees. To avoid adverse impacts, in advance of the construction works commencing, it details that protective fencing would be installed along with the laying of ground protection measures within the RPA of the affected trees. Furthermore, a minimal ground intervention foundation system is proposed, utilising a special screw fix/mini-piles and a ground level ring beam foundation system, allowing for the majority of roots beyond the RPA to remain in situ beneath the footprint.

    The Council question the tree protection plan (TPP) set out in the AIA. This is due to the previous [name] dated 2019, submitted alongside the original development for residential development2 (the 2019 permission), which showed a more extensive TPP. However, the Council stop short of concluding that the proposal would cause unacceptable root damage. On the basis of the evidence that I have read, and from my observations on site, I am satisfied that the avoidance measures set out in the AIA would offer adequate protection to the existing trees during construction.

    There is disagreement between the parties regarding the maturity of the trees along the appeal site boundary, with the appellant describing them as ‘young’ whilst the Council believe they are ‘semi-mature’. Irrespective of this, with the majority identified as category C trees, all are expected to have a life expectancy of at least 10 years, with the one category B tree expected to have at least 20 years.

    The trees have been heavily pruned with their canopies set some distance from the dwelling. Even allowing them to adapt with new growth, the trees are unlikely to interfere with the proposed extension for many years and with ongoing maintenance and pruning, they would be able to maintain an appropriate separation distance to allow the trees to successfully coexist alongside the proposal. As such the effect of the proposal on the trees would be an acceptable one, and they would still be able to help to screen the edge of the settlement and continue to positively contribute to biodiversity and climate change.

    Consequently, the proposal accords with Policy DP26 of the Mid Sussex District Plan 2014-2031 (adopted 2018) (DP) which amongst other things expects development to protect trees that contribute to the character of the area. It also meets the expectations of DP Policy DP37 which seeks to protect trees that contribute either individually or as part of a group, to the visual amenity or character of an area from damage or loss.

  5. Section 06

    Other Matters

    An existing cabin type structure is in place to the south side of the appeal property. It is not my role in determining this appeal to establish the lawfulness of this structure, albeit my attention has not been drawn to any planning permission having been granted and I note that permitted development rights were removed in respect of curtilage buildings by Condition 27 of the 2019 permission. Consequently, the presence of the cabin has had limited weight in my decision and is a matter for the Council to take up as they see fit. 1 ref: J65.92 by Broad Oak Tree Consultants Limited, 2024 2 Planning Ref: DM/19/3952

  6. Section 07

    Conditions

    The Council have suggested conditions which I have considered against the necessary tests and amended accordingly, and omitted, for the reasons set out below.

    In addition to the standard time condition (No. 1), in the interests of certainty I have imposed a condition setting out the approved plans (No. 2).

    To ensure that the development is appropriate for the character and appearance of the area, condition (No. 3) requires that external facing materials match those of the existing dwelling.

    To protect the trees along the southern boundary from harm, Condition (No. 4) requires that the tree protection measures detailed on the TPP to be employed prior to development commencing, whilst condition No. 5 requires the use of the specialist foundations advanced.

    For the avoidance of doubt and to ensure the development remains as one planning unit, a condition (No.6) to ensure that the extension is used as part of the existing house is reasonable, and the model condition is therefore imposed.

    As it should be known whether any drain or watercourse lies within 8 metres of the construction area, I do not find the recommended condition to restrict development within this zone to be necessary or reasonable.

    A condition is recommended by the Council to require the removal of the summerhouse/cabin currently located at the side of the property. However, no plan is before me to accurately depict its position and I have no means of securing it. Moreover, the Council have their own powers to require its removal should it be necessary. Therefore, I have not imposed it.

  7. Section 08

    Conclusion

    For the reasons given above the appeal should be allowed.

  8. Section 09

    Schedule of Conditions

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the drawings (unreferenced) comprising [name] and [name], Proposed Block Plan and Location Plan.

    The external materials of the extension hereby permitted shall match those used in the existing dwelling.

  9. Section 10

    Cont’d

    No development shall be commenced until the tree protection measures shown on drawing number J65.92/02 (Tree Protection Plan) within the Arboricultural Implications Assessment by Broad Oak Tree Consultants Limited, dated August 2024 have been implemented on site. These measures shall be retained throughout the construction process.

    The foundation design of the extension hereby approved shall be as set out in the Arboricultural Implications Assessment by Broad Oak Tree Consultants Limited, dated August 2024.

    The extension hereby permitted shall not be used other than as part of the dwelling known as No. [site address] . End of Condition Schedule

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5506No official casework-database value to compare
    Extracted decision date · page 1
    19 January 2026Matches the official casework database
    Extracted site visit dates
    14 January 2026 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3362008
Application reference
DM/24/2330
Lead case reference
Not recorded
Planning authority
Mid Sussex District Council
Planning authority code
E07000228

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
10 March 2025
Valid date
10 March 2025
Start date
20 March 2025
Planning authority decision date
17 February 2025
Appeal decision date
19 January 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
82902
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21