Appeal 3364444
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
5 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the erection of a two-storey side extension.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The main issue is the effect of the proposal on the living conditions of the occupiers of [address].
Section 04
Reasons
The site is located at [site address] , it comprises a two storey semi-detached dwelling in a residential area. The adjacent property at No 82 is a bungalow. There is a clear glazed window on the side of No 82, with views towards the side elevation of the appeal property. This window is separated from the appeal site boundary by a narrow single width driveway, which leads to a single storey garage. The joint boundary comprises a low wall, and this provides for a sense of space and openness between the two properties.
The proposal would provide a substantial two-storey side extension. Although the proposal has been amended from previous iterations it would still only be one-metre from the open joint boundary with No 82. The separation afforded by this one-metre gap and the driveway at No 82 is not significant. It would bring built development closer to the habitable window on No 82. Occupiers of this property would be faced with a high and deep solid mass of wall in very close proximity.
Due to the orientation and proximity of No 80 relative to No 82 there would be further likelihood of existing daylight and midday sunlight being affected. The proposal would result in narrower gap between the side windows of No 82 which would be likely to result in a darker environment in the room by obscuring more of the sky. Overall the proposal would have an unduly oppressive and overbearing impact on the outlook from the neighbouring property and would result in an undue sense of enclosure to the side of that property. Consequently the proposal would significantly detract from the outlook currently enjoyed from the room. This would result in harm to living conditions.
Numerous properties have been altered in the area, and there is no dispute that the proposed design and effect on the character and appearance of the area is acceptable, thus meeting the requirements of various development plan policies and the Framework which relate to good design. The proposal would also benefit the appellants and improve the symmetry of the pair of semi-detached dwellings at No 80 and [address]. However, this is a different matter to the effect on living conditions.
I do not have substantive details regarding other proposals in the area or whether the relationship between homes that have been extended were exactly the same as before me. Therefore these do not alter my opinion on the harm caused, which attracts significant weight. The presence of other examples in the area and the suitability and benefits of the design does not override this main issue. Furthermore, at paragraph 135, the Framework seeks to ensure a high standard of amenity for existing occupiers.
I therefore conclude that the proposal would harm the living conditions of the occupiers of [address]. It would therefore conflict with Policies SP4 and DM10 of the Croydon Local Plan (2018). It would also conflict with Policies D3 and D6 of the London Plan (2021). Together these seek, amongst other matters, to ensure design responds to its context, enhances well-being and protects amenity, including ensuring sufficient sunlight to occupiers in surrounding housing.
Section 05
Conclusion
The proposal conflicts with the development plan and the Framework and the material considerations do not indicate that the appeal should be decided other than in accordance with it. For the reasons given above, I conclude the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted decision date · page 1
- 19 June 2025Matches the official casework database
- Extracted site visit dates
- 12 June 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3364444
- Application reference
- 25/00238/HSE
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Croydon
- Planning authority code
- E09000008
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 22 April 2025
- Valid date
- 22 April 2025
- Start date
- 12 May 2025
- Planning authority decision date
- 28 March 2025
- Appeal decision date
- 19 June 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 71561
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21