A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
“installation of five electric vehicle charging stations and ancillary equipment within the car park”.
Section 02
Decision
The appeal is dismissed.
Section 03
Background and Main Issue
Planning permission has been granted at the appeal site for the installation of five electric vehicle (‘EV’) charging stations and ancillary equipment. Condition 3 of this permission restricts the use of the charging stations outside of the hours of 0700 and 0000.
The main issue is whether Condition 3 is necessary in order to protect the living conditions of existing occupiers of nearby properties with particular reference to noise and disturbance.
Section 04
Reasons
The appeal site is located within the car park of a McDonald’s restaurant, which I understand, operates between 0700 and 0000. The location of the proposed EV charging stations would be close to the boundary of the existing car park. The boundary treatment of the edge of the car park is substantial, however beyond this are the rear gardens of a number of residential properties, as well as a small area of public hardstanding.
There is no dispute that the restaurant closes at midnight. [name] saw no physical barriers to entering the car park after this time, it is reasonable to conclude that it is likely to be quiet. I cannot be certain that it would not be used for parking or congregation, however there is no substantive evidence before me that demonstrates that this is currently the case.
Therefore, the introduction of five EV charging stations, accessible on a 24-hour basis into the car park would likely lead to activity within it, where currently there is no, or very little, activity when the restaurant is closed.
I acknowledge that EVs do not have idling engines. However, using the charging points would involve doors opening and closing as drivers leave vehicles to access charging cables and interact with control panels. It would also involve a degree of time being spent at the charging station, even in the case of rapid chargers such as those proposed here. Therefore, it might also be expected that drivers will listen to car radios during charge periods or have telephone conversations either by handset or via in-car connectivity. Customers may also take the opportunity to spend some time outside of the vehicle, particularly in warmer weather, and if the vehicle is carrying passengers, this may also result in congregation close to the vehicle. These are all activities that would have the potential to generate noise, and if all five charging stations were in use, this would be multiplied accordingly.
There is no substantive evidence before me in terms of overnight background noise levels at the appeal site, nor in terms of the levels of noise likely to be generated by customers using the equipment. [name] saw the area is busy during the day, it is unclear whether this would be the case in the early hours of the morning. Given the car park would otherwise be expected to be unoccupied during these hours and having regard to the relatively close proximity of nearby residential properties to the charging stations, in the absence of evidence to the contrary, I cannot be certain that noise associated drivers making use of the EV charging stations, would not be intrusive, and potentially persistent.
I acknowledge that the Council considered within its [name] that the equipment itself would be unlikely to cause harm with regard to noise and disturbance. However, it clearly differentiated noise generated by the equipment from noise generated by customers, as is evident from the reason stated for the condition. Accordingly, the Council has not acted in a contradictory manner in attaching the condition.
Therefore, I cannot be certain that the unrestricted use of the proposed charging stations would not have an unacceptable effect on the living conditions of the occupiers of nearby neighbouring properties with particular regard to noise and disturbance. Condition 3 is therefore necessary, having regard to Policy DM2 of the Birmingham Local Plan Development in Birmingham Development Plan Document 2021 which states that all development will need to be appropriate to its location and not result in unacceptable impacts on the amenity of occupiers and neighbours, including in relation to noise.
Section 05
Other Matters
My attention has been drawn to permitted development rights relating to EV chargers and ancillary equipment set out at Schedule 2, Part 2, Class E of the Town and Country Planning (General Permitted Development) Order 2015.
At the time of the original application, Class E made provision, within an area lawfully used for off-street parking, for the installation of an upstand with an electrical outlet for the recharging of electrical vehicles, subject to a number of conditions. The appellant has acknowledged that the inclusion of ancillary equipment means that the proposal did not fall within the scope of Class E at the time of application. It is, however, contended that upstands alone would have been permitted development.
The wording of Class E was amended in May 2025. This brought ancillary equipment within the scope of permitted development, but also included a condition requiring such ancillary equipment to be located more than 10 metres from a residential curtilage. It is again contended that charging upstands alone would amount to permitted development under the revised wording of Class E.
