Appeal 3373279

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

7 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

outline application for redevelopment of the site to provide flexible employment space ([name](g)(ii) and (iii), B2 and B8) totalling 4,627sqm, ancillary parking and circulation space with all matters reserved except access and layout.

  1. Section 02

    Decision

    The appeal is allowed and planning permission is granted for outline application for redevelopment of the site to provide flexible employment space ([name](g)(ii) and (iii), B2 and B8) totalling 4,627sqm, ancillary parking and circulation space with all matters reserved except access and layout at [site address] in accordance with the terms of the application, [name]/24/1571, subject to the conditions in the attached schedule.

  2. Section 03

    Preliminary Matters

    Outline planning permission was originally granted under [name]/22/0518 for the development described in the banner heading, and subsequently varied by permission [name]/24/1571 to amend the wording of Condition 23. For clarity, I have used the original description of development in the banner heading and

  3. Section 04

    Main Issue

    The outline planning permission granted under [name]/22/0518 was subject to a number of conditions, including No 23 which limited operations to the hours of 06:00 to 23:00 Mondays to Saturdays and 07:00 -20:00 on Sundays and public holidays. The reason for the condition was to safeguard the tranquillity of the countryside and amenities of neighbouring properties.

    [name]/24/1571, the appellant sought to vary Condition 23 to allow deliveries and dispatches outside the specified hours of operation to all the units. The Council varied the condition to allow deliveries and dispatches outside the specified hours of operation to units 5-9 only. The reason for the amended condition was to safeguard the amenities of neighbouring properties in accordance with Policy 33 of the Horsham District Planning Framework November 2015 (HDPF).

    The main issue is the effect on the living conditions of existing residents of varying the condition to allow deliveries and dispatches outside the specified hours of operation to units 1-4 as well as units 5-9, having particular regard to noise.

  4. Section 05

    Reasons

    In order to secure anchor occupants to facilitate the build-out of the proposal, the appellant has indicated that 24 hour operation is required. Although the precise use to which the employment space would be put and the identity of the operators has not been confirmed, the Council has indicated that it wants new and fit-for-purpose commercial/employment floorspace to come forward such as that which has planning permission on the site.

    The site is situated between the A272 and A29, with housing located on the opposite side of the A29. The A29 passes through a cutting at this point and consequently does not screen the appeal site from the nearest houses in [address], [name] and [address]. The approved plans1 show units 1-4 located closest to the houses and facing away from the affected houses, thereby screening the service yards of all the units from the upper floor windows of the houses.

    The Council’s concern is that vehicles accessing units 1-4 would disturb the closest residents at night as a result of activities associated with loading, unloading and manoeuvring. Although reference has been made to the Council undertaking its own noise monitoring, I have not been supplied with noise monitoring data by the Council. The appellant has undertaken noise monitoring which indicates that the predicted noise levels of heavy good vehicle (HGV) movements associated with the units would be significantly below existing night time noise levels on the A29. As a consequence, night time noise levels would be below the threshold at which a nuisance would be caused to residents.

    The noise monitoring indicates that the majority of vehicles currently using the A29 at night are not HGVs, and the Council has raised a concern that increased HGV movements at the site would alter the character of night time noise. However, the appellant has explained that it is the frequency of traffic movements and the 1 LPA reference DC/24/1989 resultant noise generated, rather than the type of vehicle, which determines whether a nuisance would be caused.

    The Council has pointed out that night time traffic levels rise significantly after 5am rather than being constant throughout the night. Since the noise produced by HGVs manoeuvring at the site has been shown to be significantly lower than the noise generated by traffic using the A29, residents would not suffer sleep disturbance even when night time traffic levels are at their lowest.

    The proposal would increase the number of vehicles using the site’s access road at night. Approval has already been granted for units 5-9 to operate at night, with the approved plans showing units 5-9 being substantially larger than units 1-4 and capable of being serviced by large HGVs. Units 1-4 in contrast are smaller and designed only to accommodate 7.5 tonne vehicles, meaning that most vehicles servicing them are likely to be vans. Consequently, the night time noise associated with vehicles accessing units 1-4 would be modest compared with the noise generated by vehicles accessing units 5-9.

    The appellant initially undertook noise monitoring in support of a planning application2 which was submitted prior to the pandemic. Traffic levels on the A29 are now lower than pre-pandemic levels. The Council considers that as a result, the movements generated by the development would result in a proportionately greater increase in night time noise, compared with the pre-pandemic scenario. However, the appellant’s calculations show that the comparative difference in noise levels would be only just perceptible to residents, and thus insufficient to cause a nuisance.

    Planning Practice Guidance (the PPG) states that in taking account of the acoustic environment, decision makers should have regard to whether or not an adverse effect is likely to occur, and whether or not a good standard of amenity can be achieved. The weight of the evidence before me indicates that the proposal would not have an adverse effect on local residents at night time. The range of measures put in place by the appellant, including an operational noise management plan, would ensure an appropriate standard of amenity for nearby residents.

    I therefore conclude that varying the condition to allow deliveries and dispatches outside the specified hours of operation to all units would not harm the living conditions of existing residents, having particular regard to noise. The proposal would accord with Policy 33 of the HDPF, which requires developments to be designed to avoid unacceptable harm to the amenity of nearby occupiers, such as through noise.

  5. Section 06

    Conditions

    The PPG makes clear that decision notices for the grant of planning permission under section 73 should restate the conditions imposed on earlier permissions that continue to have effect. The Council has provided a list of suggested conditions which reflect those imposed on planning permission DC/24/1571. I have reviewed these conditions and agree that they are still relevant. For ease of cross referencing, I have retained the same numbering and indicated where originally attached conditions are no longer applicable. 2 LPA reference DC/19/0295

    As the development has been implemented, it is unnecessary for me to attach the commencement of development condition. In the interests of certainty, I have amended both condition 1 listing the approved plans and condition 2 concerning the approval of reserved matters. I have varied condition 12 to refer to the updated noise management plan, along with condition 23 to allow night time deliveries and dispatches for all the units.

  6. Section 07

    Conclusion

    [name] have concluded that the condition can be varied without harm to the living conditions of existing residents, the appeal is allowed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 5456No official casework-database value to compare
    Extracted decision date · page 1
    9 January 2026Matches the official casework database
    Extracted site visit dates
    10 December 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3373279
Application reference
DC/24/1571
Lead case reference
Not recorded
Planning authority
Horsham District Council
Planning authority code
E07000227

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Planning Appeal
Procedure
Written Representations
Development type
Major offices/R&D/light industry
Appeal type reason
4. Grant planning permission for the development subject to conditions to which you object
Appeal reason
Appeal Against Conditions
Type detail
Planning Appeals - Other
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
1.5 hectares
Floor space
4,627 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Allowed
Decision category
Allowed
Received date
18 September 2025
Valid date
18 September 2025
Start date
30 September 2025
Planning authority decision date
20 June 2025
Appeal decision date
9 January 2026

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
82538
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21