Skip to main content
Official casework recordSplit DecisionCurrent release

Appeal 3369202

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as formation of first floor extension, pergola, decking, retention and formation of boundary treatments and associated works (part retrospective).

  1. Section 02

    Decision

    The appeal is dismissed insofar as it relates to the front wall and associated piers. The appeal is allowed insofar as it relates to the formation of first floor extension, pergola, decking and side fence at [site address] in accordance with the terms of the application, [name]/2025/0037, and the plans submitted with it, so far as relevant to that part of the development hereby permitted and subject to the following conditions:

    The first floor extension hereby permitted shall begin not later than 3 years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with the following approved plans and report, in so far as they relate to the first floor extension hereby permitted: EX.1 dated 11.12.2024, EX.2 dated 11.10.2024, EX.3 dated 11.12.2024, PR.1 dated 09.07.2024, PR.3 dated 11.12.2024, EX.4 dated 11.12.2024, EX4 dated 10.12.2024, EX5 dated 11.02.2025, AB.1 dated 28.01.2025, AB.2 dated 28.01.2025 and the Bat and Nesting Bird Assessment Report undertaken by [name], dated August 2024.

    The materials to be used in the construction of the external surfaces of the first floor extension hereby permitted shall match those used in the existing dwelling.

  2. Section 03

    Preliminary matters

    The description for the development as set out in the application form and the council’s decision notice refer to part of the proposal being retrospective. As permission cannot be granted retrospectively, I have deleted this from the description used in this decision. The elements of the proposal that have already been built or partially constructed include the pergola and associated decking and the boundary fence. The decision also refers to the boundary treatments without identifying each aspect. In this decision I refer to the proposed boundary treatments as side fence and front wall and associated piers. This is in the interests of precision.

    At the time of the appeal site visit a dark grey brick wall and associated tall brick piers had been constricted along the front boundary of the appeal site. This wall and associated piers differs in height, form and design from the front wall shown on the submitted drawings. For the avoidance of any doubt, I confirm that this decision deals solely with the wall and associated piers shown on the application drawings and not the wall which currently exists.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposal on the character and appearance of the street scene and the area.

  4. Section 05

    Reasons

    [address] includes a broad range of the single and two storey dwellings whose front and rear gardens vary in size and depth. This together with the steeply sloping topography, curved alignment of the road; mature soft planting within gardens and the wider landscape; and the expansive views towards the coast contribute to the informal and suburban character and appearance of the street scene and the area around the appeal site.

    Front and side boundary treatments vary, often reflecting the topography within the street scene. In the area where the appeal site is located there is a diverse range of tall walls to the front of elevated sites and lower walls with vertical timber slatted fences or hedges above or to the rear of the walls. Side boundaries include a mixture of low and tall walls, fences and hedges. The walls are constructed from stone, red brick or have a rendered finish. Wall piers are built from the same range of materials and are typically modest in mass, form and appearance.

    Along this part of [address] some of the gardens include soft planting, whilst others are dominated by parking spaces and hard landscaping. Conversely, a short distance to the southeast of the appeal site soft landscaping dominates the street scape. To the north of the junction with [address] the character similarly becomes gradually more verdant, creating a gentle transition between the town and the open countryside.

    The existing tall fences and walls within the vicinity of the appeal site have blended in to the street scene with varied degrees of success depending on their location, height, materials, design and existence of soft planting. Rather than set a precedent for the proposal they highlight the need to assess each proposal on its individual merits and in accordance with the prevailing planning policies.

    The appeal property occupies a prominent position in the street scene, adjacent to the junction of [address], [address] and [address]. The appeal dwelling is a comparatively narrow two storey dwelling with a simple hipped roof. At ground floor level it has a side extension with a part flat and part hipped roof that faces [address] and a front bay with a hipped roof.

    Amongst other things policy DE1 of the Torbay Local Plan 2012–2030 (LP), seeks to ensure that developments are well designed and respect Torbay’s special qualities. Policy PNP1(C) of the Paignton Neighbourhood Plan (PNO), states that proposals should strengthen local identity by retaining attractive and distinctive natural and man-made features. Proposals should be in keeping with their surroundings and respect local scale, design, height, landscaping and important landscape or townscape vistas. Paragraph 135 of the National Planning Policy Framework 2024 (the Framework) similarly requires proposals to be visually attractive and sympathetic to local character and history.

