Skip to main content
Official casework recordAllowedCurrent release

Appeal 3364676

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

6 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

‘Change of use of room within the side extension for mixed personal and business use as a hair salon’.

  1. Section 02

    Decision

    The appeal is allowed and the planning permission Ref 25/00092/FUL for change of use of room within the side extension for mixed personal and business use as a hair salon at [site address] granted on 10 April 2025 by Rochford District Council, is varied by deleting condition 5 and substituting for it the following condition:

    The use of the extension for hairdressing purposes shall not take place other than between the hours of: − Monday to Friday: 0900 hrs to 1430 hrs and 1730hrs to 2100 hrs − Saturday: 0900 hrs to 1600 hrs − Sunday: Nil hours with no Sunday or [name] working.

  2. Section 03

    Background and Main Issue

    Planning permission was granted for conversion of one room in a previously approved single storey side extension, for use as a hair salon for personal and business use. The Council imposed a condition limiting the hours of use to 0900 to 2000 from Monday to Friday and 0900 to 1300 on Saturdays.

    The appellant considers that the finishing hours dictated by the condition are unreasonable. As submitted, the appeal sought extension of the approved hours, to allow the salon to operate until 2100 from Monday to Friday and 1600 or 1700 on Saturdays. However, in response to the Council’s statement of case, the appellant submitted further written representations proposing that a ‘split schedule’ could be introduced. Specifically, it was proposed that the appeal be allowed with an amended condition to permit the following working hours: • Monday to Friday: 0900 hrs to 1430 hrs and 1730 hrs to 2100 hrs • Saturday: 0900 hrs to 1600 hrs • Sundays and bank holidays: closed

    The alternative schedule would include start and finish times consistent with those originally sought in the appeal. The Council has been given an opportunity to comment on the proposed split schedule, but did not respond. When considering the appeal, I have had regard to the extended hours as originally sought, and also to the proposed split schedule, and am satisfied that no prejudice would arise to any party as a result of my having done so.

    Against the above background, the main issue is whether the disputed condition is reasonable or necessary to safeguard the residential character of the area and living conditions for occupiers of nearby properties.

  3. Section 04

    Reasons

    The appeal site contains a semi-detached house, with a single storey extension to the side. The hair salon is in the rear part of the extension. It is fitted with a hairdressing chair and hair-washing sink, as well as a desk for administrative work. An external door to the side provides customer access separate from the rest of the dwelling, via a footpath and gate alongside the boundary.

    In the Framework, paragraph 85 says that planning decisions should help create the conditions in which businesses can invest, expand and adapt. Reflecting that at a localised level, Policy DM33 of the Rochford Development Management Plan 2014 (RDMP) supports uses operating businesses from dwellings, where planning permission is required, subject to a series of criteria. Those most relevant are (i) that the use remains linked to the residential use and residential remains the primary use and (iii) that the use will not have a significant adverse effect on residential amenity.

    The salon is well integrated into the layout of the dwelling, notwithstanding the separate customer entrance, and it is fitted out in a manner suited to use by a single hairdresser, working from home. The intensity of business operations is limited by both the size of the salon and the other conditions imposed by the Council. In terms of its scale and layout, the use is clearly linked to the dwelling. There is little external indication of commercial activity, and the site remains predominantly in residential use.

    While there are several neighbouring properties, the property most at risk of increased noise and disturbance would be the dwelling directly alongside the salon at [address] (no. 26). This adjacent bungalow has an attached garage next to the appeal site, with the principal windows being to the front and rear. Both properties have a driveway at the front, separated by a low fence. There is a conservatory at the rear of no. 26, with side windows facing towards the appeal site. However, this is set further back than the salon, at a lower level, and the boundary is well screened by a close boarded fence and hedging. Consequently, the salon does not have a very direct relationship with the neighbouring conservatory or rear garden. Nor is it close to any of the other neighbouring dwellings.

