Appeal 3368437

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as the ‘construction of single storey extension and ramp at front, single storey extension at rear of house; alterations (Class C3).’

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for construction of single storey extension and ramp at front, single storey extension at rear of house; alterations (Class C3); in accordance with the terms of the application Ref 20250406, dated 4 June 2025, subject to the following conditions:

    The development hereby permitted shall be carried out in accordance with the approved drawings listed below: • ‘[name],’ [name]: 2025/03/53/A, Dated 18/03/2025; • ‘Ramp,’ [name]: 2025/03/53/A, Dated 18/03/2025; • ‘[name] – Front and Side,’ [name]: 2025/03/53/A, Dated 18/03/2025; • ‘[name] – Rear and Side,’ [name]: 2025/03/53/A, Dated 18/03/2025; • ‘Proposed Site Location Plan,’ [name]: 2025/03/53/A, Dated 18/03/2025;

    The development hereby permitted shall be commenced before the expiration of three years from the date of this permission.

    The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.

  2. Section 03

    Preliminary Matters

    I have taken the description of the proposal from the Council’s Decision Notice which more concisely describes the elements requiring consideration. This description is also reflected in the Appellant’s Appeal Form. I shall make my decision on this basis.

    I note reference in the Council Officer’s report with regards to a rear extension that according to the Council has been erected without planning permission. It is not for me under a Section 78 appeal to determine the current correct and legal development of the existing building. I have therefore made my decision on this Appeal Decision: APP/W2465/D/25/3368437 basis of the existing conditions and to the development plan and relevant material considerations. To that end it is open to the Council to pursue enforcement action, or for the appellant to apply for a determination under sections 191/192 of the Town and Country Planning Act if they believe the lawful development is different. My determination of this appeal under s78 does not affect the issuing of a determination under s191/192 regardless of the outcome of this appeal.

  3. Section 04

    [name]

    The main issues are the effect of the proposed development upon: • The character and appearance of the host building including the surrounding locality; and • The living conditions of No. [address], with particular regard to sense of enclosure and outlook.

  4. Section 05

    Character and Appearance

    The appeal site is located along [address], a residential cul-de-sac in each direction that forms off [address]. [address] forms one of a number of streets in the local area that contains formally laid out speculative housing which appears to date from the early to mid twenty-first century. Unlike the semi-detached dwellings in surrounding streets, [address] is lined on both sides and to the ends with groups of terraced housing ranging in groups of 4-6 dwellings. The dwellings along [address] which includes the appeal site are laid out with similar front setbacks with front gardens, (many of which are now paved) and small rear gardens. Unfortunately there is a lack of vegetation in the area, with some vegetation being visible with tops of trees in rear gardens being visible between gaps between terraces.

    The Appeal site is an end terraced property in a group of six dwellings (No.s 15-25 odd) which is setback behind the general line of terraced dwellings, such as the adjoining terrace of dwellings (Nos 27-37 odd). The terrace is two storeys, brick construction with London brick to first floor and red brick to ground floor, the appeal site and opposite terrace end having a hipped concrete tiled roof. To the ground floor there is a single storey enclosed porch that is shared with No.23. To the rear of the site there is a small rear garden that is paved, a small lean-to enclosed extension and a partly open pergola type structure.

    In assessing new development the Leicester City Council Core Strategy (CS) Policy CS03 is a design led policy which has a number of design criteria to adhere to such as being high quality, well designed, respond positively to the character of the area in terms of materials, height, scale, and massing, amongst others.

    Beginning with the front extension this would elongate the forward projection of the front porch that would enable a greater turning circle for a wheelchair, along with a ramp with handrails. Given that there is symmetry across the terrace and with No.s 23 and 25 sharing the front porch design, the further projection forward whilst, proportionate to the existing dwelling would give an asymmetrical appearance which would be detrimental to the overall character and appearance of the terrace and host building. The installation of the ramp to the front of the extension would Appeal Decision: APP/W2465/D/25/3368437 not be like anything else in the locality, and would project further forward from the dwelling, to be in line with the bay window of the adjacent neighbour at No.27. The harm caused to the character and appearance of the building is somewhat mitigated by the use of materials and the proportions of the extension, however when compared to the remainder of the terrace, the proposed front extension would cause harm to the character and appearance of the existing dwelling, including the greater locality.

