Appeal 3370320
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
9 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
described as a “single storey side extension to semi-detached house”.
Section 02
Decision
The appeal is allowed and planning permission is granted for a single storey side extension at [site address] , Walton-on-Thames, Surrey [postcode] in accordance with the terms of the application, Ref 2025/0158, subject to the following conditions:
The development hereby permitted shall begin not later than three years from the date of this decision.
The development hereby permitted shall be carried out in accordance with drawing [name]/1541/1 (Location Plan and Proposed Site Plan) and AL/1541/1 (Existing and [name] and Elevations).
The external materials of the extension hereby permitted shall match those used in the existing dwelling.
Section 03
Appeal Procedure
The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.
Section 04
Preliminary Matters
The description of development within the banner heading is taken from the application form. However, this has been amended in the decision above for clarity, to exclude elements that are not in themselves development.
Section 05
Main Issue
The main issue is the proposed development’s effect on the character and appearance of the surrounding area.
Section 06
Reasons for the Recommendation
[address] is characterised by mainly detached and semi-detached dwellings, of varied but traditional design. There is a legible sense of uniformity within the urban form, achieved through moderately generous plot sizes and the setting back of dwellings from the highway, which creates a distinct, primary building line along [address]. [address] is perpendicular to [address] and is characterised primarily by single storey dwellings to its northern edge which, in themselves, form a coherent primary building line.
The appeal site comprises a two-storey semi-detached dwelling, with its principal elevation facing onto [address] and the side facing on [address]. The front of the house is strongly aligned with the [address] primary building line. As a corner plot, it is somewhat wider than most nearby, with the host dwelling set within an L-shaped garden.
In this context, the side elevation of the appeal dwelling is clearly distinguishable as a secondary building line, distinct from the primary building line of [address]. This differentiation is reinforced by the relatively large gap between the appeal dwelling and the house at [address], and by the contrasting scales of dwellings in the two roads. Overall, there is a clear visual separation between the primary building lines in each street, which contributes to the character of the area.
The proposed development would introduce a single-storey side extension, which would be clearly subservient in scale to the host dwelling and set back from the primary building line on [address]. Despite its siting on a corner plot, the width of the extension means that it would also be set suitably back from the edge of the site at [address]. Consequently, in combination with its modest height, external materials that match those of the host dwelling, and partial screening by the boundary fence, the proposed development would not appear obtrusive from either street. This is notwithstanding the smaller scale of the side extension opposite at No 74.
Furthermore, the proposed configuration would be consistent with guidance in the [name] (the SPD), which sets out that primary building lines are defined by the external wall of the main building in relation to the street, whilst the secondary building line relates to single storey projections that have a more subtle effect on the character of the street. For the reasons given, the proposed development would read as a secondary building line. It would therefore respect the primary building line in both roads and the contribution of this street layout to the character of the area.
The Council has drawn my attention to a previously refused planning application for a side extension at the appeal site. I do not have all the details of that scheme before me, but I understand its dimensions were deeper and wider than those of the appeal proposal, so it had a larger footprint and less discrete profile than the current scheme. Furthermore, I understand the decision in that case predated the policy context and design guidance that now apply. I therefore give only limited weight to that earlier decision as a material consideration in this case.
For the above reasons, I conclude that the proposed development would have an acceptable effect on the character and appearance of the surrounding area. Accordingly, I find no conflict with Policy CS17 of the [name] 2011 or Policy DM2 of the Elmbridge Local Plan Development Management Plan 2015. Among other things, these Policies aim to ensure that development integrates sensitively with the locally distinctive townscape and preserves or enhances the character of the area, including with regard to prevailing building patterns and the character of the host building.
Section 07
Conditions
I have considered the conditions put forward by the Council and have amended the wording where necessary in the interests of clarity and simplicity. In addition to the standard time limit condition, I recommend a condition requiring that the development is carried out in accordance with the approved plans. This is in the interests of certainty.
A condition securing matching materials is necessary to protect the character and appearance of the host dwelling and surrounding area.
Section 08
Conclusion and Recommendation
For the reasons given above and having had regard to all other matters raised, I recommend that the appeal should be allowed.
Section 09
Inspector’s Decision
I have considered all the submitted evidence and my representative’s report and on that basis the appeal is allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 19390No official casework-database value to compare
- Extracted decision date · page 1
- 17 December 2025Matches the official casework database
- Extracted site visit dates
- 18 September 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3370320
- Application reference
- 2025/0158
- Lead case reference
- Not recorded
- Planning authority
- Elmbridge Borough Council
- Planning authority code
- E07000207
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- Not recorded
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 1 August 2025
- Valid date
- 1 August 2025
- Start date
- 18 August 2025
- Planning authority decision date
- 9 May 2025
- Appeal decision date
- 17 December 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 81730
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21