Official casework recordDismissedCurrent release

Appeal 3373596

Public case and site metadata stored from the official casework database, including fields that were empty in the source release.

A clearer next step

See how Inspectors approached issues like yours

Bring your planning decision into a private workspace. We separate the disputed points, then match them with source-located Inspector reasoning from similar appeals.

  • See which issues the decision appears to turn on
  • Compare the facts and open the full appeal records

One private comparison

How the refusal review works

One-off service · No subscription

Similar appeals are evidence to inspect, not a prediction of your outcome.

Official decision document

The decision, section by section

5 sections

Read the development description and the Inspector’s text from the official decision PDF in source order. Source headings are retained where available. Personal and contact details are removed by an automated privacy filter; this is source material, not Rules for You analysis.

Section 01

Development description

single storey rear extension (Class C3).

  1. Section 02

    Decision

    The appeal is dismissed.

  2. Section 03

    Main Issue

    Under Article 3(1) and Schedule 2, Part 1, Class A of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended) (the GPDO), planning permission is granted for the enlargement of a dwellinghouse subject to specific limitations and conditions. The main issue in this appeal is whether the proposed extension would comply with the provisions of the GPDO.

  3. Section 04

    Reasons

    The appeal property comprises a two-storey detached house with an existing single storey extension that wraps around the side and rear of it. There is a generous garden to the rear, the level of which slopes down from the rear of the house.

    Planning permission is not granted by the GPDO where, amongst other things, the enlarged part of the dwelling would extend beyond a wall forming a side elevation of an original dwelling and would have a width greater than half the width of the original dwelling. In this case the proposed extension, which would not extend beyond the rear wall of the original dwelling by more than 8 metres, would not be attached to a side elevation of the original dwelling.

    However, having regard to paragraph (ja) of the GPDO and the Permitted Development Technical Guidance (2019) (the guidance), whether I agree it is logical or not, I must consider the total enlargement of the original dwellinghouse, which includes not only the current proposal, but also any existing enlargement of it, to which the proposal would be joined. The proposal would adjoin an existing extension, which does project beyond an original side wall, and which is more than half the width of the original dwelling. The combined enlargement of the original dwelling resulting from the existing and proposed extensions would exceed the allowances set out in the GDPO.

    The appellant states that case law and appeals confirm that extensions that meet the criteria should not be refused because of earlier additions. I am not aware of and have not been provided with copies of any such appeal decisions or case law.

    Furthermore, whilst not referred to in the Council’s decision, planning permission is also not granted by the GPDO (paragraph i) where the eaves height of the enlarged part of the house would exceed 3 metres in height, within 2 metres of the curtilage boundary. I noted that in this case, the proposed extension would only be approximately 1.5 metres from the boundary, and the extension would measure 3.8 metres to the eaves and 4 metres overall.

    The guidance confirms that even if an extension is within these limitations (it is set in 2 metres from the boundary and does not exceed 3 metres in height to the eaves) but it is being joined to a previous extension which exceeds these limits, it will not be permitted development. I have not been provided with the eaves height of the existing rear extension that the proposal would be attached to, but I noted that this is also within 2 metres of the curtilage boundary. Consequently, the eaves height of the existing extension would need to be below 3 metres in height to be further extended under the terms of the GPDO.

    The guidance states that the eaves height should be measured from the ground level of the external wall of the extension to the point where it would meet the upper surface of the roof slope. As no plans showing elevations and ground levels have been submitted, it is unclear whether the measurements provided refer to the height of the extension above the existing ground level adjoining the house, or above the ground level of the much lower garden, or whether the extension would step down. Due to the sloping ground levels, it is likely that the height measured above the ground from the external rear wall of the proposed extension would exceed the height limitations set out in the GPDO.

    As the Council was confident that the proposal would not constitute permitted development, it did not undertake any consultation with occupiers of the adjacent dwellings. [name] reached a different view to that of the Council, this consultation would have to have been undertaken, and any responses taken into account in reaching my decision. However, the absence of harm to, or the absence of objection from neighbours would not alter the fact that the proposal would not meet all of the relevant criteria necessary to benefit from deemed planning permission under the GPDO. I have no discretionary powers to grant planning permission for development falling outside of the scope of the GPDO under this procedure, regardless of whether or not I consider the proposal would result in any harm. As the proposal is not permitted development a full planning application comprising detailed plans would need to be submitted to and approved by the local planning authority, which would be subject to an assessment of harm.

  4. Section 05

    Conclusion

    I therefore conclude that the proposed development would not satisfy the criteria to be permitted development, under the terms of Article 3, Schedule 2, Part 1, Class A of the GPDO. For the reasons given above, the appeal is dismissed.

Planning inspector and document dates

The official casework attribution is grouped under a one-way keyed hash and shown only by its local identifier. Decision-letter dates and page references are extracted by fixed first-page rules and checked against that authoritative record.

  • Appeal Decision

    Extracted inspector · page 1
    Inspector attribution ID 164No official casework-database value to compare
    Extracted decision date · page 1
    19 November 2025Matches the official casework database
    Extracted site visit dates
    17 November 2025 (page 1)

Reference and authority

Official identifiers and the planning authority recorded against this case.

Case reference
3373596
Application reference
20251503
Lead case reference
Not recorded
Planning authority
Leicester City Council
Planning authority code
E06000016

Casework details

The casework, procedure, development and linking details supplied by the official record.

Casework type
Householder (HAS)
Procedure
Written Representations
Development type
Householder developments
Appeal type reason
1. Refused planning permission
Appeal reason
Refusal
Type detail
Planning Appeals - Full
Jurisdiction
Transferred
Link status
Not Linked

Site and development

Published appeal-site measurements and planning designations, without the withheld precise location fields.

Site area
Not recorded
Floor space
32 m²
Number of residences
0
Site in Green Belt
No
Agricultural holding
No
Affects setting of a listed building
Not recorded
Historic building grant made
Not recorded
Relates to a conservation area
Not recorded
Flooding is an issue
Not recorded
Site within an AONB
Not recorded
Site within an SSSI
Not recorded

Decision and dates

The published outcome and every imported case date.

Official decision
Dismissed
Decision category
Dismissed
Received date
24 September 2025
Valid date
24 September 2025
Start date
29 September 2025
Planning authority decision date
16 September 2025
Appeal decision date
19 November 2025

Case administration

Published recovery, call-in, costs and enforcement information for this case.

Redetermined
No
Bespoke
No
Date recovered
Not recorded
Date not recovered or derecovered
Not recorded
Call-in date
Not recorded
Costs applied for
Not recorded
Enforcement grounds count
Not recorded
Enforcement grounds
Not recorded

Source and catalogue history

When this record appeared in the rolling official release and when the catalogue stored it.

Source
Planning Inspectorate casework database
Source data system
Horizon
Dataset status
Current release
Catalogue record ID
79995
First seen
20 August 2026 at 14:25
Last seen
20 August 2026 at 16:29
Removed from release
Not recorded
Record created
20 August 2026 at 14:25
Record updated
24 August 2026 at 16:21