Skip to main content
Official casework recordAllowedCurrent release

Appeal 3368932

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

10 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

No verified development description has been extracted from an official decision PDF yet.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for an outbuilding at [site address] , Essex [postcode] in accordance with the terms of the application, [name]/0524/25, subject to the following conditions:

    The development hereby permitted shall remain in accordance with drawing no 01 [name].

    The external surfaces of the development hereby permitted shall remain in accordance with the materials shown on the planning application form.

  2. Section 03

    Preliminary Matters

    At the time of my site visit, the development had already been carried out in accordance with the submitted drawings. I have therefore proceeded with the appeal on this basis. I have also removed the word ‘retrospective’ from the description of development in the banner heading above as this is not a term of development. The description of development also included a comparison between the actual height of the outbuilding and what would be allowed under permitted development. As this is not a term of development and in the interests of conciseness, I have removed this element from the description of development in the banner heading above.

  3. Section 04

    [name]

    The main issues are the effect of the proposal on: • The character and appearance of the area; • The living conditions of the occupiers of the adjacent property ‘Whitebeams’; and • Protected trees.

  4. Section 05

    Character and appearance

    The appeal site consists of a large detached dwelling on a generous plot. There is a range of house designs and sizes in the street. The houses are all set back from the road and there are many trees adjacent to the highway. Overall this has created a pleasant and attractive street scene which contributes positively to the character and appearance of the area.

    The outbuilding is situated in the rearmost part of the rear garden. The design, height and materials are not uncommon for garden buildings, and its scale is not disproportionate to the size of the garden. Views of the outbuilding are very limited from public vantage points.

    For these reasons, the outbuilding relates positively to its context and does not cause harm to the character and appearance of the area. The development therefore complies with Policy DM9 of the Epping Forest District Local Plan 2011- 2033 (LP), insofar as it requires development to be of a high-quality design which contributes to the character of the area and relates positively to its context.

  5. Section 06

    Living conditions

    The outbuilding is adjacent to the garage and a small paved area to the rear of ‘Whitebeams’. Although this paved area receives less sunlight than before, the increase in overshadowing is limited by the orientation of the outbuilding to the west of ‘Whitebeams’. Furthermore, a larger lawned garden area is situated to the eastern side of ‘Whitebeams’, and the distance between this larger garden area and the outbuilding is sufficient to prevent any loss of sunlight or overbearing effect.

    Notwithstanding the garage, the rear windows at ‘Whitebeams’ do not directly face the outbuilding. Despite the difference in land levels and the height of the outbuilding, its orientation and separation to the rear windows ensure that there is no significant overshadowing or overbearing effect to these windows.

    For these reasons the outbuilding does not cause harm to the living condition of the occupiers of ‘Whitebeams’. The development therefore accords with LP Policy DM9, insofar as it requires development to provide good sunlight and daylight to adjacent buildings and not result in an overbearing effect or overly enclosed form of development.

  6. Section 07

    Protected trees

    There are two trees subject to Tree Protection Orders in the vicinity of the outbuilding. No substantive information has been provided detailing any tree protection measures that were carried out during the construction of the outbuilding. However, the protected trees appear to be at a lower land level than the outbuilding which, together with the distance between the trees and the outbuilding, would ensure that the outbuilding does not cause unacceptable compaction of the soil and that the drainage for the outbuilding does not affect the rooting areas. I also note that the Council accepts that an outbuilding in the same position which is 0.2 metres less in height would be permissible under permitted development.

    For these reasons the development accords with LP Policy DM3, insofar as it requires development to directly, indirectly or cumulatively cause significant harm to landscape character.

  7. Section 08

    Other Matters

    The planning application sought permission solely for the outbuilding. Whether or not the boundary wall and fence require planning permission, and the effect of the wall and fence on the living conditions of neighbouring occupiers, fall outside the scope of this appeal.

  8. Section 09

    Conditions

    As the development has already been carried out, the standard commencement condition is not necessary. However, in the interests of certainty, conditions are required to ensure that the development remains in accordance with the submitted drawings and specified external materials.

  9. Section 10

    Conclusion

    For the reasons given above the appeal should be allowed subject to the conditions listed above.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5869No official casework-database value to compare
    Extracted decision date · page 1
    10 December 2025Matches the official casework database
    Extracted site visit dates
    10 September 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3368932
Application reference
EPF/0524/25
Lead case reference
Not recorded
Planning authority
Epping Forest District Council
Planning authority code
E07000072

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
29 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
8 July 2025
Valid date
8 July 2025
Start date
23 July 2025
Planning authority decision date
15 May 2025
Appeal decision date
10 December 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
81184
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21