Appeal 3369443
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a single storey rear extension and internal alterations.
Section 02
Decision
The appeal is allowed, and planning permission is granted for a single storey rear extension and internal alterations at [site address] in accordance with the terms of the application, [name]/25/0167, subject to the conditions set out in the accompanying Schedule.
Section 03
Preliminary matters
The appeal property is a detached, brick-built, relatively modern dwelling in a cul-de-sac with a well-designed layout wherein the attractive landscaping, which includes a variety of trees and shrubs, is maturing and is well maintained. Many older mature and semi-mature trees are evident both within and on the peripheries of the cul-de-sac, and some are protected by Order. This is a pleasant development on the northern fringes of Reading in a verdant setting.
The appellants wish to erect a single storey rear extension. The Council has no objection to the design or materials proposed and nor does it consider, subject to safeguards, that neighbouring living conditions would be harmed. I share its view on these aspects. It’s concerns centre on the effect of the proposed development on an oak growing in the back garden. The oak is protected by Order1.
Section 04
Main Issue
The main issue is the effect of the development on a protected tree.
Section 05
Reasons
Policy EN14 of the Reading Borough Local Plan (LP) provides that individual trees, groups of trees, hedges and woodlands will be protected from damage or removal where they are of importance, and the supporting text to the policy says that: 1 As part of Order 73/003 which protects 21 trees and 2 groups. ‘The Council will seek to ensure that appropriate measures are secured for the successful protection of trees, in line with good practice, where retained as part of development proposals...’
The appellants were clearly aware of the importance attached to the protection of this tree by the Council because they appointed a firm of arboriculturists at the outset. This firm was familiar with the site since they were also involved in providing advice on an earlier development involving the construction of an outbuilding at the end of what is an L-shaped garden. This was granted planning permission last year and was in place when I visited.
A report was prepared which provides an assessment on the age and condition of the tree, and makes recommendations on foundation design, since the building would affect part of the Oak’s root protection area (RPA). The report also contains recommendations for the tree’s (and other trees’) protection during the construction period.
The report was subject to scrutiny by the Council’s inhouse specialist who produced a lengthy and detailed response to consultation, relying principally on the advice and guidance provided in BS58372. The main concerns related to possible root damage during the construction period and how that would likely affect the tree’s future. Equal concern was raised at the prospect of the Council receiving future requests to prune the tree, since part of the canopy projected towards and over the proposed extension.
Both parties agree, as do I, that the incursion into the oak’s RPA would be minor. Contrary to normal practice the appellants do not intend to use conventional foundations, but having regard to the proximity of the protected oak will instead use block and beam foundations set upon screw piles, which in my experience is a tried and tested methodology in such circumstances. The required shallow excavations would be hand dug. The treatment of any significant roots exposed during the excavation would be under the supervision of an attendant arboriculturalist, rather than left to the general workforce, who may well be unqualified in these matters. Having regard to the minor nature of the incursion and the tree protection measures otherwise proposed, I am satisfied that this is an acceptable way forward.
The Council’s concern that it is likely to face future applications to prune the tree is, to my mind, justified, given that branches in the lower canopy would be adjacent to the extension, which would have substantial glazed areas. However, this has to be set against the general condition of the tree having regard, in particular, to past ‘works’ to it. In this respect the tree is accurately described in the accompanying tree report as having a below average physiology and an indifferent structure, and its physical condition is described in the following terms, having regard to past works: ‘Many occluded, partially occluded and unoccluded pruning wounds on trunk indicative of crown lifting and thinning; epicormic growth on internal branches suggestive of reduced physiological condition; asymmetrical canopy to S; notably reduced shoot extension lengths and slightly sparse bud density in apical extents..’
The effect of past works to the tree is that it is not a particularly attractive oak specimen in visual terms, and although it is protected, it is barely seen from outside 2 BS 5837 (2012) – Trees in Relation to Design, Demolition and Construction (2012), BSI. the site in the public realm and contributes little to general amenity. Further selective pruning at low levels, if such applications were made and granted, would in my view have little impact on the tree’s health, or its contribution to the general amenity of the area.
I note the comments made by the Council in respect of improving the health of the tree and the contribution made by trees generally to the environment. In this respect however I noted the level of new planting which had already taken place at the site along its boundaries, which is a welcome balancing contribution.
I conclude that the appellants have put in place appropriate measures for the oak’s protection, in line with good practice. Accordingly, I find no conflict with those provisions of policy of LP policy EN14 directed to protect trees such as the oak from damage or removal during development.
Section 06
Conditions
It is necessary that the development is carried out in accordance with the approved plans, and a condition to this effect is therefore imposed in the interests of certainty. A condition in respect of materials is imposed in the interests of visual amenity.
The Council has suggested the imposition of further conditions relating to the removal of permitted development rights and the use of the extension’s roof. I agree that such conditions are needed in the interests of protecting neighbouring living conditions.
I shall impose a further two conditions to protect the oak. The first to ensure that the works carried out are implemented in accordance with the recommendations of the appellant’s arboriculturalist. The second to provide the opportunity for a Council officer to be present on site, should it be considered expedient, to inspect the initial stages of the construction work, in particular, the limited excavation within the tree’s RPA.
Section 07
Other matters
All other matters raised in the representations have been considered, including the references to the National Planning Policy Framework, but no other matter is of such strength or significance as to outweigh the considerations leading to my
Section 08
SCHEDULE OF CONDITIONS
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: the site and block plans and drawing [name]: FD/452/624-[name]; FD/452/624-[name] & FD/452/624-[name].
Save where otherwise specified in the application documentation, the materials to be used in the construction of the external surfaces of the development hereby permitted shall match those used in the existing building.
Notwithstanding the provisions of the Town and Country Planning (General Permitted) Development Order 1995, or any order revoking and re-enacting that Order, no openings other than those shown on the approved plans shall be formed.
The roof of the extension hereby permitted shall not be used as a balcony, roof garden or for general amenity purposes.
All works of excavation and other safeguards with respect to the protection of trees and their roots shall be undertaken in accordance with the recommendations contained at Appendices 2 & 4 of the document entitled [name] by [name] dated February 2025.
Not less than 14 days before the commencement of any excavations the appellants shall provide written notice to the Council of their intention to commence excavations and shall allow access to the Council to the site to inspect the works of excavation as they progress.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2949No official casework-database value to compare
- Extracted decision date · page 1
- 7 October 2025Matches the official casework database
- Extracted site visit dates
- 29 September 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3369443
- Application reference
- PL/25/0167
- Lead case reference
- Not recorded
- Planning authority
- Reading Borough Council
- Planning authority code
- E06000038
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 17 July 2025
- Valid date
- 17 July 2025
- Start date
- 22 July 2025
- Planning authority decision date
- 28 April 2025
- Appeal decision date
- 7 October 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 77539
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21