Appeal 3368420
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the demolition of an existing timber summer house and the construction of an oak framed 2-bay garage with upper floor.
Section 02
Decision
The appeal is allowed and planning permission is granted for the demolition of an existing timber summer house and the construction of an oak framed 2-bay garage with upper floor at [site address] , [site address] Hampshire [postcode] in accordance with the terms of the application, Ref 25/00422FULL, and the plans submitted with it subject to the conditions in the attached schedule.
Section 03
Main Issue
The main issue is the effect of the proposed development on the character and appearance of the host dwelling and the surrounding area which includes the Forest South East Conservation Area (CA) and the New Forest National Park (NFNP).
Section 04
Reasons
Homestead is an attractive two storey thatched cottage with a single storey tiled extension. It is not listed, however, the Council consider it to be a non-designated
Section 05
heritage asset.
The surrounding area is characterised by a mix of detached properties of varying ages, architectural styles, and materials. Homes range from single-storey to two-storey buildings, often accompanied by garages and assorted outbuildings. This built form is complemented by a distinctly verdant setting, where mature trees and dense hedgerows create natural boundaries and a sense of enclosure. The greenery provides a striking contrast to the more open and exposed landscape opposite the appeal site.
Within the Forest South East Conservation Area [name], the site is in the [site address] to East End Character Area. Characteristics of this area include the linear pattern of development along the medieval boundary of [address], with development formed between the road and the manorial bank. Notable features include cob cottages with thatched roofs and gable ends oriented towards the road. I find that the significance of the CA is therefore formed by the layout of development, the traditional buildings and architecture, and the relationship with the forest.
[address] is identified as being a non-designated heritage asset, with its significance stemming from its age and use of traditional materials including cob and thatch.
Policy DP37 of the New Forest National Park Local Plan 2016-2036 (NFLP) requires outbuildings to be proportionate and clearly subservient to the dwelling they serve. The footprint of the proposed building would be smaller than the house. The height of the roof is also lower. The building would present as a double garage with a lower covered area to one side. Although there is a first floor, the height of the building is not excessive.
The building would remain subservient to [address], with its setback from the road and the intervening vegetation further reducing its visual impact. Within the local context, where building heights and the scale of outbuildings vary, the proposal would not appear out of character when viewed alongside the street and surrounding properties. Its design is consistent with the prevailing style in the area, featuring a gable fronting the road, a common architectural element. The use of timber boarding and a slate roof is also appropriate and reflects materials found on other nearby buildings.
The National Planning Policy Framework (the Framework) places great weight on conserving and enhancing the landscape and scenic beauty of National Parks, which hold the highest level of protection for these matters. The proposed development would have only a localised effect on the National Park. Given that its design, scale, and siting are considered acceptable, the scheme would not conflict with this objective of the Framework. Furthermore, there is no conflict with the duty to seek to further the purpose of conserving and enhancing the natural beauty of the National Park.
As the appeal site lies within a conservation area, under Section 72(1) of the Planning (Listed Buildings and Conservation Areas) Act 1990, special attention must be paid to preserving or enhancing its character and appearance. The Framework also requires consideration to be given to the impact of a proposal on the significance of a designated heritage asset, and great weight to be given to the asset’s conservation. For the reasons above, the proposal would not harm the character or appearance of the host building and would preserve the significance of the CA. Accordingly, it complies with Policies D2, D18, DP37, SP16, and SP17 of the NFLP, which require high-quality design that respects and enhances the historic environment and landscape, including heritage assets such as conservation areas.
Section 06
Other Matters
I note that a previous application for a garage on this site was refused. While there are some similarities, the building proposed in this appeal differs in several key respects: it has a lower ridge height, a revised footprint, and an alternative design. For the reasons outlined above, I consider the current proposal to be acceptable within the context of the cottage and the surrounding area.
Section 07
Conditions
I have had regard to the conditions suggested by the Council and the advice in the Planning Practice Guidance. Where necessary I have amended the wording of the suggested conditions for clarity, brevity, to avoid duplication and to ensure accordance with the tests set out in paragraph 57 of the Framework. Where pre-commencement conditions are needed the appellant’s agreement has been sought.
In the interests of certainty, conditions are necessary specifying the time limit for commencement and the relevant approved plans.
It is reasonable for the details of materials to be approved in the interests of the character and appearance of the area. A condition is also required to ensure that trees and hedges surrounding the site are protected during the construction phase.
Considering the scale of the proposed development and the absence of existing restrictions on external lighting, it would be unreasonable to impose a condition relating to external lighting. Similarly, requiring machinery and materials to be stored strictly within the red line boundary is not reasonable. The site appears sufficiently large to accommodate construction activities, and any use of land outside the site is likely to be minimal and short term.
A condition restricting the use of the outbuilding is not necessary. The reason given for the condition is to protect the character and appearance of the National Park, the use of the space as a living room, for example, would not result in a material change to its appearance. If the building were to be used for another purpose further permission may be required.
Section 08
Conclusion
For the reasons given above the appeal should be allowed.
Section 09
SCHEDULE OF CONDITIONS
The development hereby permitted shall begin not later than three years from the date of this decision.
The development hereby permitted shall be carried out in accordance with drawing nos: PLA001 and PL002C.
No development shall take place above slab level until samples or exact details of the facing and roofing materials have been submitted to and approved in writing by the New Forest National Park Authority. Development shall only be carried out in accordance with the details approved.
No development, demolition or site clearance shall take place until the arrangements to be taken for the protection of trees and hedges on the site (as identified for protection in the approved plans/to be identified by agreement with the Local Planning Authority beforehand), have been submitted to and approved in writing by the Local Planning Authority. The agreed arrangements shall be carried-out in full prior to any activity taking place and shall remain in-situ for the duration of the development.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4712No official casework-database value to compare
- Extracted decision date · page 1
- 20 November 2025Matches the official casework database
- Extracted site visit dates
- 30 October 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3368420
- Application reference
- 25/00422FULL
- Lead case reference
- Not recorded
- Planning authority
- New Forest
- Planning authority code
- E26000009
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 15 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 30 June 2025
- Valid date
- 30 June 2025
- Start date
- 1 July 2025
- Planning authority decision date
- 25 June 2025
- Appeal decision date
- 20 November 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 80046
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21