Appeal 3363760
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as ‘Planning application for 4 sections of railings on the front boundary wall and retrospective Planning application for retention of 4 piers above1m from the ground level’.
Section 02
Decision
The appeal is dismissed.
Section 03
Applications for costs
An application for costs was made by [name] against West Lindsey District Council. This is the subject of a separate decision.
Section 04
Preliminary Matters
The application is partly retrospective, the four brick piers had been erected, but not the railings. These were attached to a wall, with taller gate piers (one of the taller gate piers had been accidentally knocked down). The appellant has also stated that the application did not include the wall below 1m in height, the gates and the gate piers which are shown attached to the proposal. I have therefore proceeded on this basis.
There is also some dispute between the parties in respect of the gates and two gate piers and 9.99cm wall excluded from the application. Within the context of an appeal under section 78 of the Act it is not within my remit to formally determine whether the proposed development or any other development requires planning permission as suggested by the appellant. If the appellant wishes to ascertain whether the wall, gate and gate piers are lawful, they may make an application under section 191 or 192 of the Act.
Section 05
[name]
The main issues is the effect of the proposal on the character and appearance of the area.
Section 06
Reasons
Detached houses set well back from the highway, within generous and, on the whole, well-vegetated plots contribute to the spacious and leafy character of [address]. I saw that a variety of materials are employed in front boundary treatments, however wooden fencing and railings are common, alongside low brick walls, and these are often accompanied by brick piers and hedgerows. Indeed hedges are the principal boundary treatment to some plots and this further reinforces the area’s sylvan character. Moreover, this aspect of the area’s existing character, close to rural fields taken together with the enclosing effect they have on the streetscene and the screening of the houses behind them all contribute considerably to the semi-rural character and appearance of the area.
The proposal seeks permission for four brick piers of approximately 2.8 m in height. These are positioned at regular intervals along the entire length of the 9.99 cm high brick wall. Vertical metal railings of 2.4m in height would be installed between the piers and larger gate piers. The brick used, and the railings are intended to reflect and complement that of the main dwelling.
The visual effect of the proposal cannot be disaggregated from the 9.9m wall in particular. The piers and railings alongside any gates or gate piers or wall would be seen as a whole and as single entity. The resultant visual effect cannot simply be separated from elements they are attached to, in the same way the visual effects of an extension to a house is not solely considered without how it affects the appearance of the host property or the composition of the resultant structure overall.
The 9.99 cm high wall almost covers the entire width of the plot frontage. The number of brick piers proposed and their spacing along the stretch of wall upon which they be situated would draw attention to the width. Whilst proposed brick and railings are high quality, they would be imposing, and overtly urban in their character. This combined with the proposed height and solid design of the brick piers in particular would form a hard built feature across the site frontage that would draw the eye when walking or driving past the site and from homes nearby.
The boundaries of homes on the northern side of [address] tend to have some lengths of soft landscape boundaries. However, whilst ground planting and vegetation and trees would grow through the proposed railings, the imposing brick piers would still appear as dominant elements. In any event, there are no landscape details before me. The proposal would erode the verdant character of the streetscene and consequently appear as a discordant and urbanising feature in stark contrast to semi-rural character of the area.
I readily accept that boundary materials and their scale are varied in the surroundings of the appeal site. However, I have limited details regarding the properties and their boundaries at [address], [address] and [name]. The pictures are not extensive, and the evidence does not suggest that they represent comparable development. Although there are other tall or solid boundary treatments nearby at 1, 5, 11, 19, 24, 30, 45, 73, 55 and [address]. Visually these appeared to be less imposing. None of them exactly reflected the proposal before me in terms of the exact design or composite site frontage coverage as the proposal before me. I have considered the proposal on its own merits, as the presence of other development does not automatically justify development which is found to be harmful.
For these reasons, I conclude that the proposal would cause harm to the character and appearance of the area. As a result there would be conflict with Policy S53 of the Central Lincolnshire Local Plan (April 2023) and Policy 9 of the A Neighbourhood Plan for Sudbrooke 2018-2036 (made 2019). These policies collectively seek amongst other things to ensure that new development, including alterations, relates well to the site, reflects and enhances existing character and distinctiveness. The proposal would therefore be contrary to the National Planning Policy Framework where it seeks to achieve well designed places and that development add to the overall quality of the area. For similar reasons, the proposal would not align with National Design Guide in the same regard.
Section 07
Other Matters
I note there have been no concerns raised by the Council in respect of highway safety, biodiversity, trees or the living conditions of nearby residents. Similarly the Council has not identified that the proposal would infringe on any important or specific views. These are different matter to how the site is seen within the streetscene and the effect on the character and appearance of the area. The absence of harm in these respects weigh neither for nor against the proposal.
The appellant has referred to security, and I can appreciate the need for enclosure on a busy main road. However, it is not clear if a lower or other form of defensible boundary could perform a similar function. Nor is it clear that other security measures have or could be considered. There is no evidence before me, that the piers provide structural support for the 9.99 cm wall as there is no such survey before me. Accordingly, none of these other matters, either taken individually or together, alter my conclusion in respect of the main issue.
Section 08
Conclusion
The proposal conflicts with the development plan and the material considerations do not indicate that the appeal should be decided other than in accordance with it. I therefore dismiss the appeal.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Costs Decision
- Extracted decision date · page 1
- 16 October 2025Matches the official casework database
- Extracted site visit dates
- 22 September 2025 (page 1)
Appeal Decision
- Extracted decision date · page 1
- 16 October 2025Matches the official casework database
- Extracted site visit dates
- 22 September 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3363760
- Application reference
- WL/2025/00107
- Lead case reference
- Not recorded
- Planning authority
- West Lindsey District Council
- Planning authority code
- E07000142
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 8 April 2025
- Valid date
- 8 April 2025
- Start date
- 14 April 2025
- Planning authority decision date
- 11 March 2025
- Appeal decision date
- 16 October 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Yes
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 78040
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21