Appeal 3373143
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
10 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
construction of detached annexe.
Section 02
Decision
The appeal is allowed and planning permission is granted for replacement of existing outbuilding with detached annexe to the side of the main house with decking linking both and including associated landscaping at [site address] Road, Barcombe, [name] [postcode] in accordance with the terms of the application, [name]/25/0253, subject to the following
Section 03
conditions:
The development hereby permitted shall begin not later than three years from the date of this decision.
The annexe hereby permitted shall not be occupied until the dwelling permitted under references LW/23/0414 and LW/2024/0122, has been substantially completed and occupied.
The external materials of the annexe hereby permitted shall match those approved in the dwelling permitted under references LW/23/0414 and LW/2024/0122.
The development hereby permitted shall be carried out in accordance with drawing nos: [name] (09 rev P3 – [name] 2), [name] (08 rev P3 – [name] 1), 06 rev P1 – Indicative Foundation Plan, Proposed Block Plan (04 rev P2 – Proposed Block Plan 1:200), [name] (05 rev P3 – [name] and [name]), Survey Plan (03 rev P2 Existing Site Survey), Proposed Block Plan (02 rev P2 – Proposed Block Plan 1:500), Location Plan (01 rev P2 – Location Plan), Flood Risk Assessment (3185/RE/04- 23/01).
The development shall be carried out in accordance with the submitted flood risk assessment (FRA) (ref 3185/RE/04-23/01, dated June 2023) and the following mitigation measures it details: • Finished floor levels for the main building and annexe shall be set no lower than 8.19 metres above [name] (AOD). • The void maintenance plan outlined in [name] of the above FRA shall be maintained throughout the lifetime of the development. These mitigation measures shall be fully implemented prior to occupation and subsequently in accordance with the scheme’s timing/phasing arrangements. The measures detailed above shall be retained and maintained thereafter throughout the lifetime of the development.
The annexe shall be used only for purposes ancillary to the enjoyment of the host dwellinghouse and shall not be used as a separate unit of accommodation.
Section 04
[name]
The description of the development in the banner heading is taken from the application form. The Council has used an amended form of wording on the decision notice which I consider more accurately reflects the development and therefore I have used this in my formal decision.
Section 05
[name]
The main issues are: • Flood risk; and • whether the proposal would comply with development plan policy on residential annexes.
Section 06
Reasons
The appeal site comprises an existing detached single storey dwelling with detached outbuilding within a large garden accessed via a long private track. Planning permission has been granted for a replacement dwelling on the site (LW/2023/0414, amended by LW/2024/0122). Planning permission was granted for a garage in 2024 and this development has commenced. The appeal site lies within a countryside location.
The proposed development is for an annexe with a ground floor comprising a kitchen/dining area and living area, main bedroom and bathroom and a first floor mezzanine area in the roof space with a guest bedroom and en suite as well as a study. The annexe would be linked to the main dwelling via external decking and is designed to enable multigenerational living for the appellants family. The overall floor area of the annexe would be 84sqm and the height would be 6.9m. The annexe would be constructed of the same materials as the replacement dwelling and the appeal has been determined on this basis.
Section 07
Flood risk
The proposed annexe would fall within [name] 3. The appellants did not submit a development specific Flood Risk Assessment (FRA) for the proposal but submitted a site specific FRA prepared for the replacement dwelling on the site and confirmed the proposal would follow the same design approach as agreed with the Environment Agency (EA) for the replacement dwelling. The appellants consider that as the annexe would be tied to the occupation of the main dwelling, the approach of submitting the FRA for the main dwelling for this appeal would be acceptable. The appellants have also stated they would be happy for a similar condition as was placed on the main dwelling in relation to flood risk to be applied to the annexe.
The EA in their consultation response which was on the Council website for the appellants to view, have requested a FRA for the annexe. However, the appellants have submitted a site specific FRA which the EA did not acknowledge. I have reconsulted the EA with the submitted FRA and the EA have responded with no objection to the proposed development subject to conditions. I am therefore satisfied the proposal would not put the proposed occupants of the annexe at risk of flooding and would therefore comply with Core Policy 12 of the Lewes District Local Plan Part 1 (LLPP1) which seeks to reduce the number of properties that are at an unacceptable risk of flooding.
