Appeal 3368818
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
first floor extension over the existing garage single storey extension to side and rear.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Preliminary Matters
The Council’s reasons for refusal relates to the first floor extension over the existing garage and the accompanying officer report confirms that this is the main area of concern. I have therefore defined the main issues on this basis.
Section 05
Main Issue
The main issues in this appeal are: • the effect of the proposed first floor extension on the character and appearance of the area; • the effect of the proposed first floor extension on the living conditions of the occupiers of 5 and 7 The Tabards, with particular regard to outlook and light, and on the living conditions of the occupiers of 6 The Hamlet and future occupiers of the appeal property, with particular regard to privacy.
Section 06
Character and appearance
The surrounding area is predominantly residential and consists of a mixture of bungalows and two storey detached dwellings. The properties on The Hamlet vary in form and scale, but red brick and brown tiled roofs are consistent.
The appeal property at [site address] is a generously sized dwelling which features a garage structure to the front. Neighbours to the west include 5 and 7 The Tabards, with their rear elevations and gardens facing towards the appeal site. The immediate neighbour to the east is 6 The Hamlet. Large front extensions can be seen close to the appeal site at 9 The Hamlet and [address].
Given the variety of form and scale within the street scene and the existing presence of similar extensions within the area, the proposal would relate well to the property and its surroundings. Furthermore, the extension would reflect both the host dwelling and neighbouring properties as it has been designed to mirror the same traditional style, with matching materials and roof form. Therefore, the design of the proposed first floor extension would positively contribute to the area’s identity and would not be an overly dominant addition to the host dwelling or the street scene.
I conclude that the proposed first floor extension would not have a harmful effect on the character and appearance of the area. It therefore accords with saved Policy ENV1 of the Selby District Local Plan (2005) and Policy SP19 of the Selby District Core Strategy (2013) which, amongst other matters, require that proposals take account of the standard of layout, design and materials in relation to the site and its surroundings, as well as positively contributing to an area’s identity. The proposal also accords with paragraph 135 of the National Planning Policy Framework which sets out that developments should be visually attractive and sympathetic to local character.
Section 07
Living Conditions
Only a small section of the proposed first floor element above the garage would extend along the rear boundary of 5 The Tabards, thereby limiting its effect on the outlook of this neighbouring property. Therefore, the proposal would not harm the living conditions of occupiers of No 5 with regard to outlook. However, as this first floor element would extend along the entire width of the existing garage, it would result in a width comparable to that of the main dwellinghouse. This would result in a significant amount of bulk sitting close to the rear boundary of 7 The Tabards. This, combined with the largely blank brick façade to this west elevation would result in a dominant structure, which would have an overbearing effect on both the garden and conservatory of No 7.
The sun path provided, combined with what I observed on site, indicates that there would be no significant overshadowing to the rear gardens of 5 and 7 The Tabards as a result of the proposed first floor extension due to the properties’ relative orientation and the natural path of the sun. I have no evidence before me to demonstrate otherwise. Therefore, the proposal would maintain acceptable levels of daylight and sunlight for Nos 5 and 7.
The windows to the proposed first floor extension that would sit closest to the main body of [site address] would have a restricted view towards the front elevation of 6 The Hamlet. Whilst the proposed extension would have a substantial forward projection, resulting in potential for intervisibility between the appeal site and 6 The Hamlet, these views would be at an oblique angle. This, together with the intervening distance between the proposed windows to the end of No 8’s first floor extension and No 6 would be sufficient to ensure there would be no loss of privacy for either the appeal property or No 6.
I conclude that although the proposed first floor extension would have an acceptable effect on the living conditions of the occupiers of 5 The Tabards, 6 The Hamlet and the appeal property, the proposal would have an unacceptable effect on the living conditions of the occupiers of 7 The Tabards, with particular regard to outlook. Consequently, the proposal would be contrary to Policy ENV1 of the Selby District Local Plan (2005) which, amongst other matters, require development proposals to take account of the effect they may have upon the living conditions of adjoining occupiers. The proposal also fails to respond to paragraph 135 of the National Planning Policy Framework which requires development to create a high standard of amenity for existing and future users.
Section 08
Conclusion and Recommendation
I have found that the appeal proposal would not result in harm to the character and appearance of the area. Whilst this weighs in favour of the scheme, it does not outweigh the unacceptable harm to the living conditions of the occupants of the neighbouring property at 7 The Tabards with regard to outlook.
For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be dismissed.
Section 09
Inspector’s Decision
I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 757No official casework-database value to compare
- Extracted decision date · page 1
- 14 November 2025Matches the official casework database
- Extracted site visit dates
- 2 September 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3368818
- Application reference
- ZG2025/0346/HPA
- Lead case reference
- Not recorded
- Planning authority
- North Yorkshire Council
- Planning authority code
- Not recorded
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 382 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- No
- Historic building grant made
- No
- Relates to a conservation area
- No
- Flooding is an issue
- No
- Site within an AONB
- No
- Site within an SSSI
- No
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 7 July 2025
- Valid date
- 10 July 2025
- Start date
- 14 July 2025
- Planning authority decision date
- 6 June 2025
- Appeal decision date
- 14 November 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 79697
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21