Appeal 3367442
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a retrospective application for the installation of timber board fencing to rear garden.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
[name]
The main issues are the effect of the proposed development on a) the character and appearance of the area; and b) the living conditions of the occupiers of Numbers [address] (No. 48) and No. 52 with specific regard to outlook.
Section 05
Procedural Matters
The appellant has indicated a willingness to submit amended plans to accurately reflect the development as constructed. While this may or may not have been the subject of discussions between the main parties during the life of the application, the appeal process is not intended to serve as a means to evolve or revise a scheme. The appeal must be determined based on the proposal originally considered by the Council and made available for public consultation. Accordingly, and for the avoidance of doubt, I have assessed the scheme on the original plans. Namely, the Site Plan & Boundary Treatment Plan 102 and Site Sections 801 and referred to the proposed development accordingly.
Section 06
Character and Appearance
The appeal building is a semi detached dwelling in a residential area. Itself characterised by buildings and associated curtilages of similar size, design and general presentation. Rear gardens, neighbouring the appeal site, are terraced as the land slopes away towards a recreation ground. They are enclosed by a combination of planting and staggered timber fencing.
The fence would be in timber and have a stepped height profile along both sides where it adjoins neighbouring gardens. The height thereof at these points would be only slightly taller than corresponding fences. Additionally, and as the land slopes away from the rear of the dwellings, the perceived height of the fence is reduced when viewed therefrom. As such, the fencing would not be out of scale with its context and the sense of enclosure it provides would not be dissimilar to that created by other rear garden boundary treatments in the surrounding area. Its intended material is typical of that surrounding a private residential garden.
For these reasons, the development would not harm the character and appearance of the area. As such it would comply with Policy DC6 of the Warrington Borough Council Local Plan 2021/22 – 2038/39 (2023) (LP). As well as the guidance contained in the House Extensions Supplementary Planning Document (2021) (SPD) which, amongst other things, require development to be of high quality design, having regard to layout and materials.
Section 07
Living Conditions
The fencing along the boundary with No. 52 would be lower in parts than typical rear garden boundary treatments. Its height would increase in a stepped manner, following the slope of the land away from the rear elevation. Mature landscaping has been established along this boundary that would help soften it in the visual sense when viewed from the garden.
The occupiers of No. 48 have erected several garden structures along the boundary with No. 50. Whilst sections of the fencing would be visible along this boundary, its height would not significantly exceed that of the existing boundary fence, which remains in place behind. Although parts of the fence have not been finished to a high standard, it would not be unduly dominant or overbearing in planning terms because of this. As such, the fencing would not result in an unacceptable loss of outlook for either of the neighbouring occupiers and their gardens would otherwise be of reasonable size and unencumbered in their aspect.
Therefore, the fence would not cause harm to the living conditions of neighbouring residential occupiers, having regard to outlook. Consequently, it would comply with Policy ENV8 of the LP and guidance contained in SPD, which, amongst other things, seek to ensure development is designed so as not to result in a harmful or cumulative impact on the general levels of amenity.
Section 08
Conclusion and Recommendation
Despite the Council’s concerns over the accuracy of the submitted plans, I have been able to make an assessment as to the effects of the scheme in planning terms based on what appears to be the appellant’s intention and the basic parameters of the information shown. Whilst one could impose a condition for the development to be carried out in accordance therewith and the height discrepancy matter be dealt with between the main parties going forwards (since it in itself is a minor issue in the grand scheme) the lack of clarity in the detail of the elevations prevents such. In that they show diagonal coloured lines when it is clearly the appellant’s intention to keep the fence as horizontal planks supported by vertical battens. Thus, a condition identifying the ‘approved plans’ would not be correct or appropriate and unenforceable with the above in mind.
Notwithstanding my findings on the main issues therefore, and for this technical reason, I am unable to recommend allowing the appeal. Put simply, the result of an allow would mean that a planning permission would be granted. That planning permission would have to relate to some form of sufficiently precise documentation which is, in this case, is not present.
Section 09
Inspector’s Decision
I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1895No official casework-database value to compare
- Extracted decision date · page 1
- 1 September 2025Matches the official casework database
- Extracted site visit dates
- 28 July 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3367442
- Application reference
- 2024/01416/FULH
- Lead case reference
- Not recorded
- Planning authority
- Warrington Borough Council
- Planning authority code
- E06000007
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 11 June 2025
- Valid date
- 11 June 2025
- Start date
- 23 June 2025
- Planning authority decision date
- 16 April 2025
- Appeal decision date
- 1 September 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 75577
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21