Appeal 3372948
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
8 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
extension of existing dropped kerb.
Section 02
Decision
The appeal is allowed and planning permission is granted for the extension of an existing dropped kerb at [site address] , [name], Croydon, London [postcode] in accordance with the terms of the application, Ref 25/01653/HSE and the plans submitted with it, subject to the following conditions:
The development hereby permitted shall begin not later than 3 years from the date of this decision.
The development hereby permitted shall be carried out in accordance with the following approved plans: [name] 01 (Site Location Plan V2), 02 (Existing Block Plan V2), 03 (Proposed Block Plan V2), 04 (Proposed Visibility Splay Block Plan V2), 05 (Existing and [name] V2), 06 ([name] and Section V2) and 07 ([name] and Section V2).
Prior to the first use of the access hereby permitted, details of the highway and pedestrian visibility splays to be provided within the site shall be submitted to and approved in writing by the local planning authority. The splays shall be provided in accordance with the approved details before the access is first brought into use and shall thereafter be retained and kept free of obstruction above a height of 0.6m.
Section 03
Preliminary Matters
I have removed the address from the description of development provided by the appellant as that is fully set out in the main heading.
Section 04
Main Issue
The main issue is whether the proposal would achieve a safe and suitable access.
Section 05
Reasons
The appeal property (No.79) is a three‐storey semi‐detached house within a continuous residential frontage on [address]. The road is A‐classified (A251), subject to a 30mph limit and has a largely straight alignment within the vicinity of the site. Front hard standings are a feature within this part of the street. They vary in width, with most served by dropped kerb crossovers and several being too small to permit turning on site. Immediately to the north are two recently built dwellings (Nos. 79A and 79B) with crossovers serving single/tandem spaces.
The frontage to No. 79 is hard‐surfaced. It is wider but shallower than No. 79B and is identically surfaced. A line of flush‐set paviours marks the common boundary. As there is no physical barrier between the two plots, the surfacing visually and functionally reads as a single continuous forecourt that permits unobstructed vehicle movement. On my site visit, the appeal frontage accommodated a single parked vehicle, indicating the forecourt is currently used for parking. Bins were placed against the southern boundary fence, which tapers to a modest height at the back of the footway.
The site directly adjoins the public footway. A streetlight is located close to the kerb mid-frontage and, to its south, tactile paving marks an uncontrolled pedestrian crossing with a central refuge. Double yellow lines extend across the frontage and past Nos. 79A and 79B and several properties to the south, beyond which restricted on‐street parking is available in both directions. Whilst my site visit was only a snapshot in time (undertaken at 15:30 and 17:45), these times broadly coincide with school pick‐up and the evening peak; I observed a steady but intermittent traffic flow at modest speeds and relatively limited pedestrian activity on the footway.
The proposal would extend the existing dropped kerb to a point just north of the streetlight to serve two side‐by‐side parking spaces within No. 79’s forecourt, with the bin storage retained. The arrangement would not allow routine on-site forward‐on/forward‐off manoeuvres, contrary to the Council’s Vehicle Crossover Guidelines, June 2021 (the Guidelines).
My site observations indicate that reversing manoeuvres are already commonplace on this street, with several neighbouring forecourts smaller than the dimensions the Guidelines seek for on‐site turning. Although those accesses likely pre‐date the Guidelines, I have seen no evidence to suggest that the existing pattern of frontage parking has created an inherent danger to road users. On the evidence before me, the principle of limited additional reversing would not be expected to materially worsen highway safety.
The Council notes that the proposed parking bays are not at 90 degrees to the footway, which could limit sightlines, and that a streetlight sits 0.7m from the crossover, short of the 1m recommended in the Guidelines. However, the alignment is only marginally shy of perpendicular and matches the arrangement at Nos 79A and 79B.
Manual for Streets states that the relevant measure is the visibility available where a driver pauses before entering the footway and carriageway. During my site visit and taking account of the carriageway alignment and the lack of continuous on‐street parking at the frontage, I find that a driver emerging from the access would be likely to achieve good intervisibility with pedestrians and vehicles. The streetlight would not notably affect this. There is also sufficient space for a pedestrian to pause safely clear of the proposed widened access, including users of the uncontrolled crossing, and the limited frequency of vehicle movements anticipated would not materially compromise pedestrian safety.
While concerns have been raised that the rearmost vehicle might enter the carriageway via the footway, the proposed crossover would correct the current arrangement, where site access is only possible across the footway. A dropped kerb would provide a smoother and safer entry and exit than the existing arrangement. The proposed side‐by‐side layout would operate similarly to tandem parking (only one vehicle would access the highway at a time) and would be an improvement for pedestrians using the footway.
The National Planning Policy Framework (Framework) requires that development achieves safe and suitable access for all users and that refusal on transport grounds should be justified only where the impact on highway safety would be unacceptable or the residual cumulative impacts severe.
In this case, the established pattern of frontage crossovers, the lack of recorded collisions and no technical evidence to suggest otherwise, together with my site observations, including that the existing hardstanding is already used for parking with manoeuvres on and off the carriageway, indicate that the modest level and types of movements generated would not give rise to an unacceptable or severe impact. The visibility available to a driver exercising reasonable caution is sufficient in the circumstances. Consequently, and notwithstanding the identified departure from the Council’s Guidelines, I conclude that the proposal would achieve a safe and suitable access and would formalise the existing pattern of parking and manoeuvring rather than create a markedly different use of the frontage. It would comply with Policy T4 of the London Plan (2021), Policies SP8, DM29 and DM30 of the Croydon Local Plan (2018), and the Framework, all of which seek to uphold highway safety.
Section 06
Other Matters
The Council is satisfied the development would preserve the character and appearance of the area and safeguard the living conditions of neighbouring occupiers. They also find it would comply with development plan policy [name] requirements. I have no reason to disagree with these conclusions, although compliance with the development plan in these respects is a neutral factor.
Section 07
Conditions
I have considered the conditions put forward by the Council against the Framework and where necessary have amended their wording in the interests of effectiveness and precision.
In addition to the standard time condition, I have imposed a condition requiring the development to be carried out in accordance with the approved plans, in the interests of certainty and for the avoidance of doubt.
The condition suggested by the Council requiring the external surfaces of the development to match the existing building is not necessary in this instance as the materials used for the access will differ from those on the existing dwelling.
The Council has suggested a pre‐commencement condition to secure highway visibility splays. Visibility splays are a relevant control, but the Council’s proposed wording should be amended to confirm that the required splays address both vehicular and pedestrian visibility and that they relate only to land within the application site. The condition should also specify the maximum height of any obstruction within the splays and require submission of the splay details prior to the first use of the access rather than prior to commencement of development.
Section 08
Conclusion
For the reasons given above, I conclude the proposal would accord with the development plan as a whole and the Framework, and therefore the appeal is allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 4672No official casework-database value to compare
- Extracted decision date · page 1
- 18 December 2025Matches the official casework database
- Extracted site visit dates
- 20 November 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3372948
- Application reference
- 25/01653/HSE
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Croydon
- Planning authority code
- E09000008
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- Not recorded
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 12 September 2025
- Valid date
- 12 September 2025
- Start date
- 8 October 2025
- Planning authority decision date
- 24 July 2025
- Appeal decision date
- 18 December 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 81846
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21