    To the side of the appeal property the proposed vertical boarded fence has been erected immediately to the rear of an existing long established low stone wall. Together they form a continuous enclosure along most of the side of the property. The low wall abuts the pavement and the fence runs along the edge of the wall and very close to/contiguous with the highway. Having regard to these factors I find that the siting of the fence readily falls within the term ‘adjacent’ to the pavement which forms part of the adopted highway. Accordingly, the proposed fence requires planning permission. The term adjacent is defined in various dictionaries as including close, near and contiguous.

    The pavement around the junction with [address] is particularly wide. As a consequence the area around the junction is open and spacious even with the existence of the appeal fence and the wall around the property on the opposite side of the junction. Most of the proposed fence has started to weather and together its pale colour, curved top and siting just behind the stone wall give it a soft appearance which respects the street scene. On its own this aspect of the proposed boundary treatment would blend in appropriately with the street scene. At the same time, it would provide a reasonable level of privacy and security for the occupiers of the appeal property.

    The proposed front wall would be modest in height and form. Subject to the use of appropriate materials which respect those used in the locality, this aspect of the proposed front boundary treatment would blend in readily with the street scene. However, due to their combined size, mass and height the associated wall piers would appear heavy, bulky and prominent within the street scene where they would have an uncharacteristic urbanising impact. Both on their own and together with the proposed wall the proposed piers would have an unduly enclosing impact and would appear overbearing alongside the proposed tall fence. The proposed Laurel hedge would fail to offset this harm. For this reason, the proposed wall and associated piers would materially detract from the character and appearance of the street scene and the area.

    This harm would clearly outweigh the benefits for the appellant and their family that would result from the proposed front wall and associated gate piers. It is also not a matter that could be adequately dealt with by condition.

    Conversely, the proposed pergola would be modest in size, height and form, would respect the host dwelling, and would be largely screened from the street scene. The proposed side extension would be set back from the front elevation of the host dwelling. It would sit above the existing single storey side extension and its fully hipped roof would be set below the main ridge line of the dwelling. The proposed side extension would respect the form, proportions and materials of the host dwelling and visually would break up the deep side elevation of the dwelling. For these reasons the proposed side extension would appropriately complement the host dwelling, which would appear more balanced in width and depth within the street scene.

    I conclude on the main issue that the proposed wall and associated piers would unacceptably detract from the character and appearance of the street scene and the surrounding area. They would therefore be contrary to LP Policy DE1, PNP Policy PNP1(C)B and paragraph 135 of the Framework. Conversely the proposed fence, pergola, decking and side extension would respect the host dwelling, the street scene and the area. Accordingly, they would comply with the above policies.

    In view of the acceptability of the proposed fence, pergola, decking and side extension I have considered the possibility of making a split decision. As these aspects of the proposal are physically and functionally separate from the front boundary wall and associated piers a split decision is possible and appropriate.

  5. Section 06

    Conditions

    The council has not suggested the imposition of any conditions. In relation to the proposed pergola, decking and fence I agree that none are necessary as the structures have been constructed. In relation to the proposed first floor extension, I consider that the standard 3 year time limit should apply along with conditions which require the development to be carried out in accordance with the approved plans and bat and nesting bird report, and that the materials to be used in the construction of the external surfaces of the first floor extension should match those used in the host dwelling. This is in the interests of certainty; to ensure the development respects the character and appearance of the host dwelling and the street scene and to protect wildlife. I consider that these conditions are both necessary and reasonable.

  6. Section 07

    Conclusion

    Having regard to the conclusion on the main issue and all other matters raised the appeal is dismissed in-so-far as it relates to the proposed wall and associated piers. The appeal is allowed insofar as it relates the proposed pergola, decking, first floor side extension and fence adjacent to the side boundary of the property.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 1220No official casework-database value to compare
    Extracted decision date · page 1
    5 September 2025Matches the official casework database
    Extracted site visit dates
    21 August 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3369202
Application reference
P/2025/0037
Lead case reference
Not recorded
Planning authority
Torbay Council
Planning authority code
E06000027

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
45 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Split Decision
Decision category
Split decision
Received date
14 July 2025
Valid date
14 July 2025
Start date
17 July 2025
Planning authority decision date
14 May 2025
Appeal decision date
5 September 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
75884
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:28
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21