Skip to main content
Official casework recordAllowedCurrent release

Appeal 3370578

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

10 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

garage conversion to create first floor level with linked extension to main dwelling, removal of conservatory, erection of flat roof rear/side extension with block paving to driveway and upgraded patio.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for garage conversion to create first floor level, with linked extension to main dwelling, removal of conservatory, erection of flat roof rear/side extension, with block paving to driveway, and upgraded patio at [site address] , [address], Colehill, Dorset, [postcode] in accordance with the terms of the application, [name]/HOU/2025/01828, subject to the conditions in the attached schedule.

  2. Section 03

    [name]

    The main issues are: • the effect of the proposed development on the character and appearance of [site address] and the surrounding area; and • the effect of the proposed development on trees.

  3. Section 04

    Character and Appearance

    [site address] is a detached, two-storey dwelling located near to the hamlet of Broomhill. It is relatively visible from [address] when approached from Broomhill, however there is a reasonably mature hedgerow that does obscure views of the dwelling when approached in the opposite direction. It also benefits from a garage that is linked to the dwelling by a brick wall, open fronted wood store and gate. Broomhill consists of a mix of housing types including thatched cottages, bungalows and two storey dwellings.

    The appeal scheme would result in the garage roof being raised however it would remain lower than the roof of the main dwelling. Whilst the garage is more visible than the dwelling when viewed from the public highway, it is set back considerably from [address]. Moreover, given the existing built form, including a wall which links the garage to [site address] , in my planning judgement, the appeal scheme would not be unacceptably greater in scale. Consequently, the appeal scheme would not, to my mind, introduce an incongruous urban feature. Furthermore, the design of the appeal scheme would retain the existing garage roof form. It would also include rendering to reflect that seen in the design of the main dwelling. Thus, it would be read within the overall context of the existing built form.

    Given all of the above, the appeal scheme would remain subservient to the main dwelling and would not to my mind result in unacceptable harm to the relatively rural character and appearance of the surrounding area. It therefore would comply with Policy HE2 of the Christchurch and [name] 2014 (the CS) insofar as it seeks to ensure developments are of a high quality as well as reflect their surroundings.

  4. Section 05

    Trees

    The Council in its second reason for refusal has highlighted concerns that insufficient information had been provided to adequately demonstrate that neighbouring trees on land immediately adjacent to [site address] and relevant root protection areas would not be harmed.

    The appellant has provided a Tree Protection Plan and [name] by GTree Ltd (the AMS) with their appeal documents. However, this did not form part of the evidence upon which the Council made its decision. Furthermore, interested parties have not been consulted upon the AMS therefore accepting the AMS may prejudice the interests of the interested parties. I have therefore proceeded to determine the appeal on the basis of the evidence upon which the Council made its decision.

    There is limited substantive evidence before me to adequately demonstrate whether or not the appeal scheme would result in unacceptable harm to neighbouring trees and root protection areas. However, given the small scale of the appeal scheme, the extant development on the site and the consultee comments from the [name], I am satisfied that the protection of the trees and root protection areas could be achieved by an appropriately worded

  5. Section 06

    condition.

    Given the above, the appeal scheme would not result in significant harm to trees and would therefore comply with Policy HE3 of the CS insofar as it seeks to ensure that development does not harm the landscape character of the surrounding area.

  6. Section 07

    Appropriate Assessment

    The appeal site lies within the zones of influence for the [name] site as well as the Holt and West Moors Site of Special Scientific Interest (SSSI).The Dorset Heathlands are an extensive network of lowland heath and the qualifying features of the Holt and West Moors SSSI includes dry heathland, wet heath which also include amongst other things the rare [name] and [name] as well as bog vegetation which notably contains the rare [name]. These habitats support a rich and typical fauna for heathland birds, reptiles and invertebrates including amongst other species the [name] and Nightjar, the rare [name], [name], [name] and [name].

    It has been established that new residential development within the zone of influence of the [name] site and the Holt and West Moors SSSI would likely result in harm to the protected areas through additional recreational pressure either alone or in combination with other proposals.

