Appeal 3368918
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as a ‘two storey side extension, two storey rear extension, rear dormer, hip to gable roof’.
Section 02
Decision
The appeal is dismissed.
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
[name]
The main issues are the effect of the proposed development on a) the character and appearance of the area; and b) the living conditions of the occupiers of Number [address] (No. 16) with specific regard to outlook, light and privacy.
Section 05
Character and Appearance
The appeal property is an end terraced dwelling, situated on a prominent corner plot at the junction of [address] and [address]. It appears to have been extended at single storey to the rear and has a large timber clad shed like building to the side, with a small rear garden. The immediate area is residential and comprises similar dwellings set back from the highway with small front gardens. The property has a hipped roof (a distinguishing characteristic of [address] and surrounding area), and the dwellings, by virtue of limited visible alterations and uniform height and width, lend a pleasant cohesive rhythm to the street which contributes positively to the character and appearance of the area.
Both side and rear extensions, by virtue of their height and width, would appear as overly large, visually dominant additions. While the shallow roof pitch proposed at the rear would be unreflective of the original form of the host building. The proposals would not only be building upon an established footprint. The garden shed like structure referred to as part thereof is vastly different from the appeal proposals. While the flat roof elements may appear minor in isolation, they would contribute to a design that is inconsistent with the established character of the surrounding street scene, exacerbating the overall visual harm. While other side extensions have been cited, they vary significantly in age, design, and scale. As such, they do not justify an extension of the size and design proposed in this appeal scheme. For the reasons outlined, the proposals would be inappropriate in their context.
The proposed dormer window would not be set down from the ridge and would occupy almost the entire width of the roof slope, including the proposed side extension. This would result in an overly large, boxy and incongruous addition that would significantly erode the original quality of the roof’s shape, appearing disproportionately large compared to neighbouring dwellings. While a dormer window could potentially be constructed under permitted development rights, it is evident to me that this fallback position would result in a development of significantly lesser scale than that which is currently proposed. Consequently, I do not consider it to be a comparable alternative. In addition, the appeal decision referred to is not directly similar, with the Inspector expressly acknowledging the existence of multiple rear dormer extensions within the street and observing that public visibility of the development was limited.
The hipped to gable roof would introduce a jarring and inharmonious element that would disrupt the architectural rhythm and symmetry of the terrace. The inclusion of front elevation rooflights would add to this discordance, introducing features uncharacteristic of the area.
Given the property's prominent position, the visual impact of the proposals would be particularly pronounced, reinforcing the perception of an overdeveloped site. The proposals would be clearly visible from public vantage points, exacerbating the harm to the surrounding area. Consequently, the proposed development would conflict with Policies SP1 and DM1 of the Manchester’s Local Development Framework, Core Strategy Development Plan Document (2012) (CS) and Policy DC1 of the Unitary Development Plan for the City of Manchester (1995) (UDP). As well as guidance contained in the National Planning Policy Framework, which, amongst other things, seek to ensure new development is of appropriate scale, form and massing, having regard for the design and appearance of the surrounding area.
Section 06
Living Conditions
The existing single storey extension is built partly on the boundary with No. 16, which also appears to have been extended with a single storey rear extension and conservatory. The proposed first floor addition would not significantly increase the sense of overbearing to a degree that would result in an unacceptable loss of outlook for the occupiers of No. 16. Nor would it create an oppressive sense of enclosure, given that the nearest ground floor habitable windows of No. 16 are located beyond the proposed extension. The proposal would have only a marginal impact on the amount of morning light reaching the upstairs bedroom and would not noticeably darken the room or significantly alter its outlook, which remains primarily over an open, unobstructed rear garden.
Although the proposed rear bedroom window would extend beyond the existing fenestration, due to the limited size of the rear gardens, it would not materially increase the availability of views into No. 16’s garden. As such, I am satisfied that the occupiers of No. 16 would continue to enjoy a good standard of privacy. Accordingly, the proposals would not cause harm to the living conditions of neighbouring occupiers. Therefore, they would accord with Policies SP1 and DM1 of the CS, and Policy DC1 of the UDP, which, amongst other things, seek to ensure that development does not result in a loss of amenity for neighbouring occupiers.
Section 07
[name]
I am aware that one of the purposes for the proposal is to provide separate ground floor living accommodation for one of the occupants of the dwelling due to personal circumstances. In considering my recommendation, I have had due regard to the Public Sector Equality Duty set out under section 149 of the Equality Act 2010, particularly the need to eliminate discrimination against persons with protected characteristics of age and/or disability, advancing equality of opportunity for those persons and fostering good relations between them and others.
However, it has not been adequately demonstrated that the proposal is the only way of providing for those personal circumstances at the site. Therefore, the potential benefits of the proposal would not outweigh the harm that has been identified and interference with the duty under the above act is proportionate in this case and the refusal of planning permission justified.
Section 08
Conclusion and Recommendation
[name] have found for the appellant on the second main issue, this is as a result of a lack of harm which would be a neutral matter. There are no material considerations that would attract sufficient weight to indicate a decision other than in accordance with the development plan with which the appeal scheme would conflict owing to my findings on the first main issue. It is for this reason that I recommend the appeal is dismissed.
Section 09
Inspector’s Decision
I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1895No official casework-database value to compare
- Extracted decision date · page 1
- 1 October 2025Matches the official casework database
- Extracted site visit dates
- 26 August 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3368918
- Application reference
- 142264/FH/2025
- Lead case reference
- Not recorded
- Planning authority
- Manchester City Council
- Planning authority code
- E08000003
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 8 July 2025
- Valid date
- 16 July 2025
- Start date
- 16 July 2025
- Planning authority decision date
- 23 April 2025
- Appeal decision date
- 1 October 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 77226
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21