Appeal 3368033
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a loft conversion to create a master bedroom, raising of the roof by 710mm, and insertion of dormer window to the rear.
Section 02
Decision
The appeal is dismissed.
Section 03
Preliminary Matters
The description of development was amended by the Council in its decision letter. I have used this description in the banner heading above since it fully describes the alterations.
Section 04
Main Issue
The main issue is the effect of the proposal on the character and appearance of the area.
Section 05
Reasons
The appeal relates to a pair of semi-detached two storey dwellings set within a cul-de-sac within a residential development off [address]. The dwellings in the immediate area are predominantly two storey houses with traditional brick elevations, some with hung tiles at first floor. Roofs are typically tiled, dual pitched and gable ended. There is no particularly consistent ridge height due to the variation in detailed design and style of the buildings. Where there is accommodation set within the roof storey, there are several examples of individual pitched roof dormer windows set within the roof slope. Rear dormers spanning the full width of the dwellings are, however, not a characteristic feature of the area.
The appeal proposal is for a loft conversion for each property, with a single large dormer to the rear roof slope of each house. To achieve sufficient headroom for the extension, it is proposed to raise the ridge of the roof by around 70cm.
The two proposed dormers would effectively add a second-floor rising sheer from the first floor. This would be a very dominant addition to each property, which would have the effect of making the dwellings appear top heavy and unbalanced. The bulk of the rear dormer to each property would be visible in glimpsed views from the street and in some very limited views from the path and field to the rear of the appeal site.
Although there would be limited public views of the proposed extensions, they would nevertheless be at odds with the established character of the area due to the bulk and scale of the extension to the rear roof slope. The dormers would effectively obscure the rear roof slope and would not be visually subordinate. Given the scale, bulk and visual dominance of the dormers, the proposal would conflict with Principles DG49 and DG52 of the [name] Planning Document adopted 2020 (the SPG). These require extensions to be well integrated with the scale, form and massing allowing the original building to remain the dominant element of the property, and in the case of loft conversions, they should not be out of scale or character with the roofscape and proportions of a dwelling. Further, chapter 6 of the SPG specifically in reference to dormer windows states that they should be visually subordinate to the roof slope.
My attention has been drawn to other local examples of full width rear box dormers at roof level. Whilst there are some examples, including three that I viewed on [address] and [address], they are not characteristic of the area.
I note the appellant’s point that the reason the proposal could not be done pursuant to a lawful development certificate is due to the necessity of raising the roof ridge height. As such, there is no alternative ‘fall back’ position provided by the use of permitted development rights, which are subject to a more limited set of considerations than a planning application. Notwithstanding this, the appeal proposal falls to be considered under the policies of the development plan.
In conclusion therefore, the proposal would harm the character and appearance of the dwellings and surrounding area, contrary to Policy DP26 of the Mid Sussex District Plan adopted 2018 and Policy 9 of the Hassocks Neighbourhood Plan made in 2019, as well as the provisions of the SPD. These policies, taken together and amongst other things, aim to achieve high quality design and respect the character and scale of the surrounding buildings and landscape.
Section 06
Other Matters
The Council consider the proposal acceptable in terms of its effect upon the living conditions of neighbouring residents, parking provision and sustainability. I have no substantive evidence before me which would lead me to disagree.
The appellant indicates that the alternative suggestions put forward by the Council would not achieve the desired usable floorspace. Additionally, it is said the suggestion made for separate dormers set within the roof slope would be prohibitively expensive.
Section 07
Planning Balance and Conclusion
I acknowledge the proposal would offer benefits through the provision of an additional bedroom and bathroom, improving the internal layout and quality of accommodation available for current and future occupiers of the properties, and I give moderate weight to this benefit. The absence of harm to the living conditions of neighbouring residents, parking provision and sustainability is a neutral consideration. Whilst my attention has been drawn to the issues associated with the Council’s alternative suggestion, that is not a matter before me for determination.
However, I attach significant weight to the harm I have identified to the character and appearance of the area, which outweighs the identified benefits.
The proposal conflicts with the development plan and the material considerations do not indicate that the appeal should be decided other than in accordance with it. For the reasons given above the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 5181No official casework-database value to compare
- Extracted decision date · page 1
- 7 October 2025Matches the official casework database
- Extracted site visit dates
- 16 September 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3368033
- Application reference
- DM/25/0147
- Lead case reference
- Not recorded
- Planning authority
- Mid Sussex District Council
- Planning authority code
- E07000228
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 21 June 2025
- Valid date
- 21 June 2025
- Start date
- 9 July 2025
- Planning authority decision date
- 6 June 2025
- Appeal decision date
- 7 October 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 77529
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21