    The Dorset Heathlands Planning Framework 2020-2025 Supplementary Planning Document highlights, amongst other things, that extensions to residential dwellings where there is no net increase in dwellings i.e. extensions to houses are permitted to within 400 metres of the [name] without the need for mitigation.

    Natural England has been consulted as part of this Appropriate Assessment and is content that no mitigation is required as the appeal scheme would not result in harm to the [name] site or the Holt and West Moors SSSI.

    Accordingly, I conclude that given the appeal scheme is for extensions to an existing dwelling and would not result in a net increase in dwellings, it would not have an adverse effect on the integrity of either the [name] site or the Holt and West Moors SSSI.

  7. Section 08

    Conditions

    The Council has provided a list of suggested conditions. I have amended the wording of suggested conditions for clarity and to ensure accordance with the tests set out in paragraph 57 of the Framework.

    In addition to the standard time limit condition (1), I have attached a condition specifying the approved plans to provide certainty (2).

    I have imposed a condition requiring the external materials of the proposal to match those of the existing building to prevent the erosion of the area’s character. (4). A condition requiring the submission of an [name] and accompanying tree protection plan is necessary to protect hedgerows and trees (3).

    To prevent harm to ecology matters including protected species, I have attached a condition requiring the appeal scheme to be implemented in accordance with the lighting and enhancement measures detailed in the submitted [name] (5).

    Finally, it is necessary to attach a condition ensuring the development is occupied for purposes ancillary to [site address] in the interests of living conditions of existing and future occupiers (6).

    It is necessary for condition 3 to take the form of a ‘pre-commencement’ condition to have its intended effect regarding the protection of trees as well as hedgerows.

  8. Section 09

    Conclusion

    The material considerations do not indicate that a decision should be made other than in accordance with the development plan. For the reasons given above the appeal should be allowed.

  9. Section 10

    Schedule of Conditions

    The development hereby permitted shall begin not later than three years from the date of this decision.

    The development hereby permitted shall be carried out in accordance with drawing nos 04 [name] ([name]), 05 [name] ([name]), 07 [name] (Proposed Site, Block and [name]).

    No site clearance, preparatory work or development shall take place until a tree protection plan and an arboricultural method statement in accordance with the [name] 5837: Trees in relation to design, demolition and construction - Recommendations (or in an equivalent [name] if replaced) has been submitted to and approved in writing by the local planning authority. The arboricultural method statement shall include: i) a specification for protective fencing to trees and hedges during both demolition and construction phases and a plan indicating the alignment of the protective fencing; ii) a specification for scaffolding of building works and ground protection within the tree protection zones; iii) a schedule of tree work; iv) details of the area for storage of materials, concrete mixing and any bonfires; v) plans and particulars showing proposed cables, pipes and ducts above and below ground as well as the location of any soakaway or water or sewage facility; vi) details of any no-dig specification for all works within root protection area for retained trees; and vii) details of the supervision to be carried out by the developer’s tree specialist. The scheme for the protection of the trees shall be carried out as approved.

    The external materials of the extension hereby permitted shall match those used in the existing building.

    The development hereby permitted shall not be first brought into use unless and until the lighting, and enhancement measures as detailed in the [name], by Cherry Tree Ecology Ltd, dated 5 March 2024, have been completed in full. The mitigation and enhancement measures shall be maintained and retained in accordance with the approved details thereafter.

    The development hereby permitted shall not be occupied at any time other than for purposes ancillary to the residential dwelling known currently as [site address] , [address], Colehill, Dorset, [postcode] . =========END OF SCHEDULE========

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 4725No official casework-database value to compare
    Extracted decision date · page 1
    2 December 2025Matches the official casework database
    Extracted site visit dates
    5 November 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3370578
Application reference
P/HOU/2025/01828
Lead case reference
Not recorded
Planning authority
Dorset
Planning authority code
E06000059

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Unknown
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
Yes
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
5 August 2025
Valid date
5 August 2025
Start date
6 August 2025
Planning authority decision date
22 May 2025
Appeal decision date
2 December 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
80686
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21