Skip to main content
Official casework recordDismissedCurrent release

Appeal 3362929

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as ‘the change of use of land adjacent to residential use including installation of fence around revised curtilage and addition of dropped kerb’.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Procedural Matters

    The application is made in full for the purposes described in the banner heading above. However, the local planning authority (LPA) has completed its questionnaire on the basis that the appeal relates to a householder development. The difference is potentially important in the way in which biodiversity net gain (BNG) is to be considered.

    On my site visit, I was able to note that the appeal land to the side of No. [site address] , while it is said to be in the ownership of the appellant, is a grassed, unenclosed area abutting the side gable to the property and with a footpath to its opposite border . The appeal land contrasts with the enclosed land which more obviously forms the curtilage to the dwelling.

    Having taken note of the appellant’s description of the proposed development and the references to the change of use of the land and to the revised curtilage to the property, I have determined the appeal on the basis that it relates to a full and not to a householder application.

    The LPA states in its officer report, that had it been able to support the proposal, the issue of BNG could have been determined by way of a condition. I consider that this matter is one of fundamental importance in legal terms, and therefore I have dealt with it as a main issue.

  3. Section 04

    Main issues

    In view of the above the main issues are the impact of the proposed development upon (i) public safety and (ii) BNG.

  4. Section 05

    Public safety

    There is currently a footpath used by the public along the side of the currently unfenced and open appeal land leading from [address] to [address]. The proposed fencing of the appeal land would not prevent the use of the footpath, though it would create a greater tunnelling effect.

    The Police Designing Out Crime Officer has expressed concerns that this might create an area for antisocial behaviour and where the public using the footpath might be in greater danger than now or might feel so. These matters are potentially exacerbated as the footpath is not lit, with the nearest streetlamp some distance away, with intervening hedging and vegetation.

    On my site visit, I was able to note that the footpath is straight between the two roads, allowing views along it, even though there is the slight possibility of hidden areas. I consider that this does reduce the likelihood of crime and the fear of crime.

    In addition, I have no information before me of such criminal or anti-social activity in this residential area. I was able to note on my site visit that there are other such unlit passageways close by. Given the relatively straight and short distance of the path adjacent to the proposed development, I do not find that the proposal would place the public at a significantly enhanced risk. I find that a reasonable degree of surveillance would still be possible in this case. Moreover, I have noted that the [name] has expressed concerns rather than an outright recommendation for the refusal of the appeal proposal.

    Therefore, for the above reasons, I conclude that the proposed development would not be contrary to policy N1 of the Plan for Stafford 2011-2031 (2014) which requires that designs for new development shall provide safe, secure and crime resistant layouts, or with paragraph 135(f) of the National Planning Policy Framework 2024 (the Framework) which also requires designs to create safe, inclusive and accessible spaces.

  5. Section 06

    Biodiversity

    In England, biodiversity net gain (BNG) is mandatory under Schedule 7A of the Town and Country Planning Act 1990 (as inserted by Schedule 14 of the Environment Act 2021) and where, subject to certain exceptions, development must result in at least a 10% improved natural habitat than was there before the proposed development.

    The LPA, in its officer report, considers that the proposed development is not exempt from this legal requirement. However, I have no evidence before me as to the current base-level BNG value of the site or how a 10% enhancement might be achieved. In the absence of such information, and as the 10% minimum level of enhancement is a legal requirement, I am unable to deal with the matter by way of a condition.

  6. Section 07

    Other Matters

    The LPA and the Highway Authority raise no objections to the proposed off-road parking or to the proposed dropped crossing. I have no reason to disagree, but these matters do not alter or outweigh my conclusion regarding BNG.

  7. Section 08

    Conclusion

    [name] have concluded that the proposed development would not have a significantly adverse impact upon public safety, and also that there would be no adverse impacts to the proposed off-street parking and the proposed dropped crossing, there is a lack of evidence to indicate that at least a 10% improvement to BNG can be achieved relative to the existing BNG baseline position. Therefore, I am unable to conclude that the proposal would be acceptable in respect of the statutory BNG. This is a matter of overriding concern and therefore the appeal should be dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 3544No official casework-database value to compare
    Extracted decision date · page 1
    6 May 2025Matches the official casework database
    Extracted site visit dates
    2 May 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3362929
Application reference
24/39261/FUL
Lead case reference
Not recorded
Planning authority
Stafford Borough Council
Planning authority code
E07000197

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
No
Historic building grant made
No
Relates to a conservation area
No
Flooding is an issue
No
Site within an AONB
No
Site within an SSSI
No

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
24 March 2025
Valid date
25 March 2025
Start date
26 March 2025
Planning authority decision date
17 February 2025
Appeal decision date
6 May 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
69037
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21