Skip to main content
Official casework recordDismissedCurrent release

Appeal 3368504

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

side extension at first floor.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    [name]

    The main issues in this appeal are: • whether the proposal would be inappropriate development in the Green Belt having regard to any relevant development plan policies and the National Planning Policy Framework (the Framework); • the effect of the proposal on the openness of the Green Belt; • the effect of the proposal on protected species, with specific regard to bats; and • on the basis that the proposal would be inappropriate development, whether the harm by reason of inappropriateness, and any other harm, would be clearly outweighed by other considerations so as to amount to very special circumstances required to justify the development.

  3. Section 04

    Whether inappropriate development

    Policy CS5 of the Shropshire Local Development Framework: [name] (2011) ([name]) permits appropriate development and infilling at certain locations within the designated Green Belt, as well as limited local needs affordable housing on exception sites. In addition to this, Policy MD6 of the Shropshire Council Site Allocations and Management of Development (SAMDev) Plan (SAMDev Plan) permits development on previously developed sites, which would not have a greater impact on the openness of the Green Belt than the existing development, providing it would meet certain criteria.

    The proposed extension would not meet any of these exceptions and would therefore be at odds with these policies.

    Notwithstanding this, while the exceptions set out in Policies CS5 of the [name] and MD6 of the SAMDev Plan broadly reflect some of the exceptions set out at paragraph 154 of the Framework, the overall policy approach and totality of the exceptions is somewhat different. Also, unlike the Framework, neither policy permits inappropriate development in the Green Belt in very special circumstances. These development plan policies are therefore not consistent with the provisions of the Framework. As the Framework is more up to date than the [name] and SAMDev Plan, I give greater weight to the policies in the Framework in this regard and have assessed the appeal on this basis.

    Paragraph 154 of the Framework states development in the Green Belt to be inappropriate unless one of the listed exceptions applies. The exceptions include the extension and alteration of a building, provided that it does not result in disproportionate additions over and above the size of the original building.

    The appeal property has been previously extended. The extensions include a two-storey rear extension, single storey rear extension and single storey side extension. All these extensions are an appreciable size and, cumulatively, already significantly larger than the original building. Given this, the proposal would result in disproportionate additions over and above the size of the original building. As such, it would be an inappropriate form of development in the Green Belt.

  4. Section 05

    Openness

    The proposed extension would be a moderate size and would unavoidably take up space, which is currently open, albeit this would be air space. Therefore, despite being located on top of the existing first-floor extension, the proposal would result in moderate harm to the spatial openness of the Green Belt.

    The proposed extension would not extend beyond the height, width or depth of the host dwelling. Nonetheless, it would be an obvious addition in the street-scene, with direct views from [address] of both its front and side elevations, meaning its overall massing would be readily apparent. This would result in some moderate and localised harm to the visual openness of the Green Belt.

    Accordingly, the proposed extension would not preserve the openness of the Green Belt contrary to the fundamental aim of the Framework.

  5. Section 06

    Protected species

    The proposal would involve the modification of existing roof structures. Given this, a survey is required to demonstrate the presence or otherwise of bats. The appellant does not dispute the need for a survey and has indicated that one would be undertaken before any work was carried out.

    Nevertheless, Circular 06/20051 advises that it is essential that the presence or otherwise of protected species, and the extent that they may be affected by the proposed development, is established before planning permission is granted so that the effect on biodiversity is identified as a material consideration. It goes on to advise that the need to ensure that ecological surveys are carried out should only be left to coverage under planning conditions in exceptional circumstances. I am not aware of any such circumstances in this case. 1 Government Circular: Biodiversity and Geological Conservation – [name] and their Impact within the Planning System, dated 16 August 2005

    Given the above, I find that insufficient information has been provided to demonstrate that the proposal would not have an unacceptable adverse effect on protected species. The proposal would therefore conflict with Policy CS17 of the [name] and Policy MD12 of the SAMDev Plan, which seek to conserve and enhance Shropshire’s natural assets, including biodiversity.

  6. Section 07

    [name]

    The appellant’s personal circumstances require him to reside in a house with three bedrooms on the same floor. The appeal property in its current layout does not provide this and the proposal seeks to address this.

    I have before me a set of plans that supported a previous application2 at the appeal site, which show the appeal property, at that time, to have three first-floor bedrooms. While the appeal property has been subsequently altered to provide only two first-floor bedrooms, there is nothing before me to demonstrate that it would not be possible to restore the previous layout, or something similar, that would provide the three first-floor bedrooms required by the appellant. Thus, there are ways to meet the appellant’s personal circumstances, which would result in less harm to the Green Belt.

    Furthermore, there is no mechanism before me to restrict the occupancy of the appeal property. As an open market dwelling any planning permission would run with the appeal property and therefore it could be occupied by others, now and in the future, who do not have the same needs as the appellant. The weight I can afford to these personal circumstances in my decision is therefore limited.

  7. Section 08

    Green Belt Balance

    Paragraph 153 of the Framework indicates that inappropriate development is, by definition, harmful to the Green Belt and should not be approved except in very special circumstances. Very special circumstances will not exist unless the harm to the Green Belt, and any other harm, is clearly outweighed by other considerations.

    The proposal would be an inappropriate form of development within the Green Belt and would also harm its openness. In line with Paragraph 153 of the Framework, I afford this harm substantial weight. I have also found, in the absence of evidence to the contrary, that the proposal would result in significant harm to bats.

    Accordingly, the limited considerations would not clearly outweigh the harm I have identified. Consequently, the very special circumstances necessary to justify the proposal have not been demonstrated.

  8. Section 09

    Conclusion

    For the reasons above, the proposal would conflict with the development plan, read as a whole. It has not been demonstrated that there are any material considerations of sufficient weight to indicate that a decision should be taken otherwise than in accordance with it. The appeal is therefore dismissed. [planning inspector] INSPECTOR 2 Application Reference: 20/00107/FUL

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 2938No official casework-database value to compare
    Extracted decision date · page 1
    21 October 2025Matches the official casework database
    Extracted site visit dates
    9 October 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3368504
Application reference
25/01371/FUL
Lead case reference
Not recorded
Planning authority
Shropshire County Council
Planning authority code
E06000051

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
26 m²
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
1 July 2025
Valid date
29 July 2025
Start date
29 July 2025
Planning authority decision date
12 June 2025
Appeal decision date
21 October 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
78317
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21