Skip to main content
Official casework recordAllowedCurrent release

Appeal 3366691

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

5 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

replacement of first floor box dormer roof with the part addition of a gable roof projection.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for replacement of first floor box dormer roof with the part addition of a gable roof projection at [site address] [postcode] in accordance with the terms of the application, Ref 25/00300/FULL, subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with [name] 1 existing and proposed plan, section and elevation except in respect of the proposed side elevation showing the incorrect ridge height of the dormer, which should instead accord with the proposed roof plan detail.

  2. Section 03

    Main Issue

    The effect of the proposal on the character and appearance of the host dwelling and surrounding street scene.

  3. Section 04

    Reasons

    The proposal is to the front of a semi-detached, chalet bungalow situated within a built-up part of Billericay and facing onto [address]. This street contains a varied mix of detached and semi-detached houses, chalet style houses, and bungalows, many of which have been extended or remodelled with different architectural styles.

    Whilst removing the visual symmetry of the existing semi-detached pair, the replacement dormer window proposed is not so large as to appear overly dominant. Remaining subservient in scale to the host property, and of a comparable design to that immediately next door at No. 223A, the dormer would not look unduly incongruous. The flat roofed element would extend towards the semi-detached neighbour, retaining some coherence to that side of the front elevation. There would be no visual harm in the flat roof extending slightly further along the roof towards No. 225A, or with the off-centre window in the taller, pitched roof part, as the overall fenestration to the extended dwelling would appear satisfactorily balanced and arranged. No. 225 would no longer read as one of a matching pair of semi-detached chalets, but as a distinct design which would provide an acceptable transition between the dwellings to either side.

    Accordingly, this proposal causes no material harm to the character of the surrounding area and complies with Policy BAS BE12 of the Adopted Local Plan. Additionally, the proposal accords with paragraph 135 of the National Planning Policy Framework in respect to its aims to ensure developments are visually attractive as a result of good architecture and sympathetic to local character, including the surrounding built environment.

  4. Section 05

    Conclusion

    In addition to one applying the standard three-year time limit for commencement, a second condition is necessary in the interests of certainty establishing the approved drawings. This is caveated not to apply to the proposed side extension shown, which erroneously indicates the ridge height of the dormer roof matching that of the main dwelling. The remainder of the drawings are as intended and ensure the new roof structure is subserviently designed, by returning at a lower level to the main roof ridge. A new side window onto a staircase, smaller than the one it replaces, would face a blank garage wall at next door No. 223A. A further condition requiring this be obscure glazed is not deemed necessary, as no harmful degree of overlooking would arise from this proposal. Subject to these two conditions, I conclude the appeal succeeds.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 997No official casework-database value to compare
    Extracted decision date · page 1
    19 August 2025Matches the official casework database
    Extracted site visit dates
    8 August 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3366691
Application reference
25/00300/FULL
Lead case reference
Not recorded
Planning authority
Basildon District Council
Planning authority code
E07000066

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
29 May 2025
Valid date
29 May 2025
Start date
2 June 2025
Planning authority decision date
9 May 2025
Appeal decision date
19 August 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
74959
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21