Skip to main content
Official casework recordDismissedCurrent release

Appeal 3372538

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

9 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

the “retention of works including demolition of garage and rear bay windows, replacement of mock tudor front façade with brick-effect cladding to first floor front bay window, erection of front extension, two storey side extension, single storey rear extension, and loft conversion to include rear dormer, x1 front and x2 side rooflights to dwellinghouse”.

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Appeal Procedure

    The site visit was undertaken by a representative of the Inspector whose recommendation is set out below and to which the Inspector has had regard before deciding the appeal.

  3. Section 04

    Preliminary Matters and Main Issue

    The description on the application form leaves some key elements of the proposal out. Whilst the decision notice is different, the description thereon is used by the appellant in both the appeal form and their statement. There was no agreement to a change; however, the description on the decision notice more accurately describes the development. I have referred to it above and, for the reasons I have set out, it would not prejudice either main party in making their respective cases.

    The Council has substantive concerns about the accuracy of the plans vs what has been applied for and subsequently built on site. The appellant acknowledges such and suggests they could be amended post decision should the appeal be allowed. Notwithstanding, and to clarify, I have considered the appeal on the basis of the plans referred to on the decision notice. The main issues in which are the effect of the proposal on a) the living conditions of the occupiers of Number [address] (No 210) and b) the character and appearance of the area.

  4. Section 05

    Living Conditions

    The appeal dwelling has been significantly extended; however, it is the rear extension that’s the subject of concern in terms of living conditions. It creates the new boundary between the two properties and as a result it would present as a sheer blank elevation which would further enclose the garden space and result in an unacceptably poor outlook when using it. Whilst there is a small outbuilding sitting along this boundary, the increased height and depth of the extension along with the track path of the sun would result in a large proportion of the garden, including the immediate patio area, to be shaded. In addition, and whilst there are some differences in land levels which have been agreed by the main parties, this would exacerbate the negative views experienced down the length of one side of the garden and the primarily usable space of the garden for sitting out.

    The scale and placement of the extension would also unacceptably compromise the outlook and light into the ground floor window to No 210 sited nearest it with the above in mind. The fact this window serves a kitchen does not mean expectations for such should be lesser.

    The Residential Extensions and Alterations Supplementary Planning Document (SPD) may suggest larger extensions are acceptable, in terms of depth. Be this as it may, this is not what is being considered. What may be seen as modest in depth and height in some locations, in this circumstance it would have a substantial impact on the neighbouring occupiers in the above terms. With this and the above in mind, the appeal scheme would harmfully affect the outlook and light for the occupiers of No 210. Resultantly, this element of the appeal would conflict with Policy DMP1 of the Brent Local Plan 2019-2041 (LP) and the [name] and [name] 2025. Amongst other things, these seek to ensure that the living conditions of occupiers of properties are protected.

  5. Section 06

    Character and Appearance

    The appeal building is situated within a row of large, detached dwellings of varying architectural styling some of which have been significantly extended. The appeal building has been previously extended as part of a previous permission to which this scheme seeks to regularise some of the works not built in accordance therewith. The Council, in regard to each individual element, has not raised any substantive concerns in terms of their impact on the character and appearance of the building or the area. Having regard to the architectural variance of the street scene and the degree of change between what appears to have been approved by the Council previously and what is being applied for here, I do not see a situation where one could convincingly argue that it would be the source of harm in regard to this main issue.

    I am satisfied therefore that the appeal scheme would be sympathetic to the evolved nature of the dwelling itself and the area, such that it would not harm its character and appearance. The proposal would thus comply with Policy DMP1 of the LP and the guidance within the SPD which together seek to ensure that development proposals are of a high-quality design and standard.

  6. Section 07

    Other Matters

    The National Planning Policy Framework places emphasis on sustainable development and the appellant has sought to effectively reuse previously developed land. However, I have been given no reason to suggest the building’s current residential use is at risk without the proposal and even if the scheme does take place on previously developed land, it would be the source of other planning harm in so being. My findings are therefore unchanged.

  7. Section 08

    Conclusion and Recommendation

    I have found in the appellant’s favour on the second main issue but this and other areas where the appeal scheme would be acceptable would be a lack of harm which would be neutral in any balance. There would be harm and subsequent development plan conflict arising out of the first main issue. There are no compelling reasons, taking into account other material considerations advanced, to deviate therefrom. I therefore recommend that the appeal should be dismissed.

  8. Section 09

    Inspector’s Decision

    I have considered all the submitted evidence and my representative’s report and on that basis the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 1895No official casework-database value to compare
    Extracted decision date · page 1
    17 October 2025Matches the official casework database
    Extracted site visit dates
    30 September 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3372538
Application reference
25/1563
Lead case reference
Not recorded
Planning authority
London Borough of Brent
Planning authority code
E09000005

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
Not recorded
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
4 September 2025
Valid date
4 September 2025
Start date
11 September 2025
Planning authority decision date
29 July 2025
Appeal decision date
17 October 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
No
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
78176
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21