    The arrival and departure of customers may be perceived by occupiers of no. 26, but that activity would be mainly concentrated on the front driveway and in the area between the flank walls, without intruding closer to the quieter, more private areas in the back garden or conservatory. There is an air conditioning unit in the salon, so the windows and door do not need to be opened for ventilation, mitigating the risk of odour and noise being transmitted outside the envelope of the building. There is space for customer parking on the driveway and the level of vehicle movements in the wider street would be barely any more intrusive than arrivals and departures at the many surrounding dwellings.

    Taking account of these mitigating factors, use of the salon appears unlikely to disturb neighbouring occupiers to any significant degree. However, arrivals and departures may be audible, external lights may be triggered and there could be some limited level of odour and/or noise if the windows were kept open. While the level of disturbance is likely to remain at a low level, extending the permitted hours of operation to a full twelve hours on weekdays and up to eight hours on Saturdays, as originally proposed, could become cumulatively intrusive within no. 26, which would undermine living conditions for the occupiers.

    In practice, the appellant does not propose operating for such a continuous extended period, although she seeks more flexibility than is permitted by the current condition. Introduction of a split shift as proposed, including a significant break on weekday afternoons, would be compatible with that aim, as well as slightly reducing the overall number of hours currently permitted.

    The condition already allows for evening working on weekdays. The additional hour proposed would provide increased flexibility to cater for customers seeking hair appointments after work, without being unreasonably late at night. Given the relatively indirect relationship with the adjacent conservatory and garden, and the level of activity anticipated, enjoyment of the neighbouring property into the evening would not be harmfully compromised.

    Weekend working would be increased to a greater extent and may be perceived as more intrusive, since neighbouring occupiers are likely to be at home, potentially relaxing in the garden and seeking respite from the working week. Equally, the general level of background noise at the rear is likely to be higher at times when the surrounding gardens are in use. Taking account of the limited likely level of disturbance, the proposed Saturday working hours would not be unreasonably intrusive and there would still be significant periods of respite, since there would be no working on Sundays, public holidays or Saturday evenings.

    There are other small businesses in the immediate vicinity, which cater for a larger number of customers at any one time and include elements of weekend and evening working. In each case, the hours of work are fragmented, so the permitted commercial activity is not of continuous duration. The area retains a quiet, clearly residential character, albeit with some evidence of small businesses operating from home. The proposed split schedule would be consistent with that character and would strike a reasonable balance between supporting a small business, while avoiding excessively long periods of continuous commercial activity.

    For the reasons given above, I conclude that a condition restricting the operating hours of the salon is necessary in principle. However, the disputed condition in its current form is neither reasonable nor necessary to safeguard the residential character of the area and living conditions for occupiers of nearby properties.

    An alternative condition based on the split schedule proposed by the appellant would not conflict with relevant requirements in Policy DM33 of the RDMP, as summarised above.

    However, extending the hours of operation without introducing the proposed split schedule would conflict with the requirement in Policy DM33 that the business use will not have a significant adverse effect on residential amenity.

  4. Section 05

    Conditions

    Having concluded that a condition remains necessary to limit the hours when the hairdressing salon is operational, I have replaced the condition subject to the appeal with one which specifies alternative hours, consistent with the split schedule proposed by the appellant.

  5. Section 06

    Conclusion

    For the reasons given above, I allow the appeal and vary the original permission by deleting the disputed condition and substituting an alternative condition.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 1069No official casework-database value to compare
    Extracted decision date · page 1
    12 August 2025Matches the official casework database
    Extracted site visit dates
    15 July 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3364676
Application reference
25/00092/FUL
Lead case reference
Not recorded
Planning authority
Rochford District Council
Planning authority code
E07000075

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Change of use
Appeal type reason
4. Grant planning permission for the development subject to conditions to which you object
Appeal reason
Appeal Against Conditions
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
26 April 2025
Valid date
26 April 2025
Start date
7 May 2025
Planning authority decision date
10 April 2025
Appeal decision date
12 August 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
74589
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21