Section 08
Development plan policies on residential annexes
Policy DM29 of the Lewes Local Plan Part 2 (LLP2) sets out the key considerations in relation to garages and other buildings ancillary to existing dwellings, noting they will be permitted where given criteria are met, namely: (1) The size, scale, siting and design relates satisfactorily to the existing dwelling and its curtilage, the established street scene, and the character of the locality; (2) The use of materials is sympathetic to the character and appearance of the existing dwelling. Outside the planning boundaries.....garages and other ancillary buildings should be subordinate in scale and proportion to, and located in close proximity to, the principal dwelling; the use of ancillary accommodation as a separate dwelling will not be permitted and proposals should not be of a size or design, or be capable of severance, to form an additional dwelling or dwellings.
It is common ground that the proposed annexe would be subordinate in footprint and height to the replacement dwelling and would relate well to the replacement in terms of design and materiality.
Whilst the proposed annexe may be large, it remains smaller and subordinate to the replacement dwelling and would share the same access, parking and amenity space as the main dwelling, albeit with space to the side of the annexe which would be more private. The annexe would also drain foul and surface water back to the main house. The proposed positioning of the annexe and with a shared means of pedestrian access as the main dwelling demonstrates the annexe has not been designed to be sold off or let.
The site is large enough to accommodate an annexe of the size proposed. Whilst in a different location on the site it would be possible and practical to sever the annexe from the main dwelling, in these site specific circumstances it would be neither practical or desirable to do so.
The positioning of the annexe to the west of the replacement dwelling would mean that the residents of the annexe would need to walk directly in front of the main dwelling for pedestrian access, utilising the shared decking. The parking for the main dwelling and the annexe would be shared and located to the east of the main dwelling with no direct vehicular access to the annexe. It is also highly unlikely that a new vehicular access directly to the annexe could be provided due to the gradient of the site to the south of the annexe and the main dwelling and its location within the flood plain. Significant engineering works would be required to create a new access to the annexe which would require planning permission which would be under the control of the Council. For the reasons outlined above, it is highly unlikely the annexe would be able to be severed from the main dwelling.
The appellants have demonstrated their willingness to have a restrictive condition on the use of the annexe as ancillary accommodation enabling the Council to further control the use of the annexe and prevent it being severed from the main dwelling. In any event, the appellants have applied for an annexe and therefore the appeal should be taken at face value. The Council has enforcement powers in the event that the proposed development is not used as ancillary accommodation to the host dwelling.
In conclusion, the proposed development would meet the development plan criteria contained in policy DM29 of the LLP2 which permits ancillary buildings to existing dwellings.
Section 09
Conditions
I have had regard to the various planning conditions that have been suggested by the Council and appellant and have considered them against the tests in the Framework and the advice in the Planning Practice Guidance.
In the interests of certainty, I have imposed conditions specifying the relevant drawings, time limits and materials.
The appeal has been assessed on the basis that the replacement dwelling will be constructed. A condition is therefore necessary to ensure that the annexe is not occupied until the replacement dwelling has been substantially completed and occupied.
To reduce the risk of flooding to the proposed development and future occupants, a condition is imposed requiring the proposal to be carried out in accordance with the Flood Risk Assessment provided.
In order to prevent the creation of a separate dwelling on the site, a condition is imposed limiting the use of the annexe to purposes incidental to the enjoyment of the host dwelling and shall not be used as a separate unit of accommodation.
Section 10
Conclusion
For the reasons given above the appeal should be allowed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 40187No official casework-database value to compare
- Extracted decision date · page 1
- 15 June 2026Matches the official casework database
- Extracted site visit dates
- 15 December 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3373143
- Application reference
- LW/25/0253
- Lead case reference
- Not recorded
- Planning authority
- Lewes District Council
- Planning authority code
- E07000063
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 1. Refused planning permission
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 99 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Allowed
- Decision category
- Allowed
- Received date
- 16 September 2025
- Valid date
- 16 September 2025
- Start date
- 30 September 2025
- Planning authority decision date
- 25 June 2025
- Appeal decision date
- 15 June 2026
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- Not recorded
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 90377
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21