In terms of fallback position, whether or not charging upstands alone would have comprised permitted development at the time of the original application, this wording of Class E has now been replaced, with no transitionary period. For the purposes of this appeal, it is now largely irrelevant.
The question of whether or not charging upstands alone, at the appeal site, would constitute permitted development in accordance with the current wording of Class E, falls outside of the scope of this appeal. I am aware that the appellant has made an application to the Council in order to confirm the lawfulness of such a proposal, however I understand that this has yet to be determined.
However, even if the installation of charging upstands in the locations proposed, or elsewhere within the car park would be lawful, and I were to accept that this formed a viable fallback position, the appellant has acknowledged that the ancillary equipment would not be permitted development. It would not, therefore, form part of the fallback position.
I understand that the ancillary equipment is required in order to facilitate high-power rapid charging. It is stated that a charging upstand without the ancillary equipment would be slower and less powerful. The two are therefore not wholly comparable or interchangeable, as a rapid charger would have the potential to deliver a higher turnover of vehicles, increasing potential noise disturbance through, for example, doors opening and closing as new customers arrive.
Overall, a greater level of activity at the charging points as proposed would be more likely to result in noise and disturbance, than at the slower charging points claimed to form the fallback position. Although the differences could be minor, there is no evidence before me to indicate that fallback position would be materially worse than the appeal scheme. As a result, the fallback position would not be a factor which weighs in favour of the proposal, such that it would outweigh the harm that I have found.
Erecting signs in relation to customer behaviour would not prevent unreasonable noise occurring. Although the display of such signs could be enforced, the actions requested on them could not be. Such advice would be particularly difficult to control given that the restaurant would be closed and therefore unstaffed, between midnight and 0700, and in any event would be a separate operation.
It is suggested that a planning condition could be used to restrict cumulative noise from plant and machinery, however such a condition would not extend to noise generated by those using the EV charging station. Consequently, this would not adequately mitigate the harm that I have identified.
I understand that the EV charging stations could not be switched off. However, this technical limitation does not render the disputed condition unenforceable. Rather, the condition limits the hours of use, and it would be readily apparent to the Council on a visit to the site whether this was the case. Moreover, there are other measures that could conceivably be used to prevent the use of the charging stations during the relevant hours other than disabling them, which means that the condition is not unreasonable.
I have been directed to a number of examples where operating hours restrictions for EV charging equipment have been relaxed. These decisions are all from areas outside of the Council’s control and will have been reached on the basis of individual circumstances and planning policy context, none of which is before me. [name] have had regard to these decisions, they are not determinative in my considerations.
Section 06
Conclusion
I acknowledge that the proposal would represent a means of mitigating climate change and would support the transition to net zero by improving access to EV charging infrastructure. Being mindful of Paragraph 168 of the National Planning Policy Framework, these are important considerations that weigh heavily in favour of the proposal.
However, this would not outweigh the unacceptable harm the removal of Condition 3 would have on living conditions of occupiers of nearby residential properties. The proposal therefore conflicts with the development plan as a whole and there are no material considerations of sufficient weight that would lead me to make a decision other than in accordance with this. Consequently, I conclude that the appeal is dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 2837No official casework-database value to compare
- Extracted decision date · page 1
- 6 February 2026Matches the official casework database
- Extracted site visit dates
- 9 December 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3372050
- Application reference
- 2025/00119/PA
- Lead case reference
- Not recorded
- Planning authority
- Birmingham City Council
- Planning authority code
- E08000025
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Planning Appeal
- Procedure
- Written Representations
- Development type
- Other minor developments
- Appeal type reason
- 4. Grant planning permission for the development subject to conditions to which you object
- Appeal reason
- Appeal Against Conditions
- Type detail
- Unknown
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- 0.0028 hectares
- Floor space
- 0 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 29 August 2025
- Valid date
- 9 October 2025
- Start date
- 14 October 2025
- Planning authority decision date
- 23 May 2025
- Appeal decision date
- 6 February 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 83943
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21