Appeal 3373383
Public case and site metadata stored from the official casework database, including fields that were empty in the source release.
A clearer next step
See how Inspectors approached issues like yours
Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.
- See which issues the decision appears to turn on
- Compare the facts and open the full appeal records
One private comparison
How the refusal review worksOne-off service · No subscription
Similar appeals are evidence to inspect, not a prediction of your outcome.
Official decision document
The decision, section by section
6 sections
Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.
Section 01
Development description
single storey rear extension:4.95 metres deep, 3.95 metres maximum height and 2.69 metres high to the eaves.
Section 02
Decision
The appeal is dismissed.
Section 03
[name]
The description of development above is taken from the decision notice as this succinctly describes the proposal. Both parties have used this in their submissions, so I am satisfied that no one is prejudiced by this approach.
Section 04
Background and Main Issue
Under Article 3(1) and Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (the GPDO), planning permission is granted for the enlargement of a dwellinghouse subject to limitations and conditions.
Where an application is made for a determination as to whether prior approval is required for development which exceeds the limits in paragraph A.1(f) but is allowed by paragraph A.1(g) to Part 1, paragraph A.4(3) provides that the local planning authority may refuse the application where it considers that the proposed development does not comply with the conditions, limitations or restrictions that are applicable to such permitted development. On this basis, it is the Council’s view that the height of the proposed development has not been measured from the ground level as stipulated in paragraph A.1(i) and would include the construction of a raised platform described in paragraph A.1(k)(i).
Consequently, the main issue is whether the proposal would be granted planning permission by Article 3, Schedule 2, Part 1, Class A of the GPDO.
Section 05
Reasons
As a result of the slope of the garden there is an existing raised patio at the rear of the appeal property, from which the height of the proposed extension has been measured. The Permitted Development Rights for Householders Technical Guidance (2019) (the HTG) states that reference to height in the GPDO is the height measured from ground level. Ground level is defined as the surface of the ground immediately adjacent to the building in question and would not include any addition laid on top of the ground. As the patio is laid on top of the ground it is not ‘ground level’ in the terms of the GPDO. On this basis, the way in which the eaves height has been measured is not consistent with the guidance.
It is not disputed that the ground level is not uniform at the appeal site. The HTG sets out that where ground level is not uniform, then the ground level is the highest part of the surface of the ground next to the building. Although the patio is the highest part next to the appeal property, and even if it is a consistent level, for the reasons given above, as it is laid on top of the ground, it is not the highest part of the surface of the ground for the purposes of the GPDO. Accordingly, the maximum height of the proposed extension has not been measured from the ground level, as required by GPDO paragraph A.1(i).
[name].1(k)(i) states that development is not permitted by Class A if it would consist of or include the construction or provision of a verandah, balcony or raised platform. The HTG clarifies that raised in relation to a platform means a platform with a height greater than 0.3 metres (m). The proposal includes an area beyond the proposed rear extension which the appellant contends is similar to a patio. It is also suggested that it would have no detrimental effect on neighbours, as a verandah, balcony or raised platform would. While that may be the case, I have no clear reason to find otherwise that a patio could be considered as a platform as it is a raised level surface on which people or things can stand on.
The Council indicate that this element of the appeal scheme would have a height greater than 0.3 m, and the HTG is clear that a raised platform is any platform with a height greater than 0.3 m. The proposed extension would therefore include the construction of a raised platform, and in line with [name].1(k)(i) would fall outside of the scope of permitted development.
To conclude, the proposed development would not be granted planning permission by Article 3, Schedule 2, Part 1, Class A of the GPDO.
Section 06
Conclusion
For the reasons given above, I conclude that the appeal should be dismissed.
Planning inspector and document dates
The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.
Appeal Decision
- Extracted inspector · page 1
- Inspector attribution ID 3895No official casework-database value to compare
- Extracted decision date · page 1
- 17 December 2025Matches the official casework database
- Extracted site visit dates
- 2 December 2025 (page 1)
Reference and authority
Official identifiers and the planning authority recorded against this case.
- Case reference
- 3373383
- Application reference
- PL/1462/25
- Lead case reference
- Not recorded
- Planning authority
- London Borough of Harrow
- Planning authority code
- E09000015
Casework details
The casework, procedure, development and linking details supplied by the official record.
- Casework type
- Householder (HAS)
- Procedure
- Written Representations
- Development type
- Householder developments
- Appeal type reason
- 3. Refused prior approval of permitted development rights
- Appeal reason
- Refusal
- Type detail
- Planning Appeals - Full
- Jurisdiction
- Transferred
- Link status
- Not Linked
Site and development
Published appeal-site measurements and planning designations, without the withheld precise location fields.
- Site area
- Not recorded
- Floor space
- 24 m²
- Number of residences
- 0
- Site in Green Belt
- No
- Agricultural holding
- No
- Affects setting of a listed building
- Not recorded
- Historic building grant made
- Not recorded
- Relates to a conservation area
- Not recorded
- Flooding is an issue
- Not recorded
- Site within an AONB
- Not recorded
- Site within an SSSI
- Not recorded
Decision and dates
The published outcome and every imported case date.
- Official decision
- Dismissed
- Decision category
- Dismissed
- Received date
- 21 September 2025
- Valid date
- 21 September 2025
- Start date
- 26 September 2025
- Planning authority decision date
- 16 July 2025
- Appeal decision date
- 17 December 2025
Case administration
Published recovery, call-in, costs and enforcement information for this case.
- Redetermined
- No
- Bespoke
- No
- Date recovered
- Not recorded
- Date not recovered or derecovered
- Not recorded
- Call-in date
- Not recorded
- Costs applied for
- No
- Enforcement grounds count
- Not recorded
- Enforcement grounds
- Not recorded
Source and catalogue history
When this record appeared in the rolling official release and when the catalogue stored it.
- Source
- Planning Inspectorate casework database
- Source data system
- Horizon
- Dataset status
- Current release
- Catalogue record ID
- 81755
- First seen
- 20 August 2026 at 14:25
- Last seen
- 20 August 2026 at 16:29
- Removed from release
- Not recorded
- Record created
- 20 August 2026 at 14:25
- Record updated
- 24 August 2026 at 16:21