Skip to main content
Official casework recordAllowedCurrent release

Appeal 3368867

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

10 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

new timber driveway gates, brick columns, and garden walls facing the carriageway.

  1. Section 02

    Decision

    The appeal is allowed, and planning permission is granted for new timber driveway gates, brick columns, and garden walls facing the carriageway at [site address] , Solihull [postcode] in accordance with the terms of the application, [name]/2025/00909/MINFHO including drawing no 001A, and subject to the following condition:

    The driveway gates hereby approved shall be inward opening at all times.

  2. Section 03

    Appeal Procedure

    The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.

  3. Section 04

    Preliminary Matters

    The appeal evidence confirms that the development has already been carried out, and I saw this on my site visit. I have therefore considered the appeal on this basis.

  4. Section 05

    [name]

    The main issues are the effect of the development on: i) the character and appearance of the area; and ii) highway safety.

  5. Section 06

    Character and appearance

    The appeal site comprises a detached two-storey dwelling which is set back from the highway behind a gravelled driveway. The surrounding area is residential and characterised by detached dwellings of varied scale and design which are positioned at similar distances from the highway. Many of the properties on [address] have open driveways and mature trees and front boundary hedgerows are a prominent feature of the roadside. Whilst more limited, some front boundaries feature vehicle and pedestrian gates with occasional instances of brick walls or wooden fences, such as at [address] (No 98) which adjoins the appeal site, to the extent that they also form part of the local character.

    The wall and gates at the appeal site are only slightly greater in height than the front boundary treatment at No 98, and the tallest elements are set back from the boundary with the highway. The development is also seen in the context of other occasional boundary treatments of a similar scale and materials which ensures that it does not appear anomalous. Moreover, the prominence of mature hedgerows and trees to the frontage of many of the other frontages to this section of the road ensures that this greenery remains visually dominant and this further assimilates the development into its surroundings. As a result, the development acceptably harmonises with the street scene in this particular instance in line with the guidance on ‘boundary treatments’ in [address] Extensions Guidelines Supplementary Planning Document (2010).

    I conclude the development has an acceptable effect on the character and appearance of the area. The development therefore accords with policy P15 of the Solihull Local Plan (2013) (LP) and Policy BE.2 of the Balsall Parish Neighbourhood Development Plan 2018 - 2033 which require development to respect the surrounding built environment and be compatible with the distinctive character of the location.

  6. Section 07

    Highway safety

    On my site visit I observed an intermittent but regular flow of traffic on [address]. Passing vehicles did not travel at excessive speeds due to the 20mph speed limit and priority chicane located nearby. I also noted that at the time of my visit there were very few pedestrians walking along the pavements. I accept my observations are a snapshot in time, albeit they provide an indication of the likely daytime traffic conditions at this location.

    The gates that have been installed are inward opening and this could be secured in the long term by condition. Therefore, the full forecourt serving the appeal property between the pavement is available for use when the gates are being opened or closed. The photographic evidence provided shows that when the gates are closed an estate type car can substantively be accommodated on the forecourt, thereby not encroaching onto the vehicular carriageway and only marginally overhanging the pavement. Even then, any minor hindrance to passing pedestrians would be at most momentary in instances where the gates are being opened or closed.

    Therefore, even if the gates fall slightly below the set back distance usually sought by the Highway Authority, it is unlikely that vehicles entering or exiting the site would cause any significant obstruction to pedestrians on the footway or to the free flow of vehicular traffic.

    Accordingly, the development has an acceptable effect on highway safety. It therefore complies with Policy P8 of the LP which states that development will not be permitted if it causes a reduction in safety for any users of the highway.

  7. Section 08

    Conditions

    As the development has been completed as per the plans provided, it is not necessary to impose conditions relating to the time limit for commencement or for implementation in accordance with the drawings. However, I have attached a condition requiring the gates to be inward opening at all times to ensure that they do not reduce the amount of forecourt available, as this is one of the factors that has been influential to my findings.

  8. Section 09

    Conclusion and Recommendation

    For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be allowed.

  9. Section 10

    Inspector’s Decision

    I have considered all the submitted evidence and my representative’s report and on that basis the appeal is allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 121No official casework-database value to compare
    Extracted decision date · page 1
    25 November 2025Matches the official casework database
    Extracted site visit dates
    2 September 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3368867
Application reference
PL/2025/00909/MINFHO
Lead case reference
Not recorded
Planning authority
Solihull Metropolitan Borough Council
Planning authority code
E08000029

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
7 July 2025
Valid date
9 July 2025
Start date
9 July 2025
Planning authority decision date
3 July 2025
Appeal decision date
25 November 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
80322
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21