Appeal 3369380
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
4 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
No verified development description has been extracted from an official decision PDF yet.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue is the effect of the proposal on the safety and convenience of highway users.
Section 04
Reasons
The appeal site comprises a semi-detached house (‘No 197’), which is set back slightly from the pavement, partly behind a boundary wall and a predominantly hard surfaced forecourt. The plot is located on a curved section of [address], close to its junction with [address].
As illustrated on the submitted drawings, there is a narrow gap between No 197’s bay window and the front of the plot, such that a car parked here would need to be positioned broadly parallel, or at a slight angle, to the road to avoid overhanging the pavement. Given those tight dimensions, and in the absence of vehicle tracking diagrams, drivers would need to undertake awkward manoeuvres across the pavement in order to position a vehicle free of the highway and without encroaching onto adjacent plots.
Whilst the appellant claims that vehicles could ‘technically’ enter, turn, and exit in a forward gear, given the plot’s dimensions that would appear to me to be highly improbable without undertaking multiple manoeuvres over the pavement or adjoining land. Consequently, the proposal would result in reversing manoeuvres to or from [address].
I have not been provided with data from the automatic traffic counts undertaken by the appellant. However, on the basis that [address] does not carry more than 10,000 vehicles per day, it is not a ‘busy classified road’, as defined at footnote 6 of Policy DMD 46 of the Enfield Development Management Document (2014) (‘EDMP’).
Having regard to CrashMap data, he points out that there were just four ‘slight’ incidents within 200 metres of the site in the latest available 5 year period. He notes that 191, 193 and [address] (amongst others) have vehicle accesses with no ability to turn a vehicle around; and continues that none of the recorded incidents resulted from the use of crossovers, although I have no detailed evidence underpinning that claim.
At the time of my visit, [address] was fairly busy, with a constant volume of traffic, including busses which I understand stop nearby. Whilst the carriageway is fairly wide, the space available for traffic movements is limited by parking on both sides of the road. Given the volume of traffic, the curvature of the road, and the proximity to a junction, I consider that awkward reversing manoeuvres to or from the site, often between parked cars, would be detrimental to the efficient and free flow of traffic, and would compromise highway safety.
The 3 metre wide access would result in the loss of one publicly available on-street parking space. I have no data regarding on-street parking pressures in the area. However, I observed that not all nearby properties have off-street parking and, whilst it represents just a snapshot in time, the majority of nearby on-street spaces were occupied at the time of my visit. Thus, I have no cogent reason to doubt the Council’s claim that this is an area with high on-street parking demand.
The provision of an off-street space for the use of No 197 would be at the expense of an on-street space, which could be used by anyone, at any time. The scheme would therefore add to parking stresses in the area, to the inconvenience of other road users. At best, it would have a marginal impact on de-cluttering the highway, but none at all if the occupants of No 197 made use of the space in front of the crossover for additional parking as intimated at page 9 of the appeal statement.
In an appeal decision in 20171, an Inspector found that a vehicular access with a crossover at No 197 would have an adverse impact on highway safety. I have no persuasive reason to disagree with that conclusion, and I find that this scheme would also be detrimental to the safety and convenience of highway users.
As Core Policy 24 of The Enfield Plan Core Strategy 2010-2025 (2010) is directed principally at the main road network, sustainable travel choices and infrastructure, it is of limited relevance on this issue. However, the scheme would conflict with its Core Policy 30; and with Policies T1, T2 and T6 of the London Plan (2021).
Amongst other things, and in general terms, these require development to mitigate impacts on London’s transport networks, and create or maintain, safe and efficient environments. [address] may not be a ‘busy classified road’, as the scheme would add to on-street parking pressures and have an adverse impact on road safety, and as vehicles would not be able to enter and exit in a forward gear and there is a strong likelihood that they would overhang the footway, the scheme would also conflict with EDMP Policy DMD 46 parts c, d, e, f and h.
It would also conflict with paragraphs 115 and 117 of the National Planning Policy Framework (2024) which set out the need to achieve safe and suitable access for all users, and to minimise the scope for conflicts between pedestrians, cyclists and vehicles; and with the advice in the [name] for 1 APP/Q5300/D/17/3177562 [name] (2013) which seeks to safeguard highway safety for all users and ensure that traffic flow is maintained.
For these reasons, and having regard to all other matters raised, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 450No official casework-database value to compare
- Extracted decision date · page 1
- 22 September 2025Matches the official casework database
- Extracted site visit dates
- 15 September 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3369380
- Application reference
- 24/00570/HOU
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Enfield
- Planning authority code
- E09000010
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 16 July 2025
- Valid date
- 16 July 2025
- Start date
- 23 July 2025
- Planning authority decision date
- 4 June 2025
- Appeal decision date
- 22 September 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 76730
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21