    Turning to the rear extension, the existing lean-to enclosed and open structure as mentioned previously would be removed and an enclosed extension created in its place to the rear with a depth of 6 metres and at a lower height than existing. The extension adjoins the single storey extension of No.23, and is setback from the boundary of No. 27. The rear extension would have a flat roof which would reduce height and be generally proportionate to the host building and is a simple and functional appearance that does not dominate the existing building and allows the original and the extension to be appreciated together. As such the proposed rear extension would be generally appropriate.

    Taking the above into account, whilst the rear extension would be compliant with CS Policy CS03, the front extension including ramp would cause harm to the character and appearance of the dwelling and the locality. Consequently, this element of the proposed scheme would be made contrary to CS Policy CS03 as previously described.

  5. Section 06

    Living Conditions

    The neighbouring dwelling at No.[address] is also an end terraced dwelling but with the rear façade set forward from the rear façade of the appeal site. The neighbouring dwelling has a single storey rear extension, but a relatively long garden. The proposed rear extension would have a flat roof that would be at a lower height than current lean-to roof of the rear extension which assists in reducing the massing and form of the extension when experienced from the rear of No.27 Rotherby which has an adequate level of access to sky from the rear garden. An extension such as this is typical and expected for many rear gardens and would not be out of place in this particular context. As the garden is relatively long and adjoining development low in height, there would be sufficient outlook towards the rear from use of the neighbouring garden and from within the conservatory. [name] agree with the [name] there would be some loss of outlook, it would not be to a level where it could be considered ‘significant’ and I therefore disagree with the Planning Officer’s report that there would be significant harm caused by loss of outlook of this neighbouring property’s rear garden space. As such, the increase in built form to the rear would not be excessive given that adequate exposure of the rear garden to a good sense of outlook is still achievable.

    Taking the above into account, I disagree that the proposed rear extension would result in excessive harm to living conditions as a result of sense of enclosure or outlook. Consequently, the proposed scheme is made in accordance with the City of Leicester Local Plan Saved Policy PS10 which seeks to ensure that development does not result in an unacceptable loss of amenity. Appeal Decision: APP/W2465/D/25/3368437

  6. Section 07

    [name]

    I note that there is discussion within the appeal documents along with the floor plans and a letter from the NHS1 for the reasoning of the front and rear extension that enables for the better care needs of a child resident at the property. The extension would facilitate a tailored bedroom, bathroom and circulation space to cater for the child. The extension does not appear excessive in this respect and is planned around the specific care needs of the child.

    I am willing to consider the needs of the Appellant as a material consideration, particularly as I recognise that this appeal needs to consider the appellant’s rights under Articles 8 and 14 of the [name] on Human Rights or Human Rights, as incorporated by the Human Rights Act 1998; and additionally [name] on the Rights of a Child Article 3 (1). Section 149(1) of the Equality Act 2010 (EA2010) imposes the ‘public sector equality duty’ (PSED) on ‘a public authority...in the exercise of its functions’. The PSED means that in the exercise of their functions a planning authority needs to have due regard to three aims, namely to eliminate discrimination, harassment, victimisation; advance equality of opportunity between persons with protected characteristics; and to foster good relations between persons who do/don’t share protected characteristics.

    Having considered the benefits that the proposed scheme would deliver to the Appellant and the best interests of the child, I attach significant weight to the Appellant’s Human Rights, the rights of a child and the PSED as a material consideration to the determination of this scheme. Therefore, and in conclusion of this matter; whilst the proposed front extension would conflict with the development plan, this is outweighed by other material considerations as explained above.

  7. Section 08

    Conclusion and Conditions

    For these reasons, and having considered all matters raised in evidence and from what I saw during my site visit, I conclude that the appeal should be allowed and planning permission granted, subject to the conditions as detailed previously.

    The Council in their Appeal Form response detailed that should the appeal be allowed, that conditions regarding time limit, approved plans and materials which match existing be placed on any decision notice. I have considered the conditions as specified in the beginning of this letter in accordance with the Planning Practice Guidance (PPG). Conditions 1 and 2 are standard conditions which set the standard time limit and approved plans which are necessary for the avoidance of doubt and in the interests of proper planning. Condition 3 seeks that the scheme is constructed in matching materials which is necessary as this condition enables the development to fit in with the character and appearance of the existing dwelling and the locality.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted decision date · page 1
    8 September 2025Matches the official casework database
    Extracted site visit dates
    18 August 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3368437
Application reference
20250406
Lead case reference
Not recorded
Planning authority
Leicester City Council
Planning authority code
E06000016

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
25 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
30 June 2025
Valid date
1 July 2025
Start date
2 July 2025
Planning authority decision date
4 June 2025
Appeal decision date
8 September 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
75958
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21