Appeal 3368453
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a ground and first-floor rear extension.
Section 02
Decision
The appeal is allowed and planning permission is granted for a ground and first-floor rear extension at [site address] , Hackney, London [postcode] , in accordance with the terms of the application, Ref 2025/0656, subject to the following conditions:
The development hereby permitted shall begin not later than three years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: Location and Block Plan – E00 [name] – P01 [name] – P02 [name] – P03 Proposed Drawings Section – P04
The materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.
Section 03
Applications for Costs
Applications for costs have been made by the appellant against the Council, and by the Council against the appellant. These applications are the subject of separate decisions.
Section 04
Preliminary Matters
Following a review of all available evidence, the Council was asked to clarify the plans used to determine the application. It was confirmed that the plans initially submitted related to a previously approved scheme at the property and were therefore incorrect. The correct plans have since been provided, and both parties agree that they represent the scheme subject to the appeal. This decision has been made based on those plans.
The Council’s officer report and decision notice both refer to the [address] Area Action Plan (AAP). However, copies of that document have not been submitted as part of the appeal, nor has confirmation been provided regarding its current stage of preparation. Accordingly, no weight has been afforded to the emerging AAP in this decision. The appeal has therefore been determined against the adopted policies and guidance that have been provided, comprising the London Plan, March 2021 (the LP), the Hackney Local Plan 2033, Strategic Planning, [name] 2020 (the HLP), and the Supplementary Planning Document, [name] and Alterations, [name] 2009 (the SPD).
Section 05
Main Issue
The main issue is whether the proposed development would have an acceptable effect on the character and appearance of the area.
Section 06
Reasons
The appeal property is an end-terrace dwelling within a uniform row of mid-20th century two-storey houses. These properties are characterised by their simple, rectilinear form and shallow-pitched roofs, which from street level appear almost flat. This consistent architectural rhythm contributes to the overall character of the terrace.
To the rear, the properties face onto an area that serves as a publicly accessible pedestrian thoroughfare between [address] and [address]. This space also functions as a privately accessible parking and servicing area for properties on both streets, with a lockable gate restricting vehicular access but allowing unrestricted pedestrian movement. Consequently, the rear elevations of the terrace are readily visible from public vantage points.
The Council’s concerns regarding the dominance and visual intrusion of the proposal primarily relate to the absence of other two-storey rear extensions within the terrace and the uniform first-floor building line this currently provides. However, the adopted SPD does not prohibit two-storey rear extensions outright in such circumstances. Conversely, it acknowledges that such extensions may be acceptable for end-of-terrace properties where they are appropriately scaled and designed, provided they do not appear over-dominant and comply with amenity safeguards such as the 45-degree rule.
In this case, the proposal would project 3 metres at both ground and first floor levels, aligning with the SPD’s guidance on depth for terraced houses. The first-floor element would be inset from the boundary with the adjoining property and its nearest windows, reducing its visual bulk compared to a full-width projection and ensuring compliance with the 45-degree rule. Although the extension would have a flat roof, the terrace’s shallow-pitched roofs appear almost flat from street level, meaning the roof form would not jar with the prevailing character. Whilst the terrace currently lacks two-storey rear extensions, the SPD anticipates such proposals to be acceptable in appropriate circumstances, and I am satisfied that the proposed scheme falls within that scope.
Paragraph 3.13 of the SPD states that rear extensions should be at least one storey lower than the eaves height of the host building. [name] note the Council’s reference to this guidance, SPD paragraph 3.31 and the accompanying diagrams indicate that two-storey rear extensions to two-storey properties may be acceptable in certain circumstances. This creates some ambiguity regarding how the SPD defines the relationship between the eaves of the host property and the height of any extension. However, considering the SPD as a whole, and given the design measures incorporated in this proposal, I am not persuaded of any specific conflict with its provisions.
For these reasons, I conclude that the proposed development would represent an appropriately scaled and subordinate addition to the host property. Although it would introduce a new extension typology within the terrace, it would not appear over-dominant or visually intrusive and would respect the character and appearance of the area. It would therefore accord with Policy D3 of the LP, Policy LP1 of the HLP, and the provisions of the SPD, which collectively seek to ensure that extensions remain subordinate and respect the original form and appearance of the host property and its surroundings.
Section 07
Conclusion
For the reasons given, I conclude that the appeal should be allowed subject to the conditions listed in my formal decision.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4240No official casework-database value to compare
- Extracted decision date · page 1
- 17 December 2025Matches the official casework database
- Extracted site visit dates
- 13 November 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3368453
- Application reference
- 2025/0656
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Hackney
- Planning authority code
- E09000012
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 33 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 30 June 2025
- Valid date
- 11 July 2025
- Start date
- 11 July 2025
- Planning authority decision date
- 25 June 2025
- Appeal decision date
- 17 December 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 81714
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21