Skip to main content
Official casework recordAllowedCurrent release

Appeal 3370099

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

8 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

described as replacement of 25 linear metres of timber quay heading using multi lock plastic piling as per the [name] installation also on [name]; Removal and replacement of existing walkway decking (as indicated on aerial plan) using redwood treated timber; Installation of 10no. 89r screw piles to a depth of approx. 15m to be used as supports for timbers to stabilise poor ground conditions in driveway entrance to property.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for the replacement of 25 linear metres of timber quay heading using multi lock plastic piling as per the [name] installation also on [name], removal and replacement of existing walkway decking (as indicated on aerial plan) using redwood treated timber, installation of 10no. 89r screw piles to a depth of approx. 15m to be used as supports for timbers to stabilise poor ground conditions in driveway entrance to property at [name], [name], [name], Horning, Norfolk [postcode] in accordance with the terms of the application, [name]/2025/0045/HOUSEH, subject to the following conditions:

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with drawing numbers: Location Plan, Site Plan, [name] and Sheet 1 of 1 (Typical Cross Section).

    Prior to the installation of the piling hereby permitted, details of the materials, including the type, profile and colour finish, to be used in the construction of the piling shall be submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details.

  2. Section 03

    Preliminary Matters

    The application form states that the site address is ‘[name], [name], whereas the decision notice refers to the site as ‘[name], [name] and the appeal form states that the site address is ‘ [site address] , [site address] ’. I have taken the address from the decision notice as this is more precise. I do not consider that this has prejudiced any of the parties.

    The description of development in the heading above and my formal decision has been taken from the application form. Neither of the main parties has provided written confirmation that a revised description of development has been agreed. Accordingly, I have used the description given on the application form. I do not consider that this has prejudiced any of the parties and I have proceeded with the appeal on this basis.

  3. Section 04

    Main Issue

    The main issue is the effect of the proposed development on the character and appearance of the area.

  4. Section 05

    Reasons

    The appeal site comprises a residential plot accessed from [address]. The site is part of [name], which consists of several plots arranged around dykes served by the [name]. The area is primarily wooded marshland with the residential properties largely set within the woodland adjacent to the dykes and the [name]. The site consists of an existing building with timber decking along the water’s edge and a small area of lawn. While the area has a verdant character, the existing moorings in the area, including on the opposite bank, provide a more formal, engineered edge to the waterway.

    The site is within the Broads. The Broads has the same status as a National Park, the duties of which are described by the Broads Authority as being to seek to further the purposes of conserving and enhancing the natural beauty, wildlife and cultural heritage of the Broad, promoting opportunities for the understanding and enjoyment of the special qualities of the Broads, and protecting the interests of navigation.

    The proposal includes the replacement of the existing timber quay heading using multi lock plastic piling. Timber waling boards would be attached to the multi lock piling and would be topped with timber coping. The cross-section drawing indicates that there would be double height timber waling boards affixed to the plastic piling. The timber finish would obscure the piling and retain the predominantly timber appearance of quay heading in the area, including at the site. Visibility of the piling would be restricted, and the piling would mainly be exposed beneath the waterline. While the waterline may fluctuate, the double timber waling boards would not leave the piling unduly visible above the waterline.

    The use of plastic piling is uncommon on either side of the dyke and an extensive and conspicuous use would harmfully erode the natural, verdant character of the area. However, given that the piling would be largely obscured by the timber waling, coping and decking, which the Council considers to be an acceptable material finish, the discreet use of plastic piling would not harm the prevailing character and appearance of the area. The use of a dark colour finish, which could be secured by a condition if I were minded to allow the appeal, would ensure that the piling would blend with its surroundings, particularly if the timber coping and waling eroded over time.

    The Council has not raised concerns in respect of the proposed timber decking and screw piles, whilst the proposal would not affect navigation within the dyke and the [name]. Based on the substantive evidence before me, I see no reason to reach a different conclusion.

    I conclude that the proposal would not harm the character and appearance of the area. The development therefore complies with Policies SP7, DM16, DM43 and HOR3 of the Local Plan for the Broads 2019, which collectively seek to ensure that development proposals are appropriate to the character and appearance of the Broads paying particular attention to the defining and distinctive qualities of each site and its setting, conserve and enhance the key landscape characteristics of the Broads, use detailing and materials of high quality and appropriate to its context and that the maintenance or upgrading of existing buildings will be encouraged, and their replacement permitted, where this is consistent with the openness and the low key and lightweight forms of building.

  5. Section 06

    [name]

    Schedule 7A of the Town and Country Planning Act 1990 (as amended) introduced a statutory framework for biodiversity net gain (BNG), and it applies to all planning applications for non-major development submitted on or after 2 April

    Under the statutory framework, subject to some exceptions, every grant of planning permission is deemed to have been granted subject to the [name] (BGC), which requires that at least a 10% increase in biodiversity value is met. However, the Planning Practice Guidance states that the BGC does not apply to householder development, such as the appeal proposal. Accordingly, the BGC does not apply.

  6. Section 07

    Conditions

    In addition to the standard time limit condition, I have imposed a condition requiring that the development is carried out in accordance with the approved plans. This is in the interests of certainty. To safeguard the character and appearance of the area, a condition is included requiring details of the type, profile and colour finish of the plastic piling to be provided.

    The Council’s Ecology Team has suggested conditions in respect of biodiversity and ecology. Given the limited scale and the nature of the proposed development, particularly with regard to BNG, and the availability of other legislation if harm occurs to protected species and/or their habitats, I consider the suggested conditions are not reasonable or necessary in this instance.

  7. Section 08

    Conclusion

    For the reasons given above the appeal should be allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 20880No official casework-database value to compare
    Extracted decision date · page 1
    28 November 2025Matches the official casework database
    Extracted site visit dates
    17 November 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3370099
Application reference
BA/2025/0045/HOUSEH
Lead case reference
Not recorded
Planning authority
Broads
Planning authority code
E26000007

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
Not recorded
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
29 July 2025
Valid date
29 July 2025
Start date
18 August 2025
Planning authority decision date
19 May 2025
Appeal decision date
28 November 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
80562
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21