Skip to main content
Official casework recordAllowedCurrent release

Appeal 3366445

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

4 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

for a single storey front extension with tiled roof.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for a single storey front extension with tiled roof at [site address] in accordance with the terms of the application, [name]/2024/4256 and the plans submitted with it, subject to the following conditions:

    The development hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans: Location plan, block plan and drawing Numbers 2024/112/01, 2024/112/02, 2024/112/03, 2024/112/04, 2024/112/05 & 2024/112/06.

    The materials to be used in the construction of the external surfaces of the extension hereby permitted shall match those of the existing dwelling.

  2. Section 03

    Main Issue

    The main issue is the effect of the proposal on the character and appearance of the host dwelling, the street scene and the local area.

  3. Section 04

    Reasons

    The appeal site is located within a modern housing estate that is characterised by two storey detached, semi-detached and short terraces of two storey brick and rendered dwellings. The buildings have varied building and ridge lines and are informally arranged around curved roads.

    [address] many of the properties either back onto or sit at right angles to the highway and include tall rear/side fences, outbuildings and garages. This contributes to the mixed character and sense of enclosure within the street scene. The siting and appearance of the appeal property is consistent with this. The appeal dwelling is located within a small terrace of four irregularly designed dwellings with varied front building lines and roof designs. At the front the appeal dwelling is both recessed between and lower than the adjoining dwellings.

    On one side of the terrace is a double garage whose pitched roof is hipped away from the pavement and beyond this garage are the rear gardens of an irregular shaped terrace that fronts onto a different road. On the other side of the appeal terrace the flank wall and fencing along the rear garden of another terrace fronts onto [address]. Directly opposite the host terrace is an irregular shaped terrace whose flank walls project close to the pavement. Throughout the estate elements of the designs of these terraces are repeated and adapted to the curved alignment of the highway.

    Collectively and amongst other things policies CC1, CC2 & SC7 of the London Borough of Hounslow Local Plan 2015-2030 (LP), require proposals to respond sensitively the local architectural vernacular and to conserve and enhance the character of the area. Residential extensions should complement the original building, harmonise with adjoining dwellings and maintain the character of the street scene.

    Part 5 of the [name], Sustainability and [name] (SPD) sets out residential extension guidelines. Paragraph AS1 acknowledges that every property is slightly different and the SPD is part of the consideration of a proposal. Paragraph 9.1 advises that front extensions that are larger than a porch will normally be refused due to their ability to appear bulky and significantly change the appearance of the house and street.

    The National Planning Policy Framework 2024 sets out a presumption in favour of development and a positive approach to dealing with proposals. [name] 131 and 135 of the Framework state that good design is a key aspect of sustainable development. Proposals should be visually attractive as a result of good architecture, be sympathetic to local character and history and add to the overall quality of the area.

    The proposed extension would fill most of the recess between the adjoining dwellings which both have front porch projections. It would respect the strong horizonal lines of the host dwelling and would remain recessed between the adjoining dwellings above ground floor level. The front elevation would continue to have brick walls at ground floor level and render at first floor level above the proposed tiled roof. Also, notwithstanding the introduction of small top opening panes, the proposed windows would be proportionate in size and form. The appeal dwelling would have a front garden that would be consistent in size to the adjacent gardens and would not result in the loss of any off-street parking spaces.

    As a result of these factors the proposed extension would respect and complement the host dwelling. It would also respect the host terrace, with the appeal dwelling remaining visually modest and subservient and would be readily assimilated into the varied street scene and the local area. The proposal would also enhance the living conditions of the occupiers of the host dwelling, without compromising the living conditions of the occupiers of the adjoining and nearby dwellings. In reaching this conclusion, I have assessed the proposal against the advice and guidance set out in the SPD and find that the proposal complies with the [name] CC1, CC2 & SC7.

    Finally, the council has suggested the imposition of conditions related to the use of matching external materials and adherence to the submitted drawings. These conditions are necessary to ensure the proposed extension blends in the host dwelling and terrace and in the interests of certainty.

    I conclude that the proposal would respect the character and appearance of the host dwelling, the street scene and the local area. Accordingly, it would comply with [name] CC1, CC2 & SC7 and the objectives of the SPD.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 1220No official casework-database value to compare
    Extracted decision date · page 1
    7 July 2025Matches the official casework database
    Extracted site visit dates
    27 June 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3366445
Application reference
P/2024/4256
Lead case reference
Not recorded
Planning authority
London Borough of Hounslow
Planning authority code
E09000018

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
25 May 2025
Valid date
25 May 2025
Start date
29 May 2025
Planning authority decision date
4 March 2025
Appeal decision date
7 July 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
72516
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21