Appeal 3368695
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
7 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a dropped kerb for vehicular access across the highway.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue is the effect of the proposed development on highway safety.
Section 04
Reasons
The appeal property is a detached dwelling with an existing access from [address], which is a 40-mph classified A road.
The proposal is to widen an existing dropped kerb, seeking to provide a safer, more practical and inclusive access from [address] to the host property. The highway authority raised concerns during the application that the proposal would allow for cars mounting the kerb at speed, which would potentially endanger pedestrian safety, and undermine the Council’s movement hierarchy that prioritises pedestrians over vehicles. The proposal would also potentially conflict with plans to install a new bus stop being brought forward as part of the Council’s strategic A37 / A4018 corridor improvement scheme that [address] forms part of. I am aware that the appellant submitted two sets of revisions seeking to address the issues identified, albeit neither were concluded by the Council to be acceptable.
I recognise the appellant’s lived experiences with the existing arrangement that, whilst meeting technical requirements in terms of dropped kerb width, presents a somewhat awkward movement into and out of the property when considering traffic volume, speeds, and driveway alignment.
I also observed on my site inspection that the section of the road and pavement outside the appeal property is straight, with clear visibility of pedestrians available, at present, in both directions. As highlighted by the appellant, there are also other properties along [address] with dropped kerbs wider than that existing at the appeal site that seem to operate without any issues. In view of these matters, I am not satisfied that the Council’s concerns regarding the impact of the proposal on pedestrian safety from increased turning speeds have been adequately substantiated with any objective evidence as to the likelihood of this happening, and the level of harm that would arise.
I am, however, concerned about the proposal’s potential for conflict with the planned new bus stop that I understand will be located immediately outside of the appeal site. I observed on my site inspection that the A37 / A4018 highway improvement works are underway along [address], which indicates that the bus stop will likely be installed soon.
I acknowledge that the appellant considers that the proposed bus stop, even without the proposed alterations, will obstruct and restrict existing visibility at the site. This could create a conflict with the existing access in terms of possible collisions with pedestrians concealed by the shelter, reduced visibility, and buses blocking the driveway. I agree that these are valid concerns, albeit also note that the Council consider the strategic highway works are acceptable and will not lead to adverse impacts on the existing situation, as they are expected to improve speed limit compliance and general safety along the corridor.
I also acknowledge the appellant’s points that they have a legally established point of access, and were not alerted to the strategic highway works earlier, or then able to obtain the full details of the location of the bus stop, making it difficult for impact to be assessed and addressed. It would clearly have been helpful to the appellant if they were able to have had sight of the full plans for the bus stop when considering their proposals. Nevertheless, the effects of the bus stop on both current and proposed revised dropped kerb widths is a fundamental issue that must be addressed. This is essential for properly assessing the proposal’s impact on highway safety, and whether it would materially impact on the opportunities for walking, cycling, and public transport.
Without this, I am not persuaded that any conflict that might occur between the bus stop and the existing kerb access provides any justification for the proposed alterations to the dropped kerb. The reason being is that the evidence before me does not conclusively demonstrate what the impact of the proposal would be on the bus stop, and whether it would result in any additional adverse impacts over and above the existing kerb width.
I note in this regard that the revised proposal would not meet the minimum technical requirements for transition kerbs on one side due to the likely location of the bus stop. This is an indicator that the proposal has at least the potential to result in an adverse impact on the safe operation of the bus stop when compared to the existing technical compliant access to the property. An adverse impact on the operation of the bus stop, including whether it could even be installed, would undermine its purpose and fail to encourage the use of sustainable transport options as required by the Council’s planning policies.
I am also aware of the different views as to whether the appellant’s issues with access could be resolved by further trimming of vegetation. Upon review of the site and information before me, I agree with the appellant that removing more vegetation would be unlikely to have any material impact on resolving their concerns, which are related to the kerb width. However, this is not a determinative matter in this appeal as it does not overcome or justify the potential conflict between the proposal and the location of the planned bus stop set out above.
I further acknowledge that the proposed access alteration is needed to respond to a family member’s medical needs that would likely benefit from a smoother and less awkward entrance into the property, and represent inclusive design as required by the National Planning Policy Framework. However, the evidence presented does not conclusively confirm that the proposed revisions before me are a medical necessity in this regard, and as such I can only give them limited weight in this
Section 05
decision.
To conclude, it has not been demonstrated that the proposals would have an acceptable relationship with the planned bus stop, and consequently not adversely impact on walking, cycling and public transport opportunities. Having considered all matters before me, I conclude that the proposal is contrary to Policy BCS10 of the [name] 2011 and Policy DM23 of the Council’s Site Allocations and Development Management Policies 2014, which state that the Council will support the delivery of significant improvements to transport infrastructure; developments should be designed and located to ensure the provision of safe streets; not give rise to unacceptable traffic conditions, and provide safe and adequate access for all sections of the community.
Section 06
Other matters
I note that letters of support have been provided, albeit this is a neutral factor in this appeal as they do not provide any objective justification for the proposal in terms of its potential highway impact.
I also acknowledge that the appellant would accept relevant conditions to render the proposal acceptable. However, no conditions have been put to me in this regard, and as such this option is not available for me to consider in this appeal.
Section 07
Conclusion
For the reasons given above, and considering all matters raised, I conclude that the proposal does not accord with the development plan in terms of its potential for adverse impacts on the highway network. I, therefore, dismiss the appeal.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 6440No official casework-database value to compare
- Extracted decision date · page 1
- 2 October 2025Matches the official casework database
- Extracted site visit dates
- 2 September 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3368695
- Application reference
- 25/10479/H
- Lead case reference
- Not recorded
- Planning authority
- Bristol City Council
- Planning authority code
- E06000023
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 4 July 2025
- Valid date
- 4 July 2025
- Start date
- 8 July 2025
- Planning authority decision date
- 2 May 2025
- Appeal decision date
- 2 October 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 77300
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21