Skip to main content
Official casework recordAllowedCurrent release

Appeal 3369071

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as ‘Proposed increase in height to existing breeze block pool flat roof pool house structure.’

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for erection of replacement pool house at [site address] in accordance with the terms of the application, Ref 25/00201/FULHH, subject to the following condition:

    The development hereby permitted shall be carried out in accordance with drawing nos: 100/1080/2025 [name]; 100/1081/1025 [name]; and 100/1079/2025 [name].

  2. Section 03

    Preliminary Matters

    Whilst the description of development on the application form was ‘Proposed increase in height to existing breeze block pool flat roof pool house structure’, the development was described as the erection of replacement pool house (retrospective) in appellant’s Statement of Case. The Council plainly considered this as a replacement building as set out in the [name]. That is also clear in the reasons for refusal with reference to the building being materially larger. The appellant is content that the development is considered as the erection of replacement pool house (retrospective) and has suggested that the development is described in that way. I have used this description in my formal decision, but I have not included the term ‘retrospective’ as this is not an act of development.

    The site is located within the buffer zone of the Cannock Chase Special Area of Conservation (SAC). Whilst not forming part of the Council’s reasons for refusal, as the competent authority I need to consider whether there would be adverse effects on the integrity of the habitats site in accordance with The Conservation of Habitats and Species Regulations 2017.

  3. Section 04

    [name]

    The main issues relevant to this appeal are: whether the development is inappropriate development in the Green Belt having regard to the National Planning Policy Framework (the Framework) and relevant development plan policies; and the effect of the development upon the character and appearance of the area.

  4. Section 05

    Whether Inappropriate Development

    A lawful development certificate was granted in 2013 for the construction of a breeze block structure enclosing the swimming pool on the appeal site. Based on the evidence before me, a replacement building has since been erected in broadly the same location as the original structure.

    Policy GB1 of the Core Strategy Development Plan Document (CS) set out that development acceptable within the terms of national planning policy set out in the Framework will normally be permitted concerning several different types of development. This includes the replacement of an existing building where the new building is not materially larger than the building it replaces. Paragraph 154d) of the Framework is similarly worded but also requires that the new building is in the same use.

    The submitted evidence indicates that the original pool house featured a pitched roof, whereas the replacement building has a flat roof. It is agreed that the footprint of the new building is broadly comparable to that of the original. Therefore, the primary difference in scale between the two structures arises from the change in roof form. It is also agreed that the use of the building remains consistent with that of the previous structure.

    The appellant states that the height of the flat-roofed building is approximately 3.29 metres, compared to a ridge height of around 5 metres for the original pitched-roof structure. The Council has not disputed these figures, and based on the evidence before me, I find no reason to so either. While the flat roof results in an increased eaves height and a more uniform wall height across the building’s footprint, the overall height is reduced in comparison to the original. This change in design has resulted in a building that, although different in form, is not materially larger than the structure it replaced when considered as a whole.

    For the reasons given above, the development is not inappropriate development in the Green Belt and consequently, it complies with Policy GB1 of the CS as well as paragraph 154d) of the Framework, insofar as the replacement building is not materially larger than the one it has replaced and is in the same use.

  5. Section 06

    Character and Appearance

    The appeal building is a cuboid structure featuring predominantly glazed elevations, interspersed with sections of red brick and cream render. It has a flat roof, upon which several photovoltaic panels are installed, angled upwards. Due to its siting behind the main dwelling, Ellesmead, the appeal building is well screened from public viewpoints.

    Ellesmead is a substantial two-storey dwelling constructed using red brick, cream render, and exposed timber detailing, with a pitched roof finished in red tiles. While the Council has noted some variation in the brickwork, possibly indicating recent construction activity, based on my site visit, the materials used in both buildings appear broadly consistent.

    The appeal building is noticeably smaller in scale than the host dwelling and is therefore subordinate to it. The use of red brick and cream render establishes a visual relationship between the two structures. The previous building on the site reportedly featured extensive glazing and whilst the current structure includes full-height windows, these are not uncommon in pool buildings. The flat roof design does not replicate the pitched roof of the host dwelling; however, the inclusion of photovoltaic panels introduces visual interest at roof level. While the building incorporates large, glazed areas, this is appropriate for its intended use, and the interspersed brickwork and render helps to soften the overall appearance. Although the building’s rectilinear form is not typical of a domestic outbuilding, its modest scale and the use of sympathetic materials ensure that it does not appear unduly commercial or incongruous within this residential setting. Overall, the building is appropriate in both scale and appearance for its function as a pool house in this context.

    Therefore, the development does not harm the character or appearance of the area and complies with Policy EQ11 of the CS. This expects that, amongst other matters, in terms of scale, volume, massing and materials, development should contribute positively to the street scene and surrounding buildings, whilst respecting the scale and spaces and buildings in the local area.

  6. Section 07

    Other Matters

    The appeal site is within the 8-kilometre buffer zone of the SAC, a European site afforded protection under the Conservation of Habitats and Species Regulations 2017 (the Regulations). The Regulations require that the competent authority may agree to the plan or project only after having ascertained that it will not adversely affect the integrity of European sites. This requires consideration of whether the development has an effect on the qualifying features of the site, either alone or in combination with other plans and projects. Where the potential for likely significant effects cannot be excluded, an appropriate assessment of whether the plan would affect the integrity of a European site must be undertaken.

    The qualifying reasons of the SAC and its primary reasons for selection as an SAC are its European dry heaths and [name] wet heaths with cross-leaved heath. The conservation objectives of the SAC include ensuring that the integrity of the site is maintained or restored as appropriate, including its structure and function, supporting processes on which the qualifying natural habitats rely.

    Given the separation distance between the appeal site and the SAC, the development does not result in the direct loss of any habitats associated with the SAC. Taking into consideration the nature, scale and location of the development and nature of the receiving environment, I consider there to be no evident pathway that would result in the development having a likely significant effect on any qualifying features of the SAC, whether alone or in combination with other developments.

    Therefore, the scheme does not undermine the conservation objectives of the identified habitats site, and an appropriate assessment is not required. Consequently, the development accords with the policies in the Framework that seek to protect areas of particular importance relating to habitats sites.

    The appeal site is identified that as being within a [name] for [name]. However, the Staffordshire District Licensing Officer ([name]) did not object to the application. Given that this development relates to retrospective development and replaced a building in the same general location I find no reason to come to a different conclusion.

    The Council concluded that due to the distance between the pool building and the nearest residential dwellings and its ancillary nature that the development does not result in any undue harm to noise or privacy issues to nearby neighbouring occupiers. Based on the information before me and for similar reasons, I concur.

  7. Section 08

    Conditions

    Given that the development has already taken place it is not necessary to include the statutory commencement condition. However, a condition requiring the development is carried out in accordance with the permitted plans is necessary in the interests of certainty.

  8. Section 09

    Conclusion

    For the reasons given above, the development accords with the development plan and the material considerations, including the Framework, do not indicate that the appeal should be determined other than in accordance with it. Therefore, I conclude that the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4476No official casework-database value to compare
    Extracted decision date · page 1
    14 November 2025Matches the official casework database
    Extracted site visit dates
    23 September 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3369071
Application reference
25/00201/FULHH
Lead case reference
Not recorded
Planning authority
South Staffordshire District Council
Planning authority code
E07000196

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
10 July 2025
Valid date
10 July 2025
Start date
14 July 2025
Planning authority decision date
23 May 2025
Appeal decision date
14 November 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
79700
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21