Skip to main content
Official casework recordDismissedCurrent release

Appeal 3364432

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the installation of an air source heat pump.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Procedural Matters

    The Council amended the description of the development and I have used this description above as it is more succinct.

    The appeal property is located within the Green Belt. This matter is not at issue between the parties and the Council has accepted that the proposal is not inappropriate development within the Green Belt. I agree with this assessment and my decision deals solely with the reason for refusal given by the Council.

  3. Section 04

    Main Issue

    The main issue in the appeal is the effect of the proposal on the living conditions of the occupiers of the neighbouring property, No [address] (No 43) by way of noise.

  4. Section 05

    Reasons

    The appeal property, No [address], (No 42) is located within a road of semi-detached properties with uniform front building lines and which are separated from their non-attached neighbouring property by a shared driveway.

    The Microgeneration Certification Scheme (MCS) -Planning Standards indicates that in order to be permitted development an Air Source Heat Pump (ASHP) must be certified to have a sound level that does not exceed 42dB. The proposal exceeds the limits set out in the General Permitted Development Order hence the need to submit the specific planning application.

    The proposed ASHP would be installed behind a porch sited on the side elevation of No 42. Whilst it would face the garage associated with the appeal property away from the side elevation of No 43, the adjacent wall and window within the recessed area in which it would be sited could reflect noise towards No 43. It therefore has the potential to unacceptably harm the living conditions of the occupiers of No 43.

    The Council’s Environmental Health Team have advised that in the light of the noise levels indicated in the MCS assessment, a noise assessment undertaken by an acoustic consultant should be submitted to determine the suitability of the ASHP in this location. [name] appreciate the frustration of the appellant at the initial response from the Environmental Health Team, I do not read their subsequent comments as objecting in principle to the installation of the heat pump. Rather that a full assessment of the proposal and the specific circumstances of the model to be used, its noise levels and the physical environment and context in which it would be placed is required.

    As stated within the National Planning Policy Framework, the planning system supports the transition to a low carbon future and that this includes the use of heat pumps. Policies within the Kirklees Local Plan (Strategy and Policies) (adopted

    (Local Plan) promote sustainable forms of development including low carbon energy generation and the Council has also adopted a target for achieving ‘net zero’ carbon emissions by 2028. Further, whilst no details are given on the energy use and noise levels of the existing boiler system, I accept that the wish to replace this with a modern efficient energy source should be supported. The proposal would therefore make a positive contribution in supporting energy efficiency. However, these benefits relate only to a single property and so only carry moderate weight.

    Whilst mitigation measures to minimise the effect of noise have been suggested, based on the limited information before me, it is not clear what level of noise reduction might be achieved. I also acknowledge that the ASHP would be likely to operate less in the summer months. However, this may not mitigate the potential harm caused when it would be operated. Nor would conditions satisfactorily address these matters.

    In the absence of a noise assessment undertaken by a suitably qualified professional, I am not convinced that the occupiers of No 43 would not experience any adverse issues with regard to noise generation from the siting of the ASHP as proposed. Accordingly, it would conflict with policies LP24 and 52 of the Local Plan and the [address] Extensions and Alterations Supplementary Planning Document. Together these polices require proposals to demonstrate that the quality of the wellbeing of people is not reduced to an unacceptable level due to their potential to increase pollution, from amongst other matters, noise.

  5. Section 06

    Other Matters

    The appellant has cited inconsistencies and disproportionality as to the assessment made by the Council in relation to noise in this case compared with that associated with a nearby housing development. I have some sympathy with the appellant’s perception of such development, but no two sites are the same and I must determine the appeal on the basis of its own merits and the Development Plan unless material considerations indicate otherwise. Such a development therefore does not alter my view in this case. I note too the reference to the Council’s handling of the application, but this is not a matter before me nor does it alter my findings.

    Conclusion For the reasons given, I hereby dismiss the appeal.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 1974No official casework-database value to compare
    Extracted decision date · page 1
    26 June 2025Matches the official casework database
    Extracted site visit dates
    11 June 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3364432
Application reference
2024/62/92807/E
Lead case reference
Not recorded
Planning authority
Kirklees Metropolitan Council
Planning authority code
E08000034

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
22 April 2025
Valid date
22 April 2025
Start date
28 April 2025
Planning authority decision date
14 February 2025
Appeal decision date
26 June 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
71897
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21