Appeal 3368867
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
10 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
new timber driveway gates, brick columns, and garden walls facing the carriageway.
Section 02
Decision
The appeal is allowed, and planning permission is granted for new timber driveway gates, brick columns, and garden walls facing the carriageway at [site address] , Solihull [postcode] in accordance with the terms of the application, [name]/2025/00909/MINFHO including drawing no 001A, and subject to the following condition:
The driveway gates hereby approved shall be inward opening at all times.
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Preliminary Matters
The appeal evidence confirms that the development has already been carried out, and I saw this on my site visit. I have therefore considered the appeal on this basis.
Section 05
[name]
The main issues are the effect of the development on: i) the character and appearance of the area; and ii) highway safety.
Section 06
Character and appearance
The appeal site comprises a detached two-storey dwelling which is set back from the highway behind a gravelled driveway. The surrounding area is residential and characterised by detached dwellings of varied scale and design which are positioned at similar distances from the highway. Many of the properties on [address] have open driveways and mature trees and front boundary hedgerows are a prominent feature of the roadside. Whilst more limited, some front boundaries feature vehicle and pedestrian gates with occasional instances of brick walls or wooden fences, such as at [address] (No 98) which adjoins the appeal site, to the extent that they also form part of the local character.
The wall and gates at the appeal site are only slightly greater in height than the front boundary treatment at No 98, and the tallest elements are set back from the boundary with the highway. The development is also seen in the context of other occasional boundary treatments of a similar scale and materials which ensures that it does not appear anomalous. Moreover, the prominence of mature hedgerows and trees to the frontage of many of the other frontages to this section of the road ensures that this greenery remains visually dominant and this further assimilates the development into its surroundings. As a result, the development acceptably harmonises with the street scene in this particular instance in line with the guidance on ‘boundary treatments’ in [address] Extensions Guidelines Supplementary Planning Document (2010).
I conclude the development has an acceptable effect on the character and appearance of the area. The development therefore accords with policy P15 of the Solihull Local Plan (2013) (LP) and Policy BE.2 of the Balsall Parish Neighbourhood Development Plan 2018 - 2033 which require development to respect the surrounding built environment and be compatible with the distinctive character of the location.
Section 07
Highway safety
On my site visit I observed an intermittent but regular flow of traffic on [address]. Passing vehicles did not travel at excessive speeds due to the 20mph speed limit and priority chicane located nearby. I also noted that at the time of my visit there were very few pedestrians walking along the pavements. I accept my observations are a snapshot in time, albeit they provide an indication of the likely daytime traffic conditions at this location.
The gates that have been installed are inward opening and this could be secured in the long term by condition. Therefore, the full forecourt serving the appeal property between the pavement is available for use when the gates are being opened or closed. The photographic evidence provided shows that when the gates are closed an estate type car can substantively be accommodated on the forecourt, thereby not encroaching onto the vehicular carriageway and only marginally overhanging the pavement. Even then, any minor hindrance to passing pedestrians would be at most momentary in instances where the gates are being opened or closed.
Therefore, even if the gates fall slightly below the set back distance usually sought by the Highway Authority, it is unlikely that vehicles entering or exiting the site would cause any significant obstruction to pedestrians on the footway or to the free flow of vehicular traffic.
Accordingly, the development has an acceptable effect on highway safety. It therefore complies with Policy P8 of the LP which states that development will not be permitted if it causes a reduction in safety for any users of the highway.
Section 08
Conditions
As the development has been completed as per the plans provided, it is not necessary to impose conditions relating to the time limit for commencement or for implementation in accordance with the drawings. However, I have attached a condition requiring the gates to be inward opening at all times to ensure that they do not reduce the amount of forecourt available, as this is one of the factors that has been influential to my findings.
Section 09
Conclusion and Recommendation
For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be allowed.
Section 10
Inspector’s Decision
I have considered all the submitted evidence and my representative’s report and on that basis the appeal is allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 121No official casework-database value to compare
- Extracted decision date · page 1
- 25 November 2025Matches the official casework database
- Extracted site visit dates
- 2 September 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3368867
- Application reference
- PL/2025/00909/MINFHO
- Lead case reference
- Not recorded
- Planning authority
- Solihull Metropolitan Borough Council
- Planning authority code
- E08000029
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 7 July 2025
- Valid date
- 9 July 2025
- Start date
- 9 July 2025
- Planning authority decision date
- 3 July 2025
- Appeal decision date
- 25 November 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 80322
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21