Appeal 3372743
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
4 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
the extension and remodelling of the existing house.
Section 02
Decision
The appeal is allowed, and planning permission is granted for the extension and remodelling of the existing house at [site address] in accordance with the terms of the application, reference HPK/2025/0104, and the plans submitted with it, subject to the following conditions:
The development hereby permitted shall begin not later than three years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: Location plan; Site plans 15771 P11 [name], 15771-P12A, 15771 P13 [name] and 000001 DWB 00 04 [name] 00010 P01; Floor plans 15771 P14, 15771 P15 [name] and 15771 P16 [name]; Elevations 15771 P22 [name], 15771 P23 [name], 15771 P24, 15771 P25 [name], 15771 P26, 15771 P27, 15771 P28 [name], 15771 P29 [name], 15771 P31 [name] and CGI’s [name]; Materials as proposed (excluding conservatory).
No development above ground level shall take place until samples of all external facing materials; and details of hard surfacing, windows and boundary treatments, have been submitted to and approved in writing by the local planning authority. The development shall be carried out in accordance with the approved details.
Prior to the commencement of any above ground works to the garage or rear extension, a [name] and Enhancement Plan, including a timetable for implementation, including any tree, scrub or hedgerow clearance, shall be submitted to and agreed in writing by the local planning authority. This shall include measures such as soft landscaping proposals for the garage roof and garden areas; a detailed lighting strategy; roost features; bird boxes; bee bricks; and habitat piles. The measures shall be carried out in accordance with the approved plan and timetable and shall be retained thereafter. Appeal Decision: APP/H1033/D/25/3372743
Section 03
Main Issue
The main issue is the effect on the character and appearance of the area.
Section 04
Reasons
The proposal would result in a major refurbishment, including extensions, to this large, detached property. The house lies within the settlement of Charlesworth which is excluded from the Green Belt. Much of the settlement lies within the Charlesworth Conservation Area but this dwelling is excluded from it. It does however lie adjacent to the conservation area boundary and is prominent on the approach to the settlement from the south. The council’s officers recommended that the proposal be accepted but the planning committee resolved to refuse the application on the basis that it would be disproportionate in size compared to the original dwelling and the height, scale and massing would have an adverse impact upon the character of the landscape.
The proposal includes a number of elements, including the raising of the roof of the main existing part of the dwelling; a rear extension; and a garage extension to the side. I have considered each element in turn.
The proposed garage would be set at a low level to the side of the property. Given the boundary treatments and its position, it would have little wider prominence and would sit comfortably against the existing side elevation. The greater extent of driveway has not been raised as a concern, and I am satisfied that with appropriate materials this would be acceptable.
Raising the lower section of the main area of roof would align it with the existing higher part of the property. The existing higher section of roof and its associated gable, has the greatest impact on the conservation area and this relationship would not be significantly altered. The more unified roof form would have an acceptable appearance and would not, in any event, be highly prominent given its alignment with the existing higher roof area and given that it would be set against the backdrop of the rising ground beyond it.
The works to the rear of the property would be of a significant scale but would appear as subservient elements when viewed alongside the scale of the existing property. The new elements would not be prominent in views and would be set against the backdrop of the rising ground beyond. The design would be of a high standard. Overall, the design of the proposal has been well thought out.
It is proposed that the walls of the additions would be of matching stone and the new roofs would be of slate tiles. Subject to these more appropriate materials, replacing the existing areas of uncharacteristic render, the refurbishment would be beneficial with regard to the character and appearance of the property overall and would have no significant adverse impacts on the surrounding area.
The property at present is at odds with the character of the conservation area. It is a relatively modern outlier and given its scale and position above the settlement, it is a prominent feature when viewed from within the conservation area. However, as suggested by the council’s officers, the proposal would not result in harm to the setting of the conservation area or the nearby listed church. It would remain prominent but would be of an enhanced design and improved materials. Its greater scale would not add significantly to its prominence due to the main gable being Appeal Decision: APP/H1033/D/25/3372743 retained and the works being situated beyond that prominent element of the property.
Whilst the proposal would alter some views from the settlement and views when arriving into the settlement, the perceived changes would be minor and would not result in unacceptable harm, particularly given that a previously proposed conservatory has been omitted from the current plans. I have also considered the potential for overlooking of the properties below. These are overlooked to some extent by the existing high-level balcony but the opportunities for overlooking would increase. However, given the layout of the neighbouring properties and position of outbuildings, this would not result in unacceptable harm to the living conditions of those residents.
Given the above, the proposal would not result in conflict with the landscape, design or heritage requirements of policies EQ2, EQ6 or EQ7 of High Peak Local Plan 2016; the [name]: Supplementary Planning Document 2018; or the [name]: Supplementary Planning Document 2006. It would similarly not conflict with the National Planning Policy Framework as the development is likely to function well and given the materials proposed, has the potential to add to the overall quality of the area. As there are no other matters that weigh significantly against the proposal, I allow the appeal.
I have imposed conditions relating to the commencement of development and the details of the approved plans for the avoidance of doubt and in the interests of proper planning. The approved plans include details of materials, but I understand that a condition requiring samples of facing materials, tiles and surfaces has been agreed as a pre-commencement condition. Given the scope of the works, I have amended this to require that the materials are agreed prior to above ground works.
I have also imposed conditions that address issues such as nesting birds; a lighting strategy; and biodiversity enhancements, to safeguard nesting birds, avoid disruption to bat activity and to enhance biodiversity, to satisfy the aspirations of Local Plan policy EQ5.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 341No official casework-database value to compare
- Extracted decision date · page 1
- 6 November 2025Matches the official casework database
- Extracted site visit dates
- 27 October 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3372743
- Application reference
- HPK/2025/0104
- Lead case reference
- Not recorded
- Planning authority
- High Peak Borough Council
- Planning authority code
- E07000037
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 9 September 2025
- Valid date
- 9 September 2025
- Start date
- 12 September 2025
- Planning authority decision date
- 20 June 2025
- Appeal decision date
- 6 November 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 79231
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21