Skip to main content
Official casework recordDismissedCurrent release

Appeal 3364375

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

5 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

construction of extensions, alterations & associated works.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    The main issue is the effect of the proposal on the character and appearance of the area, with particular regard to the location of the site within the Cornwall National Landscape (CNL).

  3. Section 04

    Reasons

    The appeal site is located within the CNL which benefits from varied landscapes with distinctive characters and natural beauty. The National Planning Policy Framework states that great weight should be given to conserving and enhancing landscape and scenic beauty within National Landscapes. Furthermore, the [name] and Regeneration Act 2023 requires decision makers to actively seek to further the purpose of conserving and enhancing natural beauty within National Landscapes.

    There are a variety of dwellings of differing scale and appearance near the appeal site, including some of contemporary form featuring large areas of glazing which contribute to the character of the settlement of Perranuthoe. Nevertheless, the site is on an elevated plateau and seen in the context of directly adjacent open countryside, within a narrow coastal strip which descends to exposed rock and low-lying headland and contains the [name].

    [name] observed the site to be particularly prominent from the surrounding protected landscape, the existing dormer bungalow, due to its modest size, hipped roofs and recessive materials does not draw the eye or detract from the scenic and tranquil quality of this part of the surrounding landscape and its distinctive character.

    The proposal would result in the appeal dwelling considerably increasing in scale and massing. Whilst maintaining an overall appearance of a dormer bungalow and utilising appropriate facing materials, it would be taller than the existing dwelling and have a significantly larger footprint and lengthened ridge line. Furthermore, the proposal would also feature large, glazed openings on the coastal facing elevations.

    Such an increase in scale in combination with the eye-catching levels of glazing would inevitably attract the eye and appear harmfully conspicuous in the landscape, despite the presence of nearby dwellings. Moreover, the large areas of glazing would increase levels of light spill into the night sky during occupation at this sensitive edge of settlement location, harming the tranquillity of the area.

    Proposed developments should positively reflect the value and sensitivity of the area and integrate appropriately and not detract from the protected landscape. It is inevitable, due to the prominent appeal site location adjacent open countryside within the coastal strip that the identified harm, in its totality, would also extend to the scenic beauty of this part of the CNL. As such, I find Its overall design would fail to integrate into the distinctive landscape and would fail to conserve or enhance the landscape and scenic beauty within the CNL, to which I give great weight.

    There are other dwellings in the area such as those highlighted by the appellant (including that allowed within appeal APP/D0840/W/17/3190815) which are of a larger scale and feature large areas of glazing. Nevertheless, I observed the other sites and their relationship with the landscape and nearby dwellings differ from the case before me. The Inspector in the other appeal found that the proposal would sit lower in the landscape than the closest dwellings that it would be seen in context with, and not intrusive in the overall landscape.

    However, in the case before me due to its spatial relationship with open countryside, and particularly when viewed from the adjacent bridleway, the proposal would be prominent and particularly noticeable in the landscape, notwithstanding nearby residential built form.

    If the appeal proposal were to be dismissed, the appellant suggests the existing dwelling could be extended and additional glazing installed by way of a permitted development fallback. Given that the appellant has stated an intention to enlarge the dwelling, I consider that there is a real prospect of a fallback development taking place.

    However, whilst some examples of the types of permitted developments that could take place have been provided, I have no clear plans or indication of the appearance of any final fallback development. Moreover, given the substantive evidence before me, it is not clear if any fallback development would result in a dwelling of similar or more visual massing or prominence than the proposal before me. I am therefore unable to determine if the fallback would have a similar or greater impact on the CNL. As a result, the potential for the permitted development fallback to be implemented is a matter that carries modest weight.

    To conclude, the proposal would result in harm to the character and appearance of the area and would fail to conserve and enhance the landscape and scenic beauty of the CNL. As such, the proposal is contrary to policies 2, 12, and 23 of the Cornwall Local Plan Strategic Policies 2010-2030, policies HTA2ii, BDL1 and NLB3 of the Perranuthnoe Parish Neighbourhood Plan 2019-30 and Policy C1(7) of the Climate Emergency Development Plan Document 2023. These policies seek, amongst other matters, to ensure development leads to the protection and enhancement of the distinctive landscape and natural character and conserves the landscape character and natural beauty of the CNL.

    The proposal would also conflict with policies PD-P1, PD-P2, PD-P11 and LS-P3 of the [name] Plan 2022-2027, insofar as they seek to conserve and enhance the natural beauty of the CNL

  4. Section 05

    Conclusion

    For the reasons given above, I find that the proposal would conflict with the development plan, read as a whole. No material considerations, individually or cumulatively, indicate that a decision should be taken otherwise than in accordance with it. Therefore, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 3150No official casework-database value to compare
    Extracted decision date · page 1
    29 October 2025Matches the official casework database
    Extracted site visit dates
    21 October 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3364375
Application reference
PA25/00500
Lead case reference
Not recorded
Planning authority
Cornwall Council
Planning authority code
E06000052

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Yes
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
22 April 2025
Valid date
22 April 2025
Start date
22 April 2025
Planning authority decision date
20 March 2025
Appeal decision date
29 October 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
78711
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21