Appeal 3369375
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the erection of a front porch, first-floor front to side extension, single and two-storey rear extension, external alterations.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue is the effect of the proposal upon the character and appearance of the appeal property and wider area.
Section 04
Reasons
The appeal relates to one half of a semi-detached pair which have a distinctive shared two-storey central feature with double-height bay windows under a hipped roof and long sloping ‘cat-slide’ roofs and recessed wings to each side, with eaves at ground-floor level. This same design approach appears at intervals along the east side of [address], where the appeal property is positioned, and within the wider area, where properties are generally of similar age but of mixed appearance and type, often with repeat designs intermingled.
The Council has raised no concern with the proposed front porch extension, the single-storey rear extension, or the first-floor extensions to the rear. I have no reasons to disagree with regard to any of these elements, which would integrate themselves reasonably well with the existing property.
Part of the proposal is to increase the size and quality of the existing living space at first-floor level. This would include a roof extension across the full width of the front facing roof slope of the recessed wing which would project forward to be set just marginally back from the front bay, and which would have a flat crown roof, first-floor eaves height, and a single window aligned with one similar below.
During my visit, I was struck by how catslide roofs and low eaves heights were strong and unifying features of [address], despite the variety of property types. Notwithstanding some past alterations to No 72, its original form remains dominant and contributes positively to the cohesion of the street scene.
The proposed front roof extension would significantly remodel the appearance of the appeal property. The low eaves would be lost in favour of a front elevation that would be obviously two-storey in scale and form, amplified by both the uncharacteristic expanse of facing render and the introduction of a window at original roof level. Further still, the flat crown would be an incongruous and alien configuration that would appear as a poorly conceived adjunct with little respect for the original architectural composition of the pair, or the harmony of the street scene.
I recognise that many similar properties within the wider area have undergone extensive alterations. With this in mind and having regard also to the variety of house types locally, I place little significance to the symmetry of Nos 72 and 74. I saw many examples where original symmetry between attached pairs had been lost. Nevertheless, in the vast majority of cases I saw a balanced outcome, where modifications were successfully integrated into the fabric of the original structure as part of an overall cohesive design. A few examples locally were less successful and demonstrated to me how poorly designed additions can negatively impact the quality of the built environment.
In this case, I find the proposal to be neither a modest roof addition nor a comprehensive remodel that would create a well-balanced and co-ordinated semi-detached pair. Whilst the proposed front roof extension may be subordinate in size to the dwelling as a whole, and notwithstanding the use of matching materials, it would stand dominant within the front roof slope and would be visually intrusive within the street scene. This would be to the detriment of the character and appearance of No 72 and the wider area. As such, it would fail to meet the objectives of the Council’s Residential Design Guide Supplementary Planning Document (2010) as far as it seeks to ensure residential extensions harmonise with the scale and style of the original building and the character of the area. There would therefore be conflict with Policy D3 of The London Plan (2021), Policy CS1.B of the [name] (2012), and Policy DM1 of the Council’s Development Management Policies (2013). Between them, and amongst other things, these seek to ensure that new development achieves a high standard of design that responds positively to local distinctiveness. For these same reasons there would be conflict with the National Planning Policy Framework’s objectives for achieving well-designed places.
Section 05
[name]
I have noted an objection concerned with overlooking properties to the rear of the site from the proposed first-floor extension to the rear. However, this would amount to an extension of an existing rear facing first-floor element. With this in mind and having regard also to the depth of the rear garden and separation distances involved, I share the Council’s view that there would be no degree of overlooking that would be harmful to the living conditions of any neighbouring occupiers.
Section 06
Conclusion
I recognise that the proposed works would create additional space for the appellant’s family needs, but these factors do not outweigh the harm that I have identified or the conflict with the development plan. Accordingly, for the reasons given, and having regard to all other matters raised, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 286No official casework-database value to compare
- Extracted decision date · page 1
- 4 September 2025Matches the official casework database
- Extracted site visit dates
- 21 August 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3369375
- Application reference
- PL/0470/25
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Harrow
- Planning authority code
- E09000015
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 16 July 2025
- Valid date
- 17 July 2025
- Start date
- 17 July 2025
- Planning authority decision date
- 16 May 2025
- Appeal decision date
- 4 September 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 75801
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21