Appeal 3368266
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as the addition of one storey to existing dwelling house. Walls to be finished in brick to match existing with a section finished with hanging tiles to match the existing. Roof to have same pitch as existing roof. Windows to be white UPVC close match to existing. New floor to be created (height of floor does not exceed the height of any existing floor of the property). The elevations are proposed to be as shown on the submitted plans and have been designed to reflect the style of the existing property including window sizes and the use of matching materials.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The description of development in the heading above has been taken from the planning application form. In section E of the appeal form it is stated that the description of development has not changed from that stated on the application form. Neither of the main parties has provided written confirmation that a revised description of development has been agreed. Accordingly, I have used the description given on the original application form.
Section 04
Background and Main Issue
Schedule 2, Part 1, Class AA of the Town and County Planning (General Permitted Development) (England) Order 2015 (as amended) (the GPDO), permits development comprising the enlargement of a dwellinghouse consisting of the construction of (a) up to two additional storeys, where the existing dwellinghouse consists of two or more storeys; or (b) one additional storey, where the existing dwellinghouse consists of one storey, immediately above the topmost storey of the dwellinghouse, together with any engineering operations reasonably necessary for the purpose of that construction.
The Council concluded that the proposal would comply with the conditions and limitations set out at paragraph AA.1 of Class AA, such that it would fall within the scope of permitted development rights, subject to consideration of relevant matters of prior approval. On the evidence before me I see no reason to take a different view.
The conditions of paragraph AA.2 (3)(a)(ii) require consideration of the external appearance of the dwellinghouse, including the principal elevation and any side elevation that fronts a highway.
The main issue is whether prior approval should be granted under Article 3(1) and Schedule 2, Part 1, Class AA of the GPDO, having particular regard to the effect of the proposed development on the external appearance of the dwellinghouse.
Section 05
Reasons
The appeal site comprises a two-storey dwelling fronting a pedestrian footway. To the rear of the site is a road providing access to properties from the main part of [address]. Development in the area primarily consists of two-storey terraced properties arranged in an ordered, linear form. The prevailing scale and layout of the built form of the area has a predominantly horizontal emphasis, characterised partly by the unbroken rhythm of the rooflines of properties in the area.
The external appearance of the existing dwelling at the site is defined in part by the two-storey scale of the terrace within which it is located. The uniformity of scale is an intrinsic part of the external appearance of the existing dwellinghouse. The existing appearance of the dwellinghouse makes a positive contribution to the character and uninterrupted scale of the terrace and the surrounding buildings.
[name].2 (3)(a)(ii) of Class AA requires prior approval to be sought for ‘the external appearance of the dwellinghouse, including the design and architectural features of (aa) the principal elevation of the dwellinghouse, and (bb) any side elevation of the dwellinghouse that fronts a highway.’ The use of the word ‘including’ means that the lists that follow are not exhaustive and that other factors could affect the external appearance of the dwellinghouse.
The proposal would extend the existing dwelling upwards through the provision of an additional storey. The elevations of the additional storey would reflect the layout of windows in the existing dwelling and would utilise matching external materials. Nevertheless, the raised height of the dwelling would disrupt the prevailing two-storey architecture of the area. The additional storey at the site, protruding above the neighbouring properties, would appear incongruous and would unbalance the coherent and consistent design and height of the terrace. Consequently, the external appearance would harm the character and appearance of the terraced dwellinghouse.
I conclude that the external appearance of the extended dwellinghouse would be harmful. The proposal would therefore not accord with the requirements of paragraph AA.2 (3)(a) (ii) of Class AA of the GPDO and would be contrary to Paragraph 135 of the National Planning Policy Framework, which requires development to, amongst others, be visually attractive and sympathetic to local character including the surrounding built environment.
Section 06
[name]
The legislation set out above allows for additional storeys to a dwelling that may be a terraced property, where this may be suitable. For the reasons set out above, I have found that in this instance, this is not the case.
Section 07
Conclusion
For the reasons given above the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 20880No official casework-database value to compare
- Extracted decision date · page 1
- 11 September 2025Matches the official casework database
- Extracted site visit dates
- 2 September 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3368266
- Application reference
- 25/00338/HHPAA
- Lead case reference
- Not recorded
- Planning authority
- Chelmsford Borough Council
- Planning authority code
- E07000070
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 43 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 26 June 2025
- Valid date
- 26 June 2025
- Start date
- 3 July 2025
- Planning authority decision date
- 11 April 2025
- Appeal decision date
- 11 September 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 76192
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21