Appeal 3369889
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
erection of guard rail at first floor level.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue is the effect of the proposed development on the living conditions of the residents of [name] in terms of its potential to result in an actual or perceived overlooking leading to a loss of privacy.
Section 04
Reasons
The appeal property [site address] is a two-storey detached dwelling. It is one of two new, contemporary houses built on a back land plot to the rear of [address], which in turn back onto the rear gardens of the properties in [name] at a lower level.
Due to the design of the dwelling, there are a number of flat roof areas, however this appeal relates solely to a sedum planted flat roof, at the rear of the house, and accessed from the master bedroom at first floor level.
The Council when granting planning permission, Ref: BH2024/03092 included two conditions, (numbered condition 15 and 16). Condition 15 being to control the use of the flat roof areas. The condition states that: Access to the flat roofs on the dwelling hereby approved shall be for maintenance or emergency purposes only and no flat roof shall be used as a roof garden, terrace, patio or similar amenity area. Condition 16 required the sedum roof to be permanently maintained.
The appellant wishes to erect a 1.1 metre high clear glazed balustrade as a guard rail around two sides of the roof to allow safe access for maintenance of the sedum roof, window cleaning etc. Although the design would be appropriate to the style of the house it would give the flat roof the appearance of a roof terrace.
Notwithstanding conditions 15 and 16 the Council when considering the planning application, now at appeal, were concerned that the installation of the proposed balustrade guard rail would result in the potential for the condition to be breached. Thereby resulting in the roof being used for amenity purposes. In these circumstances it felt it would be difficult enforce the condition.
Due to the size of the roof, its location, views to the south west and its convenient access from the master bedroom I consider that it would be tempting for both current and future occupiers to utilise it as a roof terrace. As the roof is located at the rear of the dwelling and as it may only be used intermittently, I concur with the Council that conditions 15 and 16 would in this case be onerous to enforce.
The large, glazed corner window in the south-west and south-east elevations currently allows overlooking of the rear gardens of the dwellings in [name]. Nevertheless, due to its elevated location if the flat roof were used as a terrace, it would give rise to a significant increase in overlooking. Further, if there were a gathering of people on the roof there would also be the potential to disturb the quite enjoyment of the residents in [name] resulting in further harm to living conditions.
[name] saw the master bedroom does not have an openable window or alternative means of ventilation. Therefore, the door onto the roof is the only means of ventilation to the bedroom. As it is neither of a tilt and turn or sliding design it cannot currently be locked in a position to allow ventilation without access to the roof. Further there is no guarding to the door opening. Accordingly, there is the risk of the unwary wandering on to the flat roof and possibly falling 4.5 metres or so to the garden below. However, I believe that there are a number of ways this concern could be addressed without the erection of a balustrade and guard rail proposed or thereby impacting on architectural styling of the property.
Further the maintenance of flat and even sloping roofs always requires safe access for maintenance and repair and there are a number of alternative standard design solutions that could be adopted to allow trades people to work safely at height, as they will have to on the other flat roofs here, without the need for the fully enclosing balustrade proposed. Moreover, therefore I am not persuaded that the objective of safer access to the roof could not be achieved by other means.
I conclude in respect of the main issue that not withstanding condition 15 there is the very real prospect that if the balustrade as designed were to be erected this roof could be used as a roof terrace or as a general amenity space. This in turn would result in harm to the living conditions of the occupiers of the residential properties in [name]. To allow the development would therefore be contrary to the objectives of Policy DM20 of the Brighton and Hove City Plan Part Two ([name] 2022), which aims to ensure, amongst other things, that development does not cause ham to residential living conditions.
Section 05
Other Matters
In reaching my determination I am aware that the original approved design allowed for a larger roof terrace to serve the master bedroom on the rear elevation of the house. However, I have no detail of that proposal and what measures were incorporated to protect the residential living conditions of neighbouring occupiers. In any event, given the current configuration of the house as built this is not a realistic fall back position. I have therefore given this consideration very little weight in my deliberations.
Section 06
Conclusion
Accordingly, for the reasons given above and having regard to all other matters raised, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 1184No official casework-database value to compare
- Extracted decision date · page 1
- 26 September 2025Matches the official casework database
- Extracted site visit dates
- 27 August 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3369889
- Application reference
- BH2025/00975
- Lead case reference
- Not recorded
- Planning authority
- Brighton and Hove City Council
- Planning authority code
- E06000043
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 0 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 24 July 2025
- Valid date
- 24 July 2025
- Start date
- 1 August 2025
- Planning authority decision date
- 1 July 2025
- Appeal decision date
- 26 September 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 77004
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:28
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21