Skip to main content
Official casework recordDismissedCurrent release

Appeal 3369106

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

4 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

Rear and side extension and new roof incorporating loft conversion at [site address] .

  1. Section 02

    Issue - effect on the character and appearance of the surrounding area

    The appeal property (No. 28) is a detached bungalow. It is located within [address], which is characterised by low profile single storey dwellings which, despite some minor variations, are generally similar in design and of the same height. At present, No. 28 reflects the consistent building height of the surrounding single storey properties and thus contributes positively to the uniform character and appearance of the area.

    The appeal proposal seeks to increase the ridge height of the dwelling upwards considerably beyond the existing building height. It would also increase the height and width of the projecting front gable and introduce dormer windows to the front and rear roof slopes. The eaves height would remain unchanged, and the main roof slope would be set back from the front elevation of the adjoining property at [address]. Nonetheless, by virtue of the height, bulk and scale of the proposed development the resulting dwelling would appear unduly dominating and visually incongruous in the local context. Consequently, it would detract from the prevailing character of the area. The remaining space between the built form and the adjoining properties, which would be modest, would not mitigate these effects.

    In light of the above considerations, I conclude that the proposed development would unacceptably harm the character and appearance of the area. Thus, it would conflict with the development plan policies cited in the decision notice.

  2. Section 03

    Other Matters

    The National Planning Policy Framework sets out that planning policies and decisions should ensure that developments do not prevent or discourage appropriate innovation or change. However, it also seeks to ensure that development is sympathetic to local character, including the surrounding built environment. In addition, while I am mindful of advice in the National Design Guide, January 2021, that well-designed places do not need to copy their surroundings in every way, and it is appropriate to introduce elements that reflect how we live today, it is also clear that well-designed development is that which integrates into its surroundings so it relates well to them.

    While the Council has found an upward extension to be acceptable at [address], this is not a feature of the character of [address] generally. As indicated above, this particular proposal, assessed on its own merits, would lead to harm to that character.

    My attention is also drawn to examples of developments at [address], [address], [address] and [address]. However, these properties appear to be in a different context to the appeal site, whereby the surrounding built form is more varied in terms of building heights and roof designs. Therefore, from the evidence before me, they do not appear to be directly comparable to the appeal scheme, and as such the weight to be attached to these is limited.

    Extending upwards may represent an efficient use of the site, while maintaining the existing landscaping and outdoor space. However, there is no compelling evidence that harm would arise should an alternative scheme to enlarge the dwelling be pursued, or that the appeal proposal is the only means to increase the floor area of the property to provide family sized accommodation.

    Even if the proposed development would not give rise to harm in other regards, this is a normal expectation of new development and therefore of neutral weight.

  3. Section 04

    Conclusion

    The proposal would conflict with the development plan read as a whole. Material considerations do not indicate a decision otherwise than in accordance with the development plan. Thus, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4746No official casework-database value to compare
    Extracted decision date · page 1
    8 October 2025Matches the official casework database
    Extracted site visit dates
    18 September 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3369106
Application reference
P/25/00033/HOU
Lead case reference
Not recorded
Planning authority
Bournemouth, Christchurch and Poole
Planning authority code
E06000058

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
11 July 2025
Valid date
11 July 2025
Start date
16 July 2025
Planning authority decision date
23 May 2025
Appeal decision date
8 October 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
77619
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21