Appeal 3371915
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
a single storey front extension.
Section 02
Decision
The appeal is dismissed.
Section 03
Main Issue
The main issue in this appeal is the effect of the single storey front extension on the character and appearance of the host dwelling and the area.
Section 04
Reasons
The appeal property is a two-storey residential dwelling positioned at the end of a short terrace of 6 dwellings (No 2 to [address]). All of the properties in the terrace have a simple single storey front projection with a lean-to roof, as do those in a neighbouring terrace to the west (No 2 to [address]). Except for the appeal property’s small porch, there has been very little in the way of physical alterations to these properties. Consequently, the repeated pattern of their front projections results in a consistent and attractive form of residential development which makes a positive contribution to the character of the area.
The appeal proposal would replace the property’s porch with an extension of approximately 4 times its size which would encompass the entire width of the front projection. As a result, it would have more impact than the porch, protruding significantly beyond the building line of No 4 and [address], disrupting the established rhythm of the development in the street. Furthermore, the flat roof would be at odds with the lean-to roof which would further accentuate its incongruous front projection.
It is suggested that screening from a neighbour’s high-level boundary wall would reduce the visual impact of the proposal, however this would not counter its overtly forward projection when viewed from the opposite side of the street or whilst approaching the development from the east.
Although other properties within the terrace have low front boundary walls, or are located closer to the footpath, they still maintain the repeated rhythm of the front projection.
Even though the extension would be constructed of matching brickwork and the placement of its openings would align with the host property, these design details would not be sufficient to outweigh the harm I have found above.
Consequently, for the reasons set out above, I conclude that the development would harm the character and appearance of the host dwelling and the surrounding area. It would therefore conflict with Policy LP 28 and Policy LP 50 of the Bracknell Forest Local Plan 2020-2037 which require a high standard of design that responds to the character of the local area. For the same reason the proposal would also conflict with the National Planning Policy Framework.
Section 05
Other Matters
In support of the appeal, my attention was drawn to other properties in the surrounding area that have been extended to the front in a similar manner to that proposed. However, with the exception of [address], they are located in different streets, as such, the context would differ to that of the scheme before me. Furthermore, No 5 is of a different style to the appeal property, therefore these developments do not lead me to a different view in this case.
The evidence refers to potential alternative development options in the form of a rear extension, alterations to the roof and front boundary treatments that could be erected by exercising the appellant’s permitted development rights. However, these developments are not directly comparable to the appeal proposal. Furthermore, I have not been provided with any details of the developments so I cannot be sure that they would represent a realistic or probable alternative. I have therefore given these potential alternative development options little weight.
I appreciate that there has been no objection from neighbours regarding the proposal and that it would not be detrimental to the living conditions of neighbouring residents or highway safety and parking. However, the appeal proposal’s compliance with the development plan in these respects is a neutral consideration.
Section 06
Conclusion
For the reasons given above, I conclude that the proposal would conflict with the development plan as a whole and there are no material considerations that indicate that the development should be determined otherwise than in accordance with it. Therefore, the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4996No official casework-database value to compare
- Extracted decision date · page 1
- 16 December 2025Matches the official casework database
- Extracted site visit dates
- 2 December 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3371915
- Application reference
- 25/00213/FUL
- Lead case reference
- Not recorded
- Planning authority
- Bracknell Forest Borough Council
- Planning authority code
- E06000036
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 186 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 28 August 2025
- Valid date
- 28 August 2025
- Start date
- 5 September 2025
- Planning authority decision date
- 12 June 2025
- Appeal decision date
- 16 December 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 81620
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21