Appeal 3368023
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
10 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a fast track single storey rear extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Application for Costs
An application for costs has been made by the appellant. This is subject of a separate decision.
Section 05
Preliminary Matters
There is a dispute amongst the main parties regarding whether or not the Council’s decision was issued within the statutory time limit. [name] have not been provided with a copy of it, the appellant refers to a letter from the Council dated 23 May 2025 which is said to have stated that if no decision was made by 15 June 2025, prior approval would not be required.
Article 7(a) of the Town and Country Planning (General Permitted Development) (England) Order 2015 (the GPDO), states that the statutory period for development under Schedule 2, Part 1 is 42 days. The evidence before me indicates that the application was received on the 19 May 2025. This is the validation date referred to in the Council’s officer report. The Council’s decision notice was issued on the 20 June 2025. This is within the 42-day statutory period. I must therefore accept that the decision notice was issued within the statutory period. Consequently, there are no grounds to allow the appeal on the basis that the Council did not issue the decision in the correct time period. A previous indication that prior approval would not be required if no decision was made by a certain date is not a formal decision of the Council.
In their submissions, the Council have identified an error on their decision notice. The wording on the decision notice reads that ‘the proposal does not constitute permitted development by virtue of Schedule 2 Article 3, Part 1, Class A.1 sections (g)(ii), (i), j(i), j(ii), and (ja) of the Town and Country Planning (General Permitted Development) Order 2015. (as amended)’. However, the Council now state that reference to sections j(i)(ii) were erroneously included. I have no reason to form a different view and I have taken this into account in considering the appeal.
Section 06
Background and Main Issue
The appeal site comprises an end-terraced dwellinghouse situated in a residential area. Schedule 2, Part 1, Class A of the GPDO permits the enlargement of a dwellinghouse subject to certain conditions, limitations and restrictions.
Where an application is made for a determination as to whether prior approval is required for development which exceeds the limits in paragraph A.1(f) of Schedule 2, Part 1, Class A of the GPDO, but is allowed by paragraph A.1(g) of the same section, paragraph A.4(3) provides that the local planning authority may refuse the application where it considers that the proposed development does not comply – or that the developer has provided insufficient information to enable the authority to establish whether the proposed development complies with the conditions, limitations or restrictions that are applicable to such permitted development.
The Council’s decision notice and officer report states that the proposed development would not comply with the limits of Schedule 2, Part 1, Class A of the GPDO. The Council argue that because the proposed single storey rear extension would be attached to a non-original extension to the dwellinghouse, it would exceed the limits set out in Schedule 2, Part 1, Class A.1.
Consequently, I consider that the main issue is whether or not the proposed single storey rear extension would be granted planning permission by Article 3, Schedule 2, Part 1 of Class A of the GPDO, having regard to the existing enlargements at the dwellinghouse.
Section 07
Reasons for the Recommendation
[name].1(g) of Schedule 2, Part 1, Class A of the GPDO states that for a dwellinghouse not on article 2(3) land or on a site of special scientific interest, development is not permitted by Class A if the enlarged part of the dwellinghouse would have a single storey and: (i): extend beyond the rear wall of the original dwellinghouse by more than 8 metres in the case of a detached dwellinghouse, or 6 metres in the case of any other dwellinghouse; or, (ii): exceed 4 metres in height.
As is set out in paragraph A.1(i) of Schedule 2, Part 1, Class A of the GPDO, development is also not permitted if the enlarged part of the dwellinghouse would be within 2 metres of the boundary of the curtilage of the dwellinghouse, and the height of the eaves of the enlarged part would exceed 3 metres.
[name].1(ja) of Schedule 2, Part 1, Class A states that development is not permitted if any total enlargement (being the enlarged part together with any existing enlargement of the original dwellinghouse to which it will be joined) exceeds or would exceed the limits set out in sub-paragraphs (e) to (j). This includes paragraphs A.1(g) and A.1 (i) as set out above.
Paragraph (ja) was introduced to the GDPO under a 2017 amendment1. The accompanying [name] outlines that the amendments to Class A remove from permitted development rights, for example, the ability to allow a single storey extension to be joined to an existing two storey extension (or vice versa) creating a total enlargement which would not have been permitted under Class A as a single extension.
The original dwellinghouse has already been extended with a part ground floor rear extension and a first-floor rear extension. The Council’s evidence includes planning history which indicates that the extension was granted approval in 19862. The plans provided for the 1986 application seem to be consistent with my own observations from my site visit, where due to their different design and materials, the extensions did not appear to be original to the dwellinghouse. Therefore, as these are existing enlargements, they must be considered alongside the proposed development, in terms of assessing whether or not the totality of the proposal would comply with the limits set out in the GPDO.
Due to its location to the rear of the dwellinghouse, the proposed single-storey rear extension would be physically joined to the existing extensions. The height of the first-floor element of the existing extension is not annotated on the plans before me. However, while the proposed extension would be single storey with a height of 3 metres, the totality of the enlargements would be significantly taller when accounting for the existing first-floor extension which the proposal would be connected to. On the proposed elevations provided, the first-floor extension appears to be approximately twice the height of the 3-metre single storey rear extension. Therefore, it would inevitably be in excess of the 4-metre height limit and would fail to comply with paragraph A.1(g).
Furthermore, based on the plans before me and from my own observations on the site visit, the existing first floor extension is within 2 metres of the boundary of the curtilage of the dwellinghouse. For similar reasons to those I have already explained, the height of the eaves of the existing first-floor extension exceeds 3 metres. Consequently, the proposal also fails to comply with paragraph A.1 (i).
In summary, given that the proposed single storey rear extension would be physically connected to the existing extension, these enlargements taken together would exceed the height limit of 4 metres and would exceed the eaves height limit of 3 metres. Therefore, the proposal would not be permitted development under Schedule 2, Part 1 of Class A of the GPDO.
Section 08
Other Matters
The appellant refers to appeal decision 3356680. However, I have not been provided with a copy of the formal decision for this appeal, or the plans associated with it. Therefore, there is insufficient evidence before me which explains the particular circumstances of that appeal and whether or not it is similar to the appeal before me. In the absence of such information, that appeal does not alter my findings on the appeal before me. 1 The Town and Country Planning (General Permitted Development) (England) (Amendment) Order 2017 2 Application reference PL/335/86
I have also seen the appellant’s concerns regarding the conduct of the Council. Despite this, my recommendation has to be based on the evidence before me and focussed on the particular circumstances of the appeal, rather than on any concerns about the behaviour of the Council. I also note that the Council have provided a decision notice and officer report which explains the reasons why they have reached their conclusions, which are focussed on the specifics of the proposal and whether or not it would be permitted development.
The absence of objections from neighbouring properties is not a relevant factor in terms of the main issue in this appeal.
Section 09
Conclusion and Recommendation
For the reasons given above, I recommend that the appeal should be dismissed.
Section 10
Inspector’s Decision
I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Costs Decision
- Extracted inspector · page 1
- Inspector attribution ID 145No official casework-database value to compare
- Extracted decision date · page 1
- 11 November 2025Matches the official casework database
- Extracted site visit dates
- 19 August 2025 (page 1)
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 145No official casework-database value to compare
- Extracted decision date · page 1
- 11 November 2025Matches the official casework database
- Extracted site visit dates
- 19 August 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3368023
- Application reference
- 1455/25
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Redbridge
- Planning authority code
- E09000026
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 17 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 20 June 2025
- Valid date
- 20 June 2025
- Start date
- 8 July 2025
- Planning authority decision date
- 20 June 2025
- Appeal decision date
- 11 November 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 79458
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21