Skip to main content
Official casework recordDismissedCurrent release

Appeal 3366640

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

4 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

for the construction of two story side extension, part single, part two storey rear extension, rear/side roof extension; alterations to front elevation including bay windows; installation of three front rooflights.

  1. Section 02

    Decision

    The appeal is dismissed

  2. Section 03

    Main issue

    The main issue is the effect of the proposal on the character and appearance of the area.

  3. Section 04

    Reasons

    [address] is characterised by small terraces of modest sized two storey houses whose front elevations and roof slopes are simple and uncluttered above ground floor level. At ground floor level they have front projecting bay windows under mono-pitched roofs that continue over the front entrances. The terraces are set back from the pavement behind small front gardens. The simplicity and uniformity in the design and appearance of the terraces and their modest front gardens make a significant contribution to the character and appearance of [address].

    At the top of [address], adjacent to the junction of [address] and [address] there is an end of terrace dwelling with a single two storey projecting bay under a gable roof. Due to its position at the end of a row of terraces and at right angles to [address] it does not disrupt the uncluttered and uniform appearance of the terraces.

    To the rear of the terraces there are a numerous extensions, although few two storey extensions. Of the 2No. two storey extensions I saw during my site, one had a flat roof and the other had a pitched roof that was set well below the ridge line. Whilst the large flat roofed dormer extensions project close to the ridge line and disrupt the uncluttered roofscape, they do not project beyond the original rear building lines if the terraces. As a consequence, the uniformity of the terraces above ground floor level is evident. These upper floor extensions are clearly visible from [address].

    Planning permission has already been granted for various elements of the proposal. The main external differences between the approved and proposed schemes are the inclusion of two storey bays under projecting gables on the front elevation and an increase in the height of the roof of the approved two storey rear extension.

    Together and amongst other things policies 7B and 7.4 of the Ealing Development Management Development Plan Document 2013 (DPD), states that new development should complement their street sequence, building pattern, scale, materials, detailing and context. It should achieve a high standard of amenity for users and neighbours by having a positive visual impact and high quality architecture.

    The National Planning Policy Framework 2024 sets out a presumption in favour of development and a positive approach to dealing with proposals. [name] 131 and 135 of the Framework state that good design is a key aspect of sustainable development. Proposals should be visually attractive as a result of good architecture, be sympathetic to local character and history, add to the overall quality of the area and optimise the development potential of the site.

    The proposed front bays and associated gable roofs would completely change the character and appearance of the host dwelling. The dwelling would appear more assertive, distinct from and out of keeping with the host and adjacent terraces. It would interrupt and undermine the simple, uniform and uncluttered lines of the host terrace, the terraces as a whole and the street scene.

    The proposed extension would be comparable to the approved rear extension. However, the roof of the approved extension is set down from the ridge line, at a similar level to the rear projection to the dwelling at [address]. This respects the modest scale of the host dwelling and facilitates the continuity of roof form along the terraces when viewed from [address].

    Conversely with the appeal proposal the roof of the rear extension would project almost up to the main ridge line. Due to the width of the extension the gable roof would dominate the rear roof slope of the dwelling. As a result of its combined height, width and depth the proposed roof would dominate and be totally out of keeping with the host dwelling and the roofscape of the terraces.

    Both individually and cumulatively, the harm that would be caused by the front bay windows and associated gables and the roof of the proposed rear two storey extension would clearly outweigh the benefits for the appellant and their family. Having regard to the nature of the harm that would be caused it is not something that could be adequately addressed through the imposition of conditions.

    Finally, the Council has referred to Policy D4 of the London Plan 2021, which deals with design analysis and development certainty rather than the merits of an individual proposal. As such its relevance to the consideration of the merits of the appeal proposal is limited.

    I conclude that the proposal would unacceptably harm the character and appearance of the area. Accordingly, it would conflict with [name] 7B and 7.4.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 1220No official casework-database value to compare
    Extracted decision date · page 1
    7 July 2025Matches the official casework database
    Extracted site visit dates
    27 June 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3366640
Application reference
251157HH
Lead case reference
Not recorded
Planning authority
London Borough of Ealing
Planning authority code
E09000009

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
28 May 2025
Valid date
28 May 2025
Start date
29 May 2025
Planning authority decision date
19 May 2025
Appeal decision date
7 July 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